Collier County seeks licensed contractors for awning replacement at Vanderbilt Beach Parking Garage damaged by Hurricane Ian. The project involves replacing canvas awnings on west and south elevations, meeting hurricane wind load requirements. Insurance, licensing, and compliance with county terms are required. Due date: April 14, 2026.
To replace the awning at the west and south elevation of the parking garage at Vanderbilt Beach.
Statutory Limits of Florida Statutes, Chapter 440 and all Federal Government Statutory Limits and Requirements
Evidence of Workers’ Compensation coverage or a Certificate of Exemption issued by the State of Florida is required. Entities that are formed as Sole Proprietorships shall not be required to provide a proof of exemption. An application for exemption can be obtained online at https://apps.fldfs.com/bocexempt/
To replace the awning at the west and south elevation of the parking garage at Vanderbilt Beach.
$500,000 single limit per occurrence
Bodily Injury and Property Damage
$1,000,000 single limit per occurrence, $2,000,000 aggregate for Bodily Injury Liability and Property Damage Liability. This shall include Premises and Operations; Independent Contractors; Products and Completed Operations and Contractual Liability.
To the maximum extent permitted by Florida law, the Contractor/Vendor shall defend, indemnify and hold harmless Collier County, its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys’ fees and paralegals’ fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Contractor/ Vendor or anyone employed or utilized by the Contractor/Vendor in the performance of this Agreement.
$500,000 Each Occurrence; Bodily Injury & Property Damage, Owned/Non-owned/Hired; Automobile Included
$TBD Per Occurrence
United States Longshoreman's and Harborworker's Act coverage shall be maintained where applicable to the completion of the work.
$TBD Per Occurrence
Maritime Coverage (Jones Act) shall be maintained where applicable to the completion of the work.
$TBD Per Occurrence
Aircraft Liability coverage shall be carried in limits of not less than $5,000,000 each occurrence if applicable to the completion of the Services under this Agreement.
$TBD Per Occurrence
$TBD Per Occurrence
$TBD Per claim & in the aggregate
$TBD Per Occurrence
$TBD Per Occurrence
$TBD Per Occurrence
$TBD Per Occurrence
Collier County Purchase Order Terms and Conditions have been acknowledged and accepted.
http://dos.myflorida.com/sunbiz/ should be attached with your submittal.
Vendor MUST be enrolled in the E-Verify - https://www.e-verify.gov/ at the time of submission of the bid. E-Verify Memorandum of Understanding or Company Profile page should be attached with your submittal.
$ __________ Per Occurrence
$ __________ Per Occurrence
$ __________ Per Occurrence
$ __________ Per Occurrence
$ __________ Per Occurrence
$ ___________ Per claim & in the aggregate
$__________ Per Occurrence
$__________ Per Occurrence
$__________ Per Occurrence
$__________ Per Occurrence
$ __________ single limit per occurrence
$_________ aggregate
$________ single limit per occurrence
$________ Each Occurrence
If this is a grant-funded quote, please make sure that the approval process is updated to accommodate the grants department's approval.
You can invite the grant department to upload relevant attachments by clicking on "Invite" and then adding the relevant user with edit access.
Q (Current Awning Installed): Can you please provide the awning company that installed the previous awning and date of install? Awning compliance with FL Building Code Wind Load Requirements may be subject to existing frame.
A: The company that installed the awning over 15 years ago is no longer in business.
Q (Material): Is the canvas to be vinyl?
A: Yes, the canvas is to be vinyl
Q (Bonding - Bid & P&P): Will this small job require 1) Bid Bond 2) P & P bond 3) or is there a floor contract value before a bond is needed?
A: If the job is under $200,000, then no bond is needed
Q (Frames on side of building): Have the frames been inspected by an engineer to determine structural integrity in product and attachment? If a frame is bad and needs attention - discovery at construction - how will you handle the extended engineering, product, and labor costs?
A: When you submit your costs for the framing, include a cost if more work needs to be done (part of the lump sum for that line item), and then if you do not use it all for the job, then you just bill less than what you put for that line item.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.