SLED Opportunity · NEVADA · NEVADA

    9095 Addendum 2 (UNR - Upgrade Booster Pump Station at Sierra Hall and Parking Garage

    Issued by Nevada
    stateRFQNevadaSol. 19819
    Closed
    STATUS
    Closed
    due May 7, 2026
    PUBLISHED
    Apr 9, 2026
    Posting date
    JURISDICTION
    Nevada
    state
    NAICS CODE
    238220
    AI-classified industry

    AI Summary

    Invitation for Bid to replace a domestic water booster pump and install ALC controls at UNR campus. Work scheduled May 18 to July 31, 2026, with electronic bid submission required.

    Opportunity details

    Solicitation No.
    19819
    Type / RFx
    RFQ
    Status
    Issued
    Level
    state
    Published Date
    April 9, 2026
    Due Date
    May 7, 2026
    NAICS Code
    238220AI guide
    Jurisdiction
    Nevada
    State
    Nevada
    Agency
    Nevada

    Description

    BCN Purchasing does not accept physical documents in response to any solicitation including but not limited to: ITB, RFP, RFQ, or CMAR solicitations. All documents must be submitted electronically via this website. The NGEM system allows for bidders to start and save work/uploads without submitting. Please make use of this capability to begin building your bid early and reduce the chances of internet connectivity or upload issues causing a last-minute inability to submit. Once the ITB/RFP/RFQ/CMAR closes and the responses are unsealed electronically, the list of bidders/responders will be posted online shortly thereafter and available to the public for viewing. This document can be accessed by clicking on Closed Bid Opportunities, selecting the specific opportunity, and scrolling down to Bid Documents. The Bid Tabulation document will be available for review there. Description of Work: Replace failing domestic water booster pump assembly and install ALC controls for campus BMS tie-in. UNR Project#: #26RNV03572 Labor Commissioner #: WA-2026-319 SPWD Project #: 26-B906 Estimated Cost Range: $45,000 to $145,000 Liquidated Damages: $200 per day Special Considerations: Perform work after dorm "Move Out" day to minimize shutdown impact. Coordinate exact date with UNR Construction Project Manager. Required Insurance if Awarded: Commercial General Liability, Business Automobile Liability, Workers' Compensation, and an Equipment Floater will be required. Builders Risk Insurance will be required if the award amount equals or exceeds $100,000. Rigger's Liability will be required if a crane is used. Please refer to the TEMPLATE-Owner-Contractor Construction Agreement on the Attachments tab for limits and additional information and in compliance with the requirements set forth here: https://www.unr.edu/bcn-nshe/risk/contracts. Completion of Work: Subject to change by Owner, Work is scheduled to begin on "May 18, 2026" and shall be fully complete by "July 31, 2026."

    Key dates

    1. April 9, 2026Published
    2. May 7, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.