Active SLED Opportunity · FLORIDA · CITY OF HOMESTEAD
AI Summary
City of Homestead seeks contractors to furnish and install precast concrete barrier walls and an automated vehicle gate at the energized Lucy 138kV Switching Station. The project requires specialized experience in utility-scale concrete construction, safety compliance, and adherence to Florida building codes. Mandatory pre-bid conference on June 30, 2026. Bids due July 24, 2026.
Homestead Public Services (HPS Energy) seeks qualified and experienced contractors to furnish and install a prefabricated concrete perimeter barrier wall at the Lucy 138kV Switching Station. Lucy is a critical asset because it serves as the primary tie-in point for the Florida Power & Light (FPL) feeder. Protecting the infrastructure at the Lucy Station is critical for HPS Energy system reliability.
The goal of this project is to install high-strength concrete barriers to harden the station against physical threats and environmental damage. Because Lucy operates in an energized 138 kV environment, the selected contractor must have documented experience furnishing and installing similar barrier walls at electric utility stations. Stations that are energized during construction. Interested vendors must have a "safety-first" mindset and experience with utility-scale structural work are the main things we are looking for.
HPS Energy seeks a partner who can do this work in accordance with the specifications and building code, and on schedule. Vendors with documented experience in heavy concrete work in industrial or utility settings are encouraged to submit a bid response.
The City of Homestead is an Equal Opportunity Employer and encourages participation from MBE/WBE/DBE businesses.
Proposers should be familiar with all statutory and regulatory requirements, including any waivers and alternative requirements may be issued in the Federal Register. Proposer shall comply with all applicable requirements of Federal provisions, which shall include, but not be limited to those items set forth below:
Contract Provisions shall be made part of the agreement awarded through the solicitation.
| Contract Remedies | Clean Air Act & the Federal Water Pollution Control Act |
| Termination for Cause of Convenience | Debarment and Suspension |
| Equal Employment Opportunity | Byrd Anti-Lobbying Amendment |
| Copeland Anti-Kickback Act | Procurement of Recovered Materials |
| Contract Work Hours and Safety Standards Act | Prohibition on Contracting for Covered Telecommunications Equipment or Services |
| Rights to Inventions Made Under a Contract or Agreement | Domestic Preferences for Procurements |
| Access to Records | Affirmative Socioeconomic Steps |
| Changes & Modifications | Copyright |
| Use of DHS Seal, Logo, and Flags | 2 CFR Part 200.318 through 200.327 |
| Compliance with Federal Law, Regulations, and Executive Orders | |
| No Obligation by Federal Government | |
| Program Fraud and False or Fraudulent Statements or Related Acts |
2 CFR Part 200—
Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards as required by the provisions of 24 CFR Part 570.503 (b) (4) and 24 CFR Part 570.502.
The procurement standards must be met in accordance with the following categories:
These are mandatory insurance requirements, please be sure to fulfill each requirement listed below. All policies, endorsements, certificates and/or binders shall be subject to approval by the City’s Risk Management as to form and content. These requirements are subject to amendment or waiver only if so approved in writing by a duly authorized representative of the City. A lapse in any required insurance coverage during this Contract shall be considered a material breach. Further it is understood and agreed by Bidder that nothing in this provision shall waive or otherwise limit the right of the City to modify INSURANCE REQUIREMENTS to meet the demands of special or unique circumstances. Accordingly, those rights are expressly reserved by the City.
The insurance obligations under this Contract shall be: all the insurance coverage and/or limits carried by or available to the Bidder or the minimum insurance requirements and/or limits shown in this Contract, whichever is greater. Any insurance proceeds in excess of or broader than the minimum required coverage and/or minimum required limits, which are applicable to a given loss, shall be available to the City. No representation is made that the minimum insurance requirements of this Contract are sufficient to cover obligations of the Bidder under this Contract.
If evidence of insurance provided by Bidder does not comply with the requirements of this section, the City reserves the right but not the obligation to deem your Bid non-responsive.
Throughout the term of this agreement and for all applicable statutes of limitation periods, Bidder agrees to have and maintain in full force and effect the insurance policies set forth in this article. All policies must contain an endorsement requiring minimum thirty (30) days written notice from the insurance company to the City prior to cancellation or any change in coverage, scope or amount of any such policy or ten day notice for non-payment of premium.
BIDDER EXPRESSLY AFFIRMS THAT IT HAS HAD THE OPPORTUNITY TO RECOVER THE COSTS OF THE INSURANCE REQUIRED IN ITS CONTRACT PRICE.
Project Scope of Work: Lucy 138kV Station - Barrier Wall
1. Project Overview & Purpose
The Contractor shall provide all engineering, labor, materials, and equipment necessary for the design, fabrication, and installation of a precast concrete structural barrier wall system and integrated automated vehicle slide gate at the Lucy 138kV Switching Station. The primary objective is to harden the facility’s critical assets, which serve as the radial feed for approximately 100% of the City’s load.
2. Phase I: Engineering & Design
Site Survey: Contractor shall perform a detailed site survey to verify existing grades, underground utilities, and clearances from energized 138kV equipment. THE STATION WILL REMAIN ENERGIZED DURING CONSTRUCTION.
Structural Design: Contractor shall provide signed and sealed engineering drawings by a Professional Engineer (PE) licensed in the State of Florida.
Wind Rating: The wall and foundations must be designed to meet the High-Velocity Hurricane Zone (HVHZ) requirements of the Florida Building Code for a Risk Category IV structure, utilizing a minimum ultimate design wind speed of 175 MPH (or 180 MPH per local utility mandates), Exposure Category C.
Columns/Footings/Foundation Design:
3. Phase II: Precast Manufacturing
Quality Control: All concrete panels and posts must be manufactured in an FDOT-certified precast plant.
Specifications: Minimum Concrete Strength: 5,000 PSI at 28 days.
Finish: Standard industrial smooth finish (or specify if you want a specific texture/color).
Reinforcement: All rebar must be epoxy-coated or galvanized to prevent "spalling" in the Florida humidity.
Delivery: Contractor is responsible for the transport of all precast units to the Lucy Station. Units must be inspected upon arrival for cracks or damage.
4. Phase III: Installation & Site Requirements
Contractor is responsible for identifying a power source and installing any necessary electrical service to the gate in accordance with the National Electrical Code (NEC).
Safety & Clearances: Lucy is an energized 138,000-volt environment. The Contractor must maintain OSHA-mandated Minimum Approach Distances (MAD) at all times.
Excavation: Contractor shall be responsible for "Soft Digging" (vacuum excavation) within 5 feet of any known underground high-voltage or control cables.
Grounding: The wall system must be integrated into the existing station ground grid. Contractor shall provide and install a minimum #4/0 AWG bare stranded copper grounding jumper from each precast column (and internal panel reinforcement, if applicable) to the existing substation ground grid. All below-grade connections to the grid must be made via exothermic welds (e.g., Cadweld) or utility-grade compression fittings. Above-grade connections to the wall must use NEMA 2-hole copper lugs.
Restoration: Upon completion, the contractor shall restore the site to its original condition, including replacing any displaced substation rock/gravel.
5. Project Schedule & Milestones
Bidders must provide a preliminary project schedule with their bid submission. The schedule will utilize a relative milestone format (i.e., +days or +_weeks elapsed from the issuance of the formal Notice to Proceed). The schedule shall demonstrate a logical, sequential workflow and establish a binding commitment to project duration.
6. Minimum Contractor Qualifications
Must have completed at least three (3) industrial concrete projects in energized utility environments (13kV or higher).
Must provide a dedicated Safety Officer for the duration of the on-site installation.
Must be registered in the EPL-B.U.I.L.D portal and the OpenGov procurement system.
7. Technical SOW Supplement (Contingency Items)
Baseline Expectation: The Contractor's base price per Linear Foot (Bid Item 4) must include standard excavation and drilling through common soils, sands, clays, and loose, unbonded material.
Rock Definition: Hard Ground Drilling shall only be triggered when drilling encounters solid, continuous rock layers (such as dense oolitic limestone typical of South Florida) that cannot be penetrated by a standard, heavy-duty earth auger and require specialized rock augers, core barrels, or a dedicated drill rig.
Measurement: Volume will be calculated mathematically based on the diameter of the engineered pier hole and the actual vertical depth of the verified rock stratum drilled. No payment for Item 008 will be authorized without visual verification and written sign-off by the City's inspector prior to concrete placement.
Baseline Expectation: The Contractor is responsible for managing normal surface runoff and minor precipitation water within their standard installation scope.
Dewatering Definition: The contingency item shall apply only if the local groundwater table breaches the excavated pier holes or continuous trenches, creating unstable conditions that prevent proper structural placement of concrete/reinforcement.
Operational Requirements: The Contractor shall provide all necessary pumps, hoses, and sediment filtration devices. All discharged water must be handled in strict accordance with the City of Homestead and South Florida Water Management District (SFWMD) environmental regulations.
Measurement: Paid by the actual hour(s) of active pumping operations required to keep the immediate work zone dry during structural installation.
The City’s Procurement and Contract Services Department is the official source to obtain information relating to City of Homestead procurements. It is incumbent on the Respondent to obtain current response/submittal and award information prior to and after the scheduled opening date of a solicitation. Information is updated as it becomes available. An award, or recommendation of award, may be made at any time after the scheduled opening date of a solicitation. You may obtain award and other solicitation information in a variety of ways, such as:
Solicitation documents are available for download from the City's e-Procurement Portal ("Portal"): https://procurement.opengov.com/portal/cityofhomestead
You may also contact the Procurement and Contract Services Department at (305) 224-4620 or visit us during normal business hours, to obtain award information and other documents at:
City of Homestead
Procurement and Contract Services Department
450 SE 6th Avenue
Homestead, FL 33030
Please remember, email notification is provided as a courtesy to our Respondents, but it is the Respondent's responsibility to check with the City of Homestead’s Portal at: https://procurement.opengov.com/portal/cityofhomestead for current solicitations and other procurement information.
We appreciate your interest in doing business with the City of Homestead.
Bid tabulations are posted on the City website at: https://procurement.opengov.com/portal/cityofhomestead.
If not submitting a bid, respond by returning an original copy of Bid Form, marking it “No Bid,” and explain the reason. Repeated failure to bid without sufficient justification shall be cause for removal of a supplier’s name from the bid mailing list. NOTE: A Bidder, to qualify as a respondent, must submit a “no bid” and same must be received no later than the stated bid opening date and hour.
Any exceptions to the requirements of this solicitation shall be disclosed in the designated Exceptions Section of the OpenGov submission and shall reference the applicable section number. The City reserves the right to determine the acceptability of any exception. Material exceptions to the Terms and Conditions, Scope of Work, Specifications, or other solicitation requirements may result in the proposal being deemed non-responsive and removed from further consideration.
Prior to submitting the bid, the bidder is required to visit the site of the proposed work and to become familiar with any conditions, which may in any manner, affect the work to be done or affect the equipment, materials and labor required. The bidder is also required to examine carefully the specifications and be thoroughly informed regarding any and all conditions and requirements that may in any manner affect the work to be performed under the contract. No additional allowances will be made because of lack of knowledge of these conditions.
The Pre-Bid Meeting will be held at the project site. The meeting location will serve as the designated site inspection location, where attendees will have the opportunity to inspect existing site conditions immediately following the meeting. Attendance at the site inspection is subject to the requirements specified in this solicitation.
Only Bidders whose attendance is recorded by the City at the mandatory Pre-Bid Meeting and Site Inspection will be eligible to submit a bid. Bids submitted by firms that do not attend the mandatory meeting and site inspection will be deemed non-responsive and will not be considered for award.
Any Bidder attending this site inspection is required to complete the Site Inspection Indemnity Form (see attachment) or bring a copy of their certificate of insurance evidencing statutory worker’s compensation coverage to the pre-bid meeting as these forms will be reviewed prior to anyone going to the Site Inspection. Bidders who do not supply this information will not be permitted to attend the site inspection.
Invoices, unless otherwise indicated, must show the purchase order number and respective Bid number and shall be submitted to the City of Homestead (100 Civic Court Homestead, FL 33030) with the requesting Department labeled on the mailing envelope.
The City of Homestead is exempt from all Federal Excise and State taxes. The applicable tax exemption number is shown on the Purchase Order.
Lucy Switching Station
16191 SW 328th Street Homestead, FL 33030
(NE Corner of SW 162nd Ave and SW 328th St)
MOBILIZATION TIME: Bidders shall specify the estimated response and mobilization time required to commence work after receipt of a Work Order or Notice to Proceed. The stated mobilization time shall be expressed in calendar days and shall represent the Bidder’s firm commitment. The City may rely on the stated mobilization time in evaluating bids and scheduling work. Failure to meet the stated mobilization time during contract performance may be considered in evaluating the Contractor’s performance.
If Bidder offers makes of equipment or brands of supplies other than those specified in the following, he must so indicate on his bid. Specific article(s) of equipment/supplies shall conform in quality, design and construction with all published claims of the manufacturer.
Brand Names: Catalog numbers, manufacturers’ and brand names, when listed, are informational guides as to a standard of acceptable product quality level only and should not be construed as an endorsement or a product limitation of recognized and legitimate manufacturers. Bidders shall formally substantiate and verify that product(s) offered conform with or exceed quality as listed in the specifications.
Bidder shall indicate on the Bid Form the manufacturer’s name and number if bidding other than the specified brands, and shall indicate ANY deviation from the specifications as listed. Other than specified items offered requires complete descriptive technical literature marked to indicate detail(s) conformance with specifications and MUST BE INCLUDED WITH THE BID. NO BIDS WILL BE CONSIDERED WITHOUT THIS DATA.
Lacking any written indication of intent to quote an alternate brand or model number, the bid will be considered as a bid in complete compliance with the specifications as listed on the attached form.
Manufacturer’s name, brand name and model number may have been used in these specifications for the purpose of establishing minimum requirement of level of quality, standards of performance and design required and is no way intended to prohibit the bidding of other manufacturer’s items of equal material, unless otherwise indicated. Equal (substitution) may be bid, provided product so bid is found to be equal in quality, standards of performance, design, etc. to item specified, unless otherwise indicated. Where equal is proposed, bid must be accompanied by complete factory information sheets (specifications, brochures, etc.) and test results of unit bid as equal.
All bids must be accompanied by a Bid Bond in the amount of 10% of the total bid submitted, to be in the form of a Cashier’s Check (which shall be tantamount to a Bid Bond) made payable to the City of Homestead; a bond written by a surety company authorized to do business in the State of Florida and shall comply with State Statute 287.0935. The Bid Bond must be fully executed, signed by both the Bidder and the surety, and must be uploaded in the designated submittal section at the time of bid submission. The bond of all unsuccessful bidders will be returned after bid award. The Bidder shall not withdraw their Bid after Bid Opening for the period stipulated as the Bid guaranty period. Bidders will give these assurances that all bids offered will be held open and are not revocable for lack of consideration during the time stipulated herein.
2.5.1 Attorneys-in-fact, who sign the Bid Bond, Performance Bond and Payment Bond, must file with such Bonds, certified copies of their current power of attorney to sign such Bonds. All Bonds must be countersigned by an agent of the Surety licensed in the state of Florida, with a copy of the agent's current identification card, as issued by the State of Florida Insurance Commissioner, attached thereto.
If the contract award amount exceeds $200,000.00, a Performance Bond and Labor and Material Payment Bond will be required and will be issued within ten (10) days upon issuance of a notice to proceed in the form(s) required herein, and written by a surety licensed in Florida and acceptable to the City. Bidder shall provide evidence of sufficient bonding capacity with its Bid in the form required herein. Failure to provide such evidence may result in rejection of the Bid.
A Performance Bond/Payment Bond that does not conform to the City’s form may not be accepted. The Surety Company shall be acceptable to the City and must be authorized to do business in the State of Florida. The Performance and Payment bonds from the bidder shall name the City as an obligee. BIDDERS THAT CANNOT PROVIDE EVIDENCE OF THE CAPACITY FOR BONDING IN THE MINIMUM AMOUNT OF THE BID PRICE AT THE TIME OF BID SUBMISSION MAY NOT BE CONSIDERED RESPONSIVE OR OTHERWISE QUALIFIED TO PERFORM THE PROJECT PURSUANT TO THIS BID. SUFFICIENT EVIDENCE OF SUCH MUST BE PROVIDED BY THE BIDDER PURSUANT TO THIS BID AT THE TIME OF BID SUBMISSION. City reserves the right in its sole discretion to determine the sufficiency of such evidence of Bidder’s bonding capacity.
2.6.1 The Performance Bond shall be conditioned so that the contractor performs the Contract in the time and manner prescribed in the Contract, including the obligation to cure any and all defects in the Work, including latent defects, with in the time period allowed by section 95.11(3)(c), Florida Statutes. The Payment Bond shall be conditioned so that the contractor promptly make payments to all persons who supply the contractor with labor, materials, supplies, and equipment used directly or indirectly by the contractor in the prosecution of the work provided for in the Contract. The bonds shall provide that the surety be obligated to an amount not exceeding the penal sum of each bond, together with interest at the maximum rate allowed by law, and shall further indemnify and save harmless the City to the extent of any and all payments in connection with the carrying out of said Contract which the City may be required to make under the law.
2.6.2 Pursuant to the requirements of Section 255.05. Florida Statutes, it shall be the duty of the contractor to record the aforesaid Payment Bond in the public records of Miami-Dade County, with the contractor to pay all recording costs, and to deliver a certified copy thereof to the City prior to the commencement of any construction. Bidder acknowledges that notwithstanding the provisions of the Bid Documents, the Contract, or any “prompt payment” laws to the contrary, City shall not be obligated to make any payment to the contractor unless and until contractor complies this this section.
Bidders are expected to examine the specifications, delivery schedules, bid prices and extensions and all instructions pertaining to supplies and services. Failure to do so will be at the Bidder’s risk.
Each Bid should be accompanied by a list of references (minimum of six [6]) for clients or government organizations for which the Bidder is currently furnishing or has previously furnished similar products or services. The reference list should include, the name of the company, a contact person, telephone number, email address, Purchase Order or Contract Number. The City further reserves the right to verify and confirm any information submitted in this process. Such verification may include, but is not limited to, contacting current or former clients, reviewing relevant documentation, conducting site visits, and performing other independent confirmation of data.
It is understood and agreed that any item offered or shipped as a result of this bid shall be latest new and current model offered (most current production model at the time of this bid). All containers shall be suitable for storage or shipment, and all prices shall include standard commercial packaging.
The successful bidder will be required to warranty/guarantee all work performed. The warranty/guarantee that the vendor is offering shall be described in detail and submitted with their bid.
Only manufacturer’s authorized parts or approved equal shall be used in the equipment repairs. All parts used must be new. Whenever parts are to be replaced, the Contractor shall ensure that all warranty conditions are maintained. Parts and labor shall be warranted for a minimum period of one (1) year from date of installation, and the contractor shall maintain a record of all warranted parts.
If Contractor finds a piece of equipment that appears to be under manufacture warranty and recognizes that it may not be maintenance by a Third-Party. It is the Contractors responsibility to list it and bring it to the attention of the Project Manager.
All materials used for the manufacture or construction of any supplies, materials or equipment covered by this bid shall be new. The items bid must be new, the latest model, of the best quality, and highest grade workmanship.
RESERVED
Bidders shall submit, with their Bid, a Company Profile and supporting documentation demonstrating their qualifications to perform the work.
A. The information provided will be used by the City to determine the responsibility of the Bidder. The Company Profile should include, at a minimum:
1. Length of time in business and business location • Relevant experience, certifications, and technical qualifications
2. Key personnel and project team experience • Organizational capacity and available resources
3. Financial capability (may be requested separately or post-bid)
4. Record of past performance, including similar projects completed within the last five (5) years
5. Disclosure of litigation or claims, failure to provide complete qualification information may result in a determination of non-responsibility, but shall not automatically render a Bid non-responsive. The City reserves the right to request additional information or clarification.
2.9.1 Licensing & Registration:
A. At the time of Bid submission, the Bidder must hold all required licenses necessary to perform the Work in accordance with Florida Statutes 489.115. Failure to possess the required license at the time of Bid submission shall render the Bid non-responsive.
1. Contractors holding a local Certificate of Competency must also be registered with the State of Florida pursuant to Florida Statutes 489.117.
2. Proof of required State registration shall be provided prior to contract award or execution, and failure to obtain such registration within the time specified by the City may result in a determination of non-responsibility or contract award withdrawal.
B. The successful Bidder, including the General Contractor and designated Qualifier, shall be required to register with the City of Homestead’s Development Services, Planning and Zoning Department prior to commencing any work under the Contract. Failure to complete such registration within the time specified by the City may result in a determination of non-responsibility, delay of Notice to Proceed, or withdrawal of award.
2.9.2 Post-Bid Responsibility Review
A. The City will evaluate the apparent low bidder for responsibility in accordance with the Procurement Policy, including:
2.9.3 Joint Ventures
A. If the Bidder is a joint venture (“JV”), the following shall apply:
If the Bidder is awarded a contract under this bid solicitation, the prices quoted by the Bidder on the Bid Form shall remain fixed and firm during the term of this contract; provided however, that the Bidder may offer incentive discounts from this fixed price to the City at any time during the contractual term.
All Bidders must submit catalog information on the product(s) and/or unit(s) they propose to furnish if awarded this Contract. Failure to submit such information will result in rejection of your Bid.
All Bids that include substances found on the current Florida Toxic Substance List must be submitted with a Material Data Sheet, in accordance with applicable Florida Statutes
Other forms to be included with your submission include the following: Americans with Disability Nondiscrimination Statement, Business Entity Affidavit/Conflict of Interest, Certification regarding Debarment, Drug-Free Workplace Program Affidavit, Scrutinized Companies, E-Verify, Sworn Statement, Performance Surveys, Social Security Collection, W-9, Affidavit Attesting to Non-Coercive Conduct for Labor or Services, Affidavit regarding Prohibition on Contracting with Entities of Foreign Countries of Concern and all required product information and any other items as indicated in this Section or any part of this Invitation to Bid. Bids may be deemed non-responsive if a form is considered material to the bid and not submitted by the specified due date. Additionally, bids may be rejected for failure to include any other required documentation identified in this section, elsewhere in the Invitation to Bid, or in any issued Addenda.
2.11.1 LICENSING: Bidder(s) shall submit, with their Bid, a copy of their valid occupational/business license and State registration [Florida State Registration can be located and printed at www.Sunbiz.org]. Bidder must also submit certificates of competency, licenses or any other certification necessary to complete the Contract. Bidders must be in good standing and authorized to transact business in the State of Florida. Must not be listed in the System for Award Management (SAM) as an excluded party. In addition, all licenses required for Bidders whose businesses and professions are regulated by the Florida Department of Business and Professional Regulation must be active and current.
2.11.2 ALTERNATE BID DOCUMENTS: Documents prepared by the City must be used for the submission of the Bid response. Alternate bids or bids that deviate from the requirements of this solicitation will not be considered. Bidders shall not insert in their submission any written statement which will have the effect of making any material change or changes in the Scope of Services or in any contract between the parties covering the subject matter thereof.
These specifications describe the various items or classes of work required, enumerating or defining the extent of same necessary, but failure to list any item or classes under scope of the several sections shall not relieve the contractor from furnishing, installing or performing such work where required by any part of these specifications, or necessary to the satisfactory completion of the project.
Bidder should deduct trade discounts and quote firm net prices and give both unit price and extended total, when requested. Prices must be stated in units of quantity specified in the bidding specifications. In case of discrepancy in computing the amount of the bid, the UNIT PRICE quoted will govern. All prices must be F.O.B. / C.I.F. destination, freight prepaid (unless otherwise stated in special conditions). Discounts for prompt payment: Award, if made, will be in accordance with terms and conditions stated herein. Each item must be bid separately and no attempt is to be made to tie any item or items in with any other item or items. Cash or quantity discounts offered will not be a consideration in determination of award of bid(s).
All successful Bidders/respondents on City contracts in which subcontractors may be used shall provide a detailed statement of their policies and procedures for awarding subcontracts which:
2.12.1 Prospective Bidders need to furnish a list at time of Bid of all sub-contractors to be used during the construction of this project. The City of Homestead reserves the right to approve or disapprove any sub-contractor on the basis of the responses to the requirements listed below during the term of this contract. The prime contractor must maintain and furnish a current list (to the City's Project Manager) of the following information for each sub-contractor and notify the City of any changes to this information during the term of this contract:
Failure by the Bidder to whom the Contract has been awarded, to execute and deliver the required documents and/or other applicable forms, and to furnish the Performance and Payment Bonds, and to furnish satisfactory evidence of all insurance coverage within ten (10) calendar days after the award letter is presented to Bidder for execution, may result in the annulment of the award and the forfeiture of the bid guarantee to the City, which forfeiture shall be considered not as a penalty but in liquidation of damages sustained by the City. Award may then be made to the next lower responsive and responsible Bidder or all remaining Bids may be rejected, and the Contract may be re-advertised.
Unless otherwise stipulated in the bid, all manufactured items and fabricated assemblies shall be UL listed or re-examination listing where such has been established by UL for the item(s) offered and furnished.
The City Council of Homestead, acting in session on June 20, 1983, adopted Resolution No. 83-06-21 which states, “That it is the intent and policy of the City Council of the City of Homestead, Florida, that the needs of the City of Homestead for supplies, materials and equipment be met using only those supplies, materials and equipment manufactured in the United States of America when same are available and when the price of same and the bid of same is consistent with the bidding procedures of the City Code of the City of Homestead.”
This Contract shall commence the day after date of award by the City Council of Homestead, Florida (the “City Council”), unless otherwise stipulated in the Notice of Award Letter and/or Notice to Proceed, which is distributed by the Procurement & Contract Services Director. The Contract shall remain in effect through successful job completion.
Items may be tested for compliance with specifications. Items delivered, not conforming to specifications, may be rejected and returned at vendor’s expense. These items and items not delivered as per delivery date in bid and/or purchase order may be purchased on the open market. Any increase in cost may be charged against the Bidder. Any violation of these stipulations may also result in:
It is understood and agreed between the parties herein that the City shall be bound hereunder only to the extent of the funds available or which may hereafter become available for the purpose of this contract.
In case of any doubt or difference of opinion as to the items to be furnished hereunder, the decision of the buyer shall be final and binding on both parties.
Refer to Article 10 in Section 9 - Special Provisions for Construction Contract.
Federal, state, county and city laws, ordinances, rules and regulations that in any manner affect the items covered herein apply. Lack of knowledge by the Bidder will in no way be a cause for relief from responsibility.
The Bidder, without exception, shall indemnify and save harmless the City of Homestead, Florida and its employees from liability of any nature or kind, including cost and expenses for, or on account of, any copyrighted, patented, or unpatented invention, process, or article manufactured or used in the performance of the contract, including its use by The City of Homestead, Florida. If the Bidder uses any design, device or materials covered by letters, patent, or copyright, it is mutually understood and agreed, without exception, that the bid prices shall include all royalties or costs arising from the use of such design, device, or materials in any way involved in the work.
Inspection and acceptance will be destination unless otherwise provided. Title to/or risk of loss or damage to all items shall be the responsibility of the successful Bidder until acceptance by the buyer unless loss or damage results from negligence by the buyer. If the materials or services supplied to the City are found to be defective or to not conform to specifications, the City reserves the right to cancel the order upon written notice to the seller and return product at Bidder’s expense.
NOTE TO VENDORS DELIVERING TO WAREHOUSE:
Receiving hours are Monday through Friday, excluding holidays, from 7:00 a.m. to 3:30 p.m. The warehouse is located at 450 S.E. 6 Avenue, Homestead, FL, 33030.
Final completion shall be achieved 120 calendar days from issuance of Notice to Proceed.
The liquidated damages specified in paragraph 2.20 LIQUIDATED DAMAGES below shall apply. The project shall not be deemed to be complete until such time as the work has been completed in accordance with specifications enumerated herein. Completed work shall be subject to the inspection and approval of the Project Manager.
The Bidder warrants that the product supplied to the City of Homestead, Florida shall conform in all respects to the standards set forth in the Occupational Safety and Health Act of 1970, as amended, and the failure to comply with this condition will be considered as a breach of contract. Any fines levied because of inadequacies to comply with these requirements shall be borne solely by the Bidder responsible for same.
The Bidder certifies that he/she is in compliance with the non-discrimination clause contained in Section 202, Executive Order 11246, as amended by Executive Order 11375, relative to equal employment opportunity for all persons without regard to race, color, religion, sex or national origin.
Applicable liquidated damages are the amounts established in the following schedule:
| Original Contract Amount Range | Daily Charge (Per Calendar Day) |
|---|---|
| $299,999 and under | $904 |
| $300,000 – less than $2,000,000 | $1,685 |
| $2,000,000 – less than $5,000,000 | $2,667 |
| $5,000,000 – less than $10,000,000 | $3,813 |
| $10,000,000 – less than $20,000,000 | $5,021 |
| $20,000,000 – less than $40,000,000 | $7,442 |
| $40,000,000 and over | $10,224 + 0.00005 × (amount over $40M) |
For all contracts, regardless of whether the contract time is stipulated in calendar days, the Engineer will count days in calendar days. If the Contractor or, in case of his default, the surety fails to complete the work within the time stipulated in the Contract, or within such extra time that the CITY may have granted the Contract or, in case of his default, the surety shall pay to the CITY, liquidated damages, in the amount of $1,685.00 per calendar day in which work is not completed. This is imposed as liquidated damages, not as a penalty, in recognition of the difficulty of ascertaining actual damages. The CITY has the right to apply, as payment on such liquidated damages, any money the CITY owes the Contractor. The CITY does not waive its right to liquidated damages due under the Contract by allowing the Contractor to continue and finish the work, or any part of it, after the expiration of the Contract Time including granted time extensions.
In the event additional work requested is not covered in the bid line items, Contractor will be asked to supply a proposal task order with scope of work details, pricing, schedules, deliverables and a not to exceed dollar amount unless authorized by the City contract representative.
Refer to Special Provisions for Construction Contracts, Article 7, Changes in the Work.
In the event of default on a contract, the successful Bidder shall pay all attorneys’ fees and court costs incurred in collecting any liquidated damages.
The City of Homestead, Florida WILL NOT accept substitute shipments of any kind. Bidder(s) is expected to furnish the brand quoted in their bid once awarded. Any substitute shipments will be returned at the Bidder’s expense.
Please contact the City Attorney for any questions concerning “Cone of Silence” compliance.
The City reserves the right to conduct site visits to Contractor’s business location(s) at any time with prior notice and/or may request that Contractor participate in live presentations. The selection of a contractor may be based wholly or in part upon the results of site visits or live presentations.
The successful Bidder, prior to hiring to fill each vacancy arising as a result of this solicitation shall (1) first notify the City’s designated Referral Agency for this solicitation, of the vacancy and list the vacancy with the designated agency, and (2) make a good faith effort to fill its employment needs through the designated agency. If no suitable candidates can be employed after a Referral Period of three to five days, the successful Bidder is free to fill its vacancies from other sources. Successful Bidders will be required to provide quarterly reports to the designated agency indicating the name and number of employees hired in the previous quarter, or why referred candidates were rejected.
The City of the City of Homestead may, in its sole and absolute discretion, accept or reject, in whole or in part, for any reason whatsoever any or all Bids; re-advertise this Bid; postpone or cancel at any time this Bid process; or, waive any formalities of or irregularities in the bidding process. Bids that are not submitted on time and/or do not conform to the City of Homestead’s requirements will not be considered. After all bids are analyzed, organization submitting bids that appear, solely in the opinion of the City of Homestead, to be the most competitive, shall be submitted to the City Council, and the final selection will be made shortly thereafter with a timetable set solely by the City of Homestead. The selection by the City of Homestead shall be based on the bid, which is, in the sole opinion of the City Council, in the best interest of the City of Homestead. The issuance of this bid constitutes only an invitation to make presentations to the City of Homestead. The City of Homestead reserves the right to determine, at its sole discretion, whether any aspect of the bid satisfies the criteria established in this Bid. In all cases the City of Homestead shall have no liability to any contractor for any costs or expense, incurred in connection with this bid or otherwise.
The submission of a Bid shall be prima facie evidence that the Contractor is familiar with and agrees to comply with the contents of this Bid Project.
The Bidder shall obtain and pay for all certificates of competency, licenses, insurance, permits, inspection fees, and any other certification necessary or required for this project; and shall comply with all laws, ordinances, regulations and building code requirements applicable to the work contemplated herein. Building, mechanical, electrical, plumbing and structural permit plans or installations which are reviewed by a third party are subject to fees. Those fees required by the County [i.e.] fire, impact fees, PERA (Permitting Environment and Regulatory Affairs, formerly PERA), code compliance, and State fee’s and surcharges are the responsibility of the Contractor and cannot be waived by the City. These fees will NOT be reimbursed by the City of Homestead and are the sole responsibility of the Contractor. The Bidder shall comply with all laws, ordinances, regulations and building code requirements applicable to the work contemplated herein.
Where Bidders are required to enter or go onto City of Homestead property to deliver materials or perform work or services as a result of a Bid award, the successful Bidder will assume the full duty, obligation and expense of obtaining all necessary licenses, permits and insurance and assure all work complies with all applicable Miami-Dade County and City of Homestead building requirements and the Florida Building Code. The Bidder shall be liable for any damages or loss to the City occasioned by negligence of the Bidder (or agent) or any person the Bidder has designated in the completion of the Contract as a result of his or her Bid.
Successful bidders (General Contractor and Qualifier) must also register with the City of Homestead’s Development Services, Planning and Zoning Department prior to performing any work associated with this project.
All bids submitted shall be binding for 365 calendar days following the Bid Opening.
The Contractor agrees not to enter into subcontracts and shall not assign, transfer, convey, sublet or otherwise dispose of this contract, including any or all of its right, title or interest therein, or his or its power to execute such contract to any person, company or corporation without prior written consent of the City of Homestead.
The submittal of all the items under this article plus the following Sections which are also part of the Contract Documents shall bind the Bidder to all the Provisions of the entire Contract Documents:
Contractor shall indemnify and hold harmless the City of Homestead and City’s officers and employees to the fullest extent authorized by Section 725.06 (2), Florida Statutes, which statutory provisions shall be deemed to be incorporated herein by reference as if fully set forth herein.
In accordance with City Code Section 2-411, there shall be a fifteen (15%) percent local preference given to local businesses who are holders of current city local business tax receipts for businesses which are physically located within the city limits of Homestead and have held such local business tax receipts for a minimum of one year prior to asserting the local preference. Said fifteen (15%) percent local preference must be asserted by the party seeking it at the time the competitive quotation, bid or proposal is made . and shall be calculated by the purchasing department in rating competitive quotations, bids or proposals which are governed by this section of the Code of the city. The local preference shall not apply if the solicitation specifications of the city so state. Further, said local preference, as described above, shall only be applied in certain situations and shall be specifically governed by the below-described limitations:
Section 119.0701(2)(a), Florida Statutes
IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR’S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN PUBLIC RECORDS.
Custodian of Records: ELIZABETH SEWELL, CITY CLERK
Mailing address: 100 CIVIC COURT, HOMESTEAD, FL 33030 Telephone number: 305-224-4442
Email: ESEWELL@HOMESTEADFL.GOV
This Contract may be made available for use by other governmental entities, including but not limited to municipalities, counties, special districts, school boards, and other public agencies within the State of Florida, as well as other states, where permitted by law. Such use shall be at the sole discretion of the Contractor and the requesting governmental entity. The City of Homestead shall not be a party to any transactions between the Contractor and any other governmental entity, and shall bear no liability or responsibility for any obligations, payments, or performance associated with such use. Any governmental entity electing to use this Contract shall do so in accordance with its own procurement policies and procedures, and any terms and conditions mutually agreed upon between the Contractor and the participating entity, provided such terms are consistent with the scope of this Contract. Nothing herein shall be construed to require the Contractor to extend pricing or terms to any entity other than the City of Homestead. This provision is intended to comply with applicable Florida law, including Florida Statutes 287.042(16), and to promote intergovernmental cooperation and efficiency in public procurement.
It is the intent of the City to purchase the items specifically listed in this bid from the awarded vendor. However, items that are to be “Spot Market Purchased” may be purchased by other methods, i.e. Federal, State or local contracts.
As a political subdivision, the City of Homestead is subject to the Florida Sunshine Act and Public Records Law. By submitting a Bid, Contractor acknowledges that the materials submitted with the Bid and the results of the City of Homestead’s evaluation are open to public inspection upon proper request. Contractor should take special note of this as it relates to proprietary information that might be included in its Bid.
The performance of any act by the City or Contractor hereunder may be delayed or suspended at any time while, but only so long as, either party is hindered in or prevented from performance by acts of God, the elements, war, rebellion, strikes, lockouts or any cause beyond the reasonable control of such party, provided however, the City shall have the right to provide substitute service from third parties or City forces and in such event the City shall withhold payment due Contractor for such period of time. If the condition of force majeure exceeds a period of 14 days the City may, at its option and discretion, cancel or renegotiate this Agreement.
By offering a submission pursuant to this Invitation to Bid, the Bidder certifies the Bidder has not divulged, discussed or compared his Bid with other Bidders and has not colluded with any other Bidder or parties to this Bid whatsoever. Also, the Bidder certifies, and in the case of a joint bid, each party thereto certifies, as to his own organization, that in connection with this Bid.
Any prices and/or cost data submitted have been arrived at independently, without consultation, communication or agreement for the purpose of restricting competition, as to any matter relating to such prices and/or cost data, with any other Bidder or with any competitor.
Any prices and/or cost data quoted for this Bid have not knowingly been disclosed by the Bidder and will not knowingly be disclosed by the Bidder prior to the scheduled opening, directly or indirectly to any other Bidder or to any competitor.
No attempt has been made or will be made by the Bidder to induce any other person or firm to submit or not to submit a Bid for the purpose of restricting competition.
The only person or persons interested in this Bid, principal or principals is/are named therein and that no person other than therein mentioned has any interest in this bid or in the contract to be entered into.
No person or agency has been employed or retained to solicit or secure this contract upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee accepting bona fide employees or established commercial agencies maintained by the Bidder for the purpose of doing business.
All agents, employees and subcontractors of the Bidder retained to perform services pursuant to this bid shall comply with all laws of the United States concerning work eligibility.
Whenever two or more Bids which are equal with respect to price, quality and service are received by the State or by any political subdivision for the procurement of commodities or contractual services, a Bid received from a business that certifies that is has implemented a drug-free workplace program shall be given preference in the award process. Established procedures for processing tie Bids will be followed if none of the tied vendors have a drug-free workplace program. In order to have a drug-free workplace program, a business shall:
Property owned and in the possession of the City of Homestead is the responsibility of the City of Homestead. Such property furnished to a Contractor for repair, modification, study, etc., shall remain the property of the City of Homestead. Damages to such property occurring while in the possession of the Contractor shall be the responsibility of the Contractor. Damages occurring to such property while in route to the City of Homestead shall be the responsibility of the Contractor. In the event that such property is destroyed or declared a total loss, the Contractor shall be responsible for replacement value of the property at the current market value, less depreciation of the property if any.
If Contractor defaults in its performance under this Contract and does not cure the default within 30 days after written notice of default, the City Manager may terminate this Contract, in whole or in part, upon written notice without penalty to the City of Homestead. In such event the Contractor shall be liable for damages including the excess cost of procuring similar supplies or services: provided that if, (1) it is determined for any reason that the Contractor was not in default or (2) the Contractor’s failure to perform is without his or his subcontractor’s control, fault or negligence, the termination will be deemed to be a termination for the convenience of the City of Homestead under Section 3.38.
The City Manager may terminate this Contract, in whole or in part, upon 30 days prior written notice when it is in the best interests of the City of Homestead. If this Contract is for supplies, products, equipment, or software, and so terminated for the convenience by the City of Homestead the Contractor will be compensated in accordance with an agreed upon adjustment of cost. To the extent that this Contract is for services and so terminated, the City of Homestead shall be liable only for payment in accordance with the payment provisions of the Contract for those services rendered prior to termination. In no event shall City be liable for consequential damages, including anticipated lost profits on work not performed on this or any other project. The City Manager may terminate this Contract immediately for public health, safety and welfare.
As a political subdivision, the City of Homestead is subject to the Florida Sunshine Act and Public Records Law. If this Contract contains a confidentiality provision, it shall have no application when disclosure is required by Florida law or upon court order.
The validity and effect of this Contract shall be governed by the laws of the State of Florida. The parties agree that any action, mediation or arbitration arising out of this Contract shall take place in Miami-Dade County, Florida.
In connection with any litigation, mediation and arbitration arising out of this Contract, the prevailing party shall be entitled to recover its costs and reasonable attorney’s fees through and including appellate litigation and any post-judgment proceedings.
Nothing contained in this Contract will be deemed or construed to create a partnership or joint venture between the City of Homestead and Contractor, or to create any other similar relationship between the parties.
If any provision of this Contract or the application thereof to any person or circumstance shall to any extent be held invalid, then the remainder of this Contract or the application of such provision to persons or circumstances other than those as to which it is held invalid shall not be affected thereby, and each provision of this Contract shall be valid and enforced to the fullest extent permitted by law.
Except as otherwise expressly provided in this Contract, all covenants, conditions and provisions of this Contract shall be binding upon and shall inure to the benefit of the parties hereto and their respective heirs, legal representatives, successors and assigns.
The headings to the various paragraphs of this Contract have been inserted for convenient reference only and shall not in any manner be construed as modifying, amending or affecting in any way the expressed terms and provisions hereof.
The contract consists of this City of Homestead Bid and specifically this Section III, Contractor’s Response and any written agreement entered into by the City of Homestead and Contractor, and represents the entire understanding and agreement between the parties with respect to the subject matter hereof and supersedes all other negotiations, understanding and representations, if any, made by and between the parties. This Contract may be modified only by a written agreement signed by the City of Homestead and Contractor.
The City shall have access to all books, records, and documents of the successful Bidder which directly relate to the Work to be performed for the purpose of inspection and auditing upon reasonable written notice during normal business hours at the office of the Contractor or at some location mutually agreed upon by the City and the Contractor.
U.S. Department of Labor: In projects having Federal participation, minimum wage rates for the proposed work will be established by the U.S. Department of Labor, Employment Standards Administration. Schedules of labor classifications and corresponding wage rates and benefits will be included in the Bid Documents, and shall apply to this Project.
COMPLIANCE WITH DAVIS-BACON AND ARRA: Pursuant to use of federal funds, the Contractor may be required to comply with the minimum rates for wages for laborers and mechanics as determined by the Secretary of Labor in accordance with the provisions of the Davis-Bacon and Related Acts.
Prevailing wage rates are found at the Department of Labor website: https://www.dol.gov/
A guide for contractors on Davis Bacon can be found online at: https://www.dol.gov/agencies/whd/government-contracts/construction/guidance
No Bid can be withdrawn by a Bidder after it is filed with the Clerk, during the period stipulated in the advertisement for Bids, unless the Bidder makes the request in writing to the City Clerk and the request is received prior to the time set for the opening of Bids.
In the event that a conflict arises between the General Terms and Conditions, Special Conditions, the Technical Specifications, the Bid Submittal Section, or any addendum issued, the order of precedence shall be the last addendum issued, the Bid Submittal Section, the Technical Specifications, the Special Conditions, and then the General Terms and Conditions.
The Bidder certifies that it has fully reviewed the Special Provisions applicable to this Construction Contract and acknowledges and confirms its acceptance of, and agreement to comply with, all such provisions.
Each bid shall be accompanied by a certified cashier’s check, or bid bond, in the amount of 10% of the total bid price, payable toCity of Homestead, as a guarantee that the bidder, if its bid is accepted, will promptly execute the Agreement. The bidder shall guarantee the total bid price for a period of 60 days from the date of the bid opening.
Please scan and upload a copy of your bid bond/cashier's check. Bidder must also DELIVER the original bid guarantee with a postmarked date no later than Friday, July 24, 2026 addressed to:
Xintia Rubio-Rojas, Senior Buyer
Procurement & Contract Services Department
450 SE 6th Avenue Homestead, FL 33030
Please have the Bidder Name, Contract Title ("Barrier Walls for Lucy Switching Station"), and Contract Number ("ITB#202627") listed clearly on the outside of the envelope.
***********IMPORTANT*****************
Bidders are reminded that the Bid Bond must be fully executed. Please verify the Bid Bond is signed and dated, including required signatures from the bidder (principal) and surety/authorized agent. Failure to submit a properly executed Bid Bond may result in disqualification of the bid.
In accordance with Q#3 - Bid Bond - Bidder must deliver the original bid bond to indicated address, prior to the due date.
Proof of delivery (e.g., courier receipt, tracking confirmation, or delivery confirmation) must be submitted at the time of bid submission through the OpenGov portal. Failure to provide evidence that the original Bid Bond has been properly delivered by the submission deadline may result in the bid being deemed non-responsive.
Please download the below documents, complete, and upload.
Download the below documents, complete, sign and notarize where applicable and upload.
Please download the below documents, complete, and upload.
In response to this question, bidders must provide a preliminary project schedule with their bid submission. The schedule will utilize a relative milestone format (i.e., +days or +weeks elapsed from the issuance of the formal Notice to Proceed). The schedule shall demonstrate a logical, sequential workflow and establish a binding commitment to project duration.
Bidder(s) shall submit, with their Bid, a copy of their valid occupational/business license.
State registration [Florida State Registration can be located and printed at www.Sunbiz.org].
It is highly recommended that firms responding to this ITB register their entity at SAM.gov. The process is free and a requirement for award of work on federally funded projects. To register, follow the link provided: https://sam.gov/content/entity-registration . Once registered, your firm will be issued a Unique Identifier Number. The registration process usually takes several days but can be up to several weeks depending on demand. This will be a requirement for the firm selected for award.
Required Documentation:
Provide proof of active SAM registration, including your firm’s Unique Entity Identifier (UEI) and current registration status.
E-VERIFY: In accordance with Section 448.095, Florida Statutes, the City requires all contractors doing business with the City to register with and use the E-Verify system to verify the work authorization status of all newly hired employees. The City will not enter into a contract unless each party to the contract registers with and uses the E-Verify system. The contracting entity must provide of its proof of enrollment in E-Verify. For instructions on how to provide proof of the contracting entity’s participation/enrollment in E-Verify, please visit: https://www.e-verify.gov/faq/how-do-i-provide-proof-of-my-participationenrollment-in-e-verify. By entering into this Agreement, the Contractor acknowledges that it has read Section 448.095, Florida Statutes; will comply with the E-Verify requirements imposed by Section 448.095, Florida Statutes, including but not limited to obtaining E-Verify affidavits from subcontractors; and has executed the required affidavit attached hereto and incorporated herein.
Every public employer, contractor, and subcontractor shall register with and use the E-Verify system to verify the work authorization status of all newly hired employees. A public employer, contractor, or subcontractor may not enter into a contract unless each party to the contract registers with and uses the E-Verify system.
Please download the below documents, complete, and upload.
Submit a Company Profile demonstrating qualifications to perform the work.
Provide evidence of a permanent place of business (including length of time in business).
Demonstrate technical knowledge and relevant experience, including certifications, training, and years of experience with similar products/services.
Include resumes and experience of the proposed Project Manager and/or Project Team.
Show evidence of adequate organizational capacity and qualified manpower (number of employees, warehouse/office size and location).
Provide documentation of financial capability to meet project obligations.
Confirm there are no outstanding or unresolved claims against the firm or its work.
List similar projects completed within the last five (5) years, including type, size, and complexity.
Disclose any pending or past litigation involving the firm, its principals, or officers with the City.
Prospective Bidders need to furnish a list at time of Bid of all sub-contractors to be used during the construction of this project, refer to Section 2.12.
Describe the warranty provided for the products, equipment, materials, or services proposed. Include the warranty duration, coverage, exclusions, and the process for obtaining warranty service in accordance with bid Section 2.8.
MOBILIZATION TIME: Bidders shall specify the estimated response and mobilization time required to commence work after receipt of a Work Order or Notice to Proceed. The stated mobilization time shall be expressed in calendar days and shall represent the Bidder’s firm commitment. The City may rely on the stated mobilization time in evaluating bids and scheduling work. Failure to meet the stated mobilization time during contract performance may be considered in evaluating the Contractor’s performance.
If bidder takes exception to any part of this solicitation, please upload a document with listed exceptions.
Bidder acknowledges that they are solely responsible for reviewing the latest questions and answer, notices and addenda associated with this procurement process. Failure to consider key information and changes within your submission may result in your offer being deemed non-responsive if key data or forms are omitted.
Enter in the number of days for completion time.