    Addendum 4 (Overhead Garage Door Replacement StarTran

    Issued by Lincoln County
    countyRFPLincoln CountySol. 17508
    Closed
    STATUS
    Closed
    due Mar 13, 2026
    PUBLISHED
    Feb 6, 2026
    Posting date
    JURISDICTION
    Lincoln County
    county
    NAICS CODE
    238190
    AI-classified industry

    AI Summary

    Lincoln County, Missouri seeks bids for overhead garage door replacement at StarTran facilities. The project includes door installation, electrical provisions, and related construction services. Bids due by March 13, 2026.

    Opportunity details

    Solicitation No.
    17508
    Type / RFx
    RFP
    Status
    Issued
    Level
    county
    Published Date
    February 6, 2026
    Due Date
    March 13, 2026
    NAICS Code
    238190AI guide
    Jurisdiction
    Lincoln County
    Agency
    Lincoln County

    Description

    --- Q&A --- Q1: And, are we re-using the pneumatic treadle hoses on the exit side? A1: These are original and should be replaced. Submitted: 3/3/2026 10:59:44 AM (CT) Q2: The specifications state that locks and interlocks and traffic lights should be included in the base bid. However at the walk throughs, it was stated that they should be bid as an alternate. Please confirm which is correct. A2: I have spoken to Tyler on this and we need to make sure the operator has provisions to accept our radar units and pressure devices in other words they need to have the driver boards installed, we can use our existing traffic lights or install new ones. Submitted: 3/3/2026 10:59:12 AM (CT) Q3: On page 6, Section D of the door specifications, regarding the windows, it states there are 2 vertical rows – 2-4 windows, which is inconsistent with what was seen during the pre-bid walk throughs. Please clarify what the specification should be. A3: StarTran is Okay with one set of windows total of 4 or 5 whatever we have now on one panel centered on the panel not the floor keeping this factory installed. Submitted: 3/3/2026 10:58:41 AM (CT) Q4: What information is required from the sub contractor/electrician? Do they need COI or is primary sufficient? Do they need references and resume also? A4: It is the Prime contractor’s responsibility to ensure all subcontractors have insurance to meet the minimum requirements of the contract. It does not have to be submitted with the bid. References and resume for the subcontractor are not required. Submitted: 2/27/2026 08:39:21 AM (CT) Q5: Is there specific wording for the Bid Bond you need? Did not see example in attachments. A5: Bond requirements are listed in the document named “All Required Federal Clauses”. Submitted: 2/27/2026 08:38:00 AM (CT)

    Key dates

    1. February 6, 2026Published
    2. March 13, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.