    Invitation for Bid to replace and add pre-filters to Make-Up Air Units at UNR Health Science. Prevailing wage project with crane lifting required. Estimated cost $165K-$265K. Work scheduled from July 16 to August 11, 2026. Electronic bid submission only.

    Opportunity details

    Solicitation No.
    20002
    Type / RFx
    ITB
    Status
    Issued
    Level
    state
    Published Date
    May 28, 2026
    Due Date
    June 25, 2026
    NAICS Code
    238220AI guide
    Jurisdiction
    Nevada
    State
    Nevada
    Agency
    Nevada

    Description

    BCN Purchasing does not accept physical documents in response to any solicitation including but not limited to: ITB, RFP, RFQ, or CMAR solicitations. All documents must be submitted electronically via this website. The NGEM system allows for bidders to start and save work/uploads without submitting. Please make use of this capability to begin building your bid early and reduce the chances of internet connectivity or upload issues causing a last-minute inability to submit. Once the ITB/RFP/RFQ/CMAR closes and the responses are unsealed electronically, the list of bidders/responders will be posted online shortly thereafter and available to the public for viewing. This document can be accessed by clicking on Closed Bid Opportunities, selecting the specific opportunity, and scrolling down to Bid Documents. The Bid Tabulation document will be available for review there. Description of Work: This is a prevailing wage project. Replace one MAU and add pre-filters to a second MAU. UNR Project#: #26DRPR03481 Labor Commissioner #: WA-2026-394 SPWD Project #: Not Required Estimated Cost Range: $165,000 to $265,000 Liquidated Damages: $500 per day Special Considerations: Crane lifting will be required. Required Insurance if Awarded: Commercial General Liability, Business Automobile Liability, Workers' Compensation, Rigger's liability, Installation Floater, and Builder's Risk will be required. Please refer to the TEMPLATE-Owner-Contractor Construction Agreement on the Attachments tab for limits and additional information and in compliance with the requirements set forth here: https://www.unr.edu/bcn-nshe/risk/contracts. Completion of Work: Subject to change by Owner, Work is scheduled to begin on "July 16, 2026" and shall be fully complete by "August 11, 2026."

    Key dates

    1. May 28, 2026Published
    2. June 25, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.