SLED Opportunity · WEST VIRGINIA · WEST VIRGINIA PARKWAYS AUTHORITY
AI Summary
RFP for bridge deck replacement and related repairs on the northbound bridge over Little Valley Road on the West Virginia Turnpike. Includes steel painting, shotcrete repairs, and concrete coating. Completion by May 27, 2027.
WV Parkways Bridge Deck Replacement Contract (BDR-2-27) in Raleigh County, West Virginia. The BDR-2-27 project is located along the West Virginia Turnpike at I-77 Milepost 48.00. It consists of fully replacing the northbound bridge deck over Little Valley Road (County Route 4/1) with precast deck panels and barriers utilizing accelerated bridge construction. It also includes fully repainting steelwork, pneumatically applied mortar (shotcrete) repairs to substructure units, and concrete protective coating on all piers, abutments and wingwalls for the bridge over Little Valley Road. The complete bridge deck shall be replaced during the designated ABC timeframe. The deck replacement of Bridge 3041N shall be completed by October 31, 2026. Work on Bridge 3041N consists of approximately 9,412 square feet of bridge deck replacement, 15,870 square feet of steel bridge painting, 11 square yards of shotcrete repairs and 5,830 square feet of concrete protective coating. All work under this contract shall be completed by May 27th, 2027. The bid opening will be held via teleconference. To hear bid results, dial the number below and enter the Participant Code: Conference Dial-In: (816)-702-6618 Participant Code: 439506264#
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.