Active SLED Opportunity · FLORIDA · GAINESVILLE REGIONAL UTILITIES
AI Summary
GRU seeks suppliers for a five-year contract to provide wire and cable, aiming to improve supply chain efficiency and reduce costs. The RFP includes detailed evaluation criteria such as price, price adjustment methods, lead time, and references. The contract supports multiple utility services in Gainesville, Florida.
GRU is looking for a supplier(s) to enter into a five year contract to furnish one or more of the groups of wire and cable listed in this RFP. The objective of this contract is to generate efficiencies in the supply chain while reducing total cost of ownership through cooperative efforts GRU and successful supplier(s) and their respective manufacturers.
Gainesville Regional Utilities, known as GRU, is a multi-service utility owned by the City of Gainesville. We are the 5th largest municipal electric utility in Florida.
Our combined services make us the most comprehensive utility service provider in the state. We serve approximately 100,000 retail and wholesale customers in Gainesville and surrounding areas, offering:
| Event | Date | Location |
|---|---|---|
| Evaluation Meeting (Public) | 2026-06-30T04:00:00.000Z | Microsoft Teams meeting Join: https://teams.microsoft.com/meet/25051870830225?p=IsBN8hlllI7JvxDluT Meeting ID: 250 518 708 302 25 Passcode: i7Yv7AK3 ________________________________________ Need help? | System reference Dial in by phone +1 352-554-8008,,601801909# United States, Gainesville Find a local number Phone conference ID: 601 801 909# |
Detailed explanation of proposed Price Adjustment Method:
Pricing may be adjusted periodically (monthly preferred, but quarterly considered).
FOR PURPOSES OF BID EVALUATION: All vendors shall use the following aluminum and copper base metal prices.
Provide a copy/sample of customer price escalation notification. Explain why this method is in the best interest of all Parties.
Lead Time in weeks from receipt of purchase order to delivery to GRU warehouse.
Discussion 1: planning, ordering, tracking, delivery, on-time ratio, required lead times (in calendar days)
Discussion 2: quality control program, recycling of reels, steel reel return and deposit methodology, scrap recovery, vendor stocking program.
Discussion 3: payment method, website tracking, summary billing, and warranty
Discussion 4: local support, back-up and emergency plans, storm support, and experience with Florida Utilities
What sets the your company apart from other competitors. Include suggestions for cost reduction programs or added value initiatives (i.e. cut-to-order, rapid cycle time) that would contribute to the long-term goals of Participating Utilities. Include any applicable costs for additional services proposed (if any)
A list of references from five US companies is required. References should be similar in scope and size, preferably for a utility. All references shall be recent (within the past five years) and be verifiable. References given should be able to attest to the firm’s knowledge, quality of work, timeliness, flexibility, and ability to cultivate a strategic alliance. Each reference should include current information for the following: Client’s name, address, contact person, contact Email and phone #, contract dates (begin and end), and a brief contract summary.
Background, experience, business philosophy and qualifications of the bidder. Why is your company interested in this solicitation?
Include: A resume for the staff that will oversee the various aspects of this contract including their responsibilities and qualifications; years of experience in this industry; an executive summary of current/anticipated strategic alliance based contracts.
If bidder is a distributor, elaborate on the relationship your firm has with the manufacturer and the added value provided to Participating Utilities.
If bidder is a manufacturer, elaborate on your customer service capabilities and why you elect not to use distributors if awarded this contract.
"I hereby propose to provide the goods/services requested in this Solicitation. I agree to hold pricing for at least 60 calendar days from the Solicitation due date. I agree that GRU’s terms and conditions herein take precedence over any conflicting terms and conditions submitted for GRU’s consideration, and agree to abide by all conditions of this Solicitation.
I certify that all information contained in this Response is truthful to the best of my knowledge and belief. I further certify that I am duly authorized to execute and submit this Response on behalf of the organization as its agent and that the organization is ready, willing and able to perform if awarded.
I further certify that this Response is made without prior understanding, agreement, connection, discussion, or collusion with any other person, company or corporation submitting an offer for the same product or service; and the undersigned executed this Respondent’s Certification with full knowledge and understanding of the matters therein contained."
Please download the below documents, complete, and upload.
Please download the below documents, complete, and upload.
"Preference may be given to a business that certifies that it has implemented a drug-free workplace program. Pursuant to Section 287.087, Florida Statutes, whenever two or more competitive solicitations that are equal with respect to price, quality, and service are received by the State or by any political subdivision for the procurement of commodities or contractual services, a response received from a business that certifies that it has implemented a drug-free workplace program shall be given preference in the award process. Established procedures for processing tie responses will be followed if none of the tied providers has a drug free workplace program. In order to have a drug-free workplace program, a business shall:
As the person authorized to sign the statement, I certify that this firm complies fully with the above requirements."
Pursuant to section 787.06(14), Fla. Stat., when this contract is executed, renewed, or extended the Contractor and any subcontractors must provide the City with an affidavit, signed by an officer or a representative of the Contractor and any subcontractors under penalty of perjury, attesting that the Contractor and subcontractor does not use coercion of labor or services as those terms are defined in this section.
Please download the below documents, complete, and upload.
Please download the below documents, complete, and upload.
Recipients must maintain certifications or equivalent documentation for proof of compliance that those articles, materials, and supplies that are consumed in, incorporated into, affixed to, or otherwise used in the infrastructure project, not covered by a waiver or exemption, are produced in the United States. The certification or proof of compliance must be provided by the suppliers or manufacturers of the iron, steel, manufactured products and construction materials and flow up from all subawardees, contractors and vendors to the recipient. Recipients must keep these certifications with the award/project files and be able to produce them upon request from DOE, auditors or Office of Inspector General.
Provide the Unique Entity ID number and upload the Active Status Registration for your organization. SAM.gov/home
By checking "Yes", bidder understands the following:
If awarded, a Performance Bond and Payment Bond are required. Contractor shall provide such bonds, using the forms attached, for 100% of the price of the awarded contract as security for the full and complete performance of the Contract and for the payment of all persons performing labor, furnishing materials or furnishing equipment in connection with the Contract.
The surety or sureties shall be a company or companies satisfactory to GRU. In accordance with the Florida Statutes, a person entering into a contract with GRU for the construction of a public building or repairs to a public building or a public work is required, prior to commencing work, to execute and record in the public records of Alachua County, a payment and performance bond with a surety insurer authorized to do business in the state as surety.
Experience Modification Rate (EMR) Documentation for the most recent three (3) full years provided on letterhead from current insurance provider.
Please download the below documents, complete, and upload.
List all subcontractors that will be used for the Work along with the tasks they will provide. If the subcontractor is a small and minority-owned business, women’s business enterprise, or labor surplus firm, check the boxes that apply. The selected prime Contractor will be asked to provide the actual subcontractor spend amount at a later date. Subcontractors are not permitted to work at GRU if listed on the State of Florida Suspended Vendor List or the Federal Suspensions and Debarments.
Please download the below documents, complete, and upload.
Any deviation from this Solicitation must be provided and explained in detail with the Response. Deviations must be explained on a separate page labeled “Clarifications and Exceptions” and included with the Response. Each clarification and exception must correspond to the specific referenced section in the Solicitation. Otherwise, the Response will be considered in strict compliance with the Solicitation and the selected Respondent will be held accountable for compliance with the Specifications
Upload your Clarifications and/or Exceptions here.
Please download the below documents for your review.
Detailed explanation of proposed Price Adjustment Method:
Pricing may be adjusted periodically (monthly preferred, but quarterly considered).
FOR PURPOSES OF BID EVALUATION: All vendors shall use the following aluminum and copper base metal prices.
Provide a copy/sample of customer price escalation notification. Explain why this method is in the best interest of all Parties.
Lead Time in weeks from receipt of purchase order to delivery to GRU warehouse.
Discussion 1: planning, ordering, tracking, delivery, on-time ratio, required lead times (in calendar days)
Discussion 2: quality control program, recycling of reels, steel reel return and deposit methodology, scrap recovery, vendor stocking program.
Discussion 3: payment method, website tracking, summary billing, and warranty
Discussion 4: local support, back-up and emergency plans, storm support, and experience with Florida Utilities
What sets the your company apart from other competitors. Include suggestions for cost reduction programs or added value initiatives (i.e. cut-to-order, rapid cycle time) that would contribute to the long-term goals of Participating Utilities. Include any applicable costs for additional services proposed (if any).
A list of references from five US companies is required. References should be similar in scope and size, preferably for a utility. All references shall be recent (within the past five years) and be verifiable. References given should be able to attest to the firm’s knowledge, quality of work, timeliness, flexibility, and ability to cultivate a strategic alliance. Each reference should include current information for the following: Client’s name, address, contact person, contact Email and phone #, contract dates (begin and end), and a brief contract summary.
Background, experience, business philosophy and qualifications of the bidder. Why is your company interested in this solicitation?
Include: A resume for the staff that will oversee the various aspects of this contract including their responsibilities and qualifications; years of experience in this industry; an executive summary of current/anticipated strategic alliance based contracts.
If bidder is a distributor, elaborate on the relationship your firm has with the manufacturer and the added value provided to Participating Utilities.
If bidder is a manufacturer, elaborate on your customer service capabilities and why you elect not to use distributors if awarded this contract.
Will the purchase of goods or services be funded by the State or Federal Government (i.e. Grants, FEMA Reimbursements).
Is this RFP going to be used for FEMA related funding?
Is this a GRIP Grant?
Is this a Construction Project?
Award will be made to the best evaluated Respondent(s) for Response(s)
1. Is this Solicitation for Goods only?
2. Is this Solicitation for a Service, Labor or Labor and Material?
3. Is this Solicitation for Consulting Services?
4. Is this Solicitation for Software Services?
Is the pre-bid meeting mandatory?
Enter number of minutes below:
"Representatives arriving to the Pre-Bid/Proposal Meeting more than __ minutes late will not be allowed to participate in the meeting."
Is the pre-bid meeting non-mandatory?
Enter number of minutes below:
"Representatives arriving to the Pre-Bid/Proposal Meeting more than __ minutes late will not be allowed to participate in the meeting."
Will there be a shortlist of bidders to be invited to present to the evaluation team?
Is this solicitation for engineering services, or for consulting services other than engineering services?
Is this solicitation for engineering, architectural or consulting services?
Does vendor need to provide EMR?
Would you like to have bidders respond to an electronic pricing table through OpenGov?
Some examples of when to say "yes":
List criteria being evaluated (i.e. price, delivery and warranty).
List 3-5 names of member who will be on the evaluation comittee.
Is a multi-year contract required?
Enter the begin date here (i.e. October 1, 2024)
Enter the termination date (i.e. September 30, 2024)
How many renewal will this contract have? (i.e. 'Three (3)'; 'Two (2)'; 'Three (3) One Year', etc.)
Will this solicitation require a bid bond?
Will a Performance Bond be required for this solicitation?
Is a Surety Bond required with bid submittals?
Enter the dollar amount of the surety bond
Is a Commercial Blanket Bond required with bid submittal?
Is a Fidelity Bond required?
Will Liquidated damages be required?
Enter dollar amount of Liquidated Damages.
For example: "Liquidated damages shall be assessed in the amount of $[XXX,XXX]. [Define when liquidated damages will apply]."
In what capacity will vendor be doing business?
Do work hours apply to this solicitation?
Enter the days of the week and the hours of the day that work can be done. (i.e. Monday-Friday, 8am-5pm)
Do you have a required delivery date?
Provide required delivery date
Do you have a specific delivery location?
Enter full delivery address here.
Is there a specific location where work will be done?
Please provide address for the job site.
Does the Florida Trench Safety Act apply to this solicitation?
The State of Florida incorporates the Occupational Safety and Health Administration’s (OSHA) excavation safety standards, 29 C.F.R. 1926.650 Subpart P, as its standard (Sections 553.60-64, F.S.). The Contractor/Respondent shall list separately in their Proposal the cost of compliance with these standards on a lineal footage basis and the method of compliance. The bidder shall determine if special shoring requirements are needed. Special shoring shall be identified and priced on a square footage basis in the Proposal. The Successful Bidder is fully responsible for the design of the trench safety system and the compliance with the applicable standards for the project.
Will a best and final offer apply to this solicitiation?
Is the vendor a:
(Your answer will automatically populate throughout the contract document)
Is the vendor a:
(Your answer will automatically populate throughout the contract document)
Choose whether this is an "Agreement" (such as a PSA or Software) or a "Contract". The document will be consistent with this answer.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.