The San Benito County Water District is seeking bids for the Accelerated Drought Response Project, which includes the construction of four Aquifer Storage and Recovery wells, a disinfection building, and approximately 23,000 feet of pipeline. The project is set to start on June 2, 2025, with a due date for proposals by July 25, 2025.
The Work is located in the City of Hollister and San Benito County. The main project components are: Four (4) Aquifer Storage and Recovery (ASR) wells One disinfection building 12- to 18-inch diameter pipeline with appurtenances (approximately 23,000 linear feet) One flow meter vaul, and one chemical injection vault The project transmission pipeline is within existing public right of way. The well sites, disinfection building, and lateral pipelines (located north and south of Fallon Road) are on private property and utility easements have been purchased by the Owner (San Benito County Water District). --- QUESTIONS AND ANSWERS --- Q: What is the engineer's estimate for this project? A: No answer provided yet.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.