SLED Opportunity · MINNESOTA · STATEWIDE — STATE OF MINNESOTA
AI Summary
Bridge replacement project in Beltrami Island State Forest, MN, including demolition, excavation, concrete abutments, piling, and steel beam bridge installation. Estimated value $553K, completion by Aug 2027. Targeted group subcontracting goal applies.
This project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference and has a 3% (TG/ED/VO) subcontracting goal established. SUMMARY OF WORK: The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Demolish and remove existing timber bridge. 2. Excavate 680 cy. Furnish and install Select Granular (344 cy). 3. Construct new Concrete abutments (38 cy) and Footings (46 cy). 4. Furnish and install 240 LF of CIP Piling. 5. Furnish and Install new 60’x20’ multi steel beam bridge Plans and Specifications were prepared by the Minnesota Department of Natural Resources, Contact: Jeff Erickson, email: jeff.erickson@state.mn.us, Telephone: (218) 308-2639. Category: Bridge (Replacement or Rehabilitation). Estimated Value: $ 553,320.00. Estimated Completion Date: Aug. 31, 2027. Pre-Bid Meeting: No Pre-Bid Meeting Bid Submission: All responses to this solicitation must be submitted and received in the Quest CDN Plan Room no later than 2:00pm on July 9, 2026. Bids will only be received and accepted via the online electronic bid service through QuestCDN.com. Bid documents are available for purchase through QuestCDN. Contact us and we will obtain the full document package on your behalf.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.