Design-Build project for demolition, hazardous material mitigation, and construction of a new Asphalt Plant No. 1 – Phase 2 RAP facility in Los Angeles, CA, including site improvements, security, and truck scale installation.
This Design-Build project consists of demolition, hazardous material mitigation, design, and construction of a new Asphalt Plant No. 1 – Phase 2 Recycled Asphalt Pavement (RAP) plant facility on a 40,631.40 square feet site area at 25th Street and Harriet Street to provide additional processing, storage, and operational space increasing the overall RAP production capabilities. The new facility will entail a 1-story 22,780 square feet enclosed solar powered canopy building with rooftop fall prevention system, office, restrooms, utility connections, concrete bins, security features such as fence, gate, camera, and lighting and other site improvements including the street improvement with AASHTO HS-20 truck loading-rated foundation, driveways, pavement, truck route, sidewalks, parking, trash enclosure, an operation area, street lighting, driveways, landscaping with irrigation system, operation and maintenance services, and procurement, delivery, assembly, and installation of truck scale. ▬ ● See bid package for full scope & details ●● Bid package only on RAMPLA- download Part 1 to be a planholder ● For planholders lists & bid results visit: http://engineering.lacity.gov/contractors/
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.