SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.
Contract Category
47 federal contract opportunities classified as bridge replacement.
AI Summary
This RFP invites Northeast Small Business MATOC Contractors to submit price proposals for the bridge replacement project at Defense Supply Center Columbus, Ohio. The estimated cost is between $1,000,000 and $5,000,000, with proposals due by 11:00 AM ET on May 26, 2026. Payment and performance bonds are required post-aw…
KY
AI Summary
The Sandy Point National Wildlife Refuge project involves sealed bids from certified Small Business Concerns for replacing a wooden bridge and repairing flood damage from Hurricane Fiona. The project is expected to cost less than $250,000, with bid documents available around May 5, 2026. Interested vendors must registe…
VA
AI Summary
This opportunity involves the replacement of the Gibb Wash Bridge on the Coronado National Forest, as outlined in solicitation number 127EAX26Q0022. It is a combined synopsis/solicitation set aside for small businesses, with quotes requested under the RFQ format. The applicable NAICS code is 237310, and the small busin…
NM
AI Summary
This opportunity involves the removal and replacement of the Hole 18 Golf Cart Bridge at Joint Base San Antonio (JBSA) Lackland. Vendors are required to provide a structurally sound pre-fabricated bridge for safe pedestrian and golf cart conveyance. Interested vendors must submit their responses to the attached RFQ by …
TX
AI Summary
The USDA Forest Service is soliciting bids for a bridge replacement project in Warren County, PA. This combined synopsis/solicitation requires the provision of all necessary equipment, labor, and materials for the demolition of the existing bridge and installation of a new one. This opportunity is set aside for small b…
GA
AI Summary
The U.S. Army Corps of Engineers intends to negotiate a sole-source contract with Jacobs Engineering Group Inc. for engineering services related to the Bonneville BN1 Old NL Bridge replacement project. Interested parties may submit capability statements by March 18, 2026, but a solicitation will not be posted. The cont…
OR
AI Summary
The AZ NFSR 289 Bridge Replacement project involves replacing the existing Tonto Creek Bridge and improving access to recreational sites. The project includes roadway reconstruction, bridge construction, and channel grading, with an estimated cost between $2,000,000 and $5,000,000. The anticipated schedule includes adv…
CO
AI Summary
The project aims to enhance access to Causey Reservoir through significant road improvements and bridge replacements. It includes multiple schedules and options for reconstruction, with an estimated cost between $10 million and $20 million. A pre-bid site visit is scheduled for October 7, 2025, to familiarize contracto…
CO
AI Summary
The AZ NFSR 289 Bridge Replacement project involves replacing the existing Tonto Creek Bridge and improving access to recreational sites. The project includes roadway reconstruction, bridge construction, and parking lot improvements, with an estimated cost between $2,000,000 and $5,000,000. The advertisement is schedul…
CO
AI Summary
The project aims to enhance access to Causey Reservoir through significant road improvements and bridge replacements. It includes multiple schedules and options for reconstruction, with an estimated cost between $10 million and $20 million. A pre-bid site visit is scheduled for October 7, 2025, to familiarize contracto…
CO
AI Summary
The AZ NFSR 289 Bridge Replacement project involves replacing the existing Tonto Creek Bridge and improving access to recreational sites. The project includes roadway reconstruction, bridge construction, and channel grading. The estimated cost ranges from $2,000,000 to $5,000,000, with advertisement in October 2025 and…
CO
AI Summary
The AZ NFSR 289 Bridge Replacement project involves replacing the existing Tonto Creek Bridge and improving access to recreational sites. The project includes roadway reconstruction, bridge construction, and channel grading, with an estimated cost between $2,000,000 and $5,000,000. The advertisement is scheduled for Oc…
CO
AI Summary
The AZ NFSR 289 Bridge Replacement project involves replacing the existing Tonto Creek Bridge and improving access to recreational sites. The project includes roadway reconstruction, bridge construction, and channel grading, with an estimated cost between $2,000,000 and $5,000,000. The advertisement is scheduled for Oc…
CO
AI Summary
The project aims to enhance access to Causey Reservoir through significant roadway improvements, including reconstruction and bridge replacement. It is set for advertisement in October 2025, with an estimated cost between $10 million and $20 million. A non-mandatory pre-bid site visit is scheduled for October 7, 2025, …
CO
AI Summary
The project aims to enhance access to Causey Reservoir through significant road improvements and bridge replacements in Weber County, Utah. It includes multiple schedules and options for reconstruction, with an estimated cost between $10 million and $20 million. A pre-bid site visit is scheduled for October 7, 2025, to…
CO
AI Summary
The project aims to enhance access to Causey Reservoir through significant road improvements and bridge replacements. It includes multiple schedules and options for reconstruction, with an estimated cost between $10 million and $20 million. A pre-bid site visit is scheduled for October 7, 2025, to familiarize contracto…
CO
AI Summary
The AZ NFSR 289 Bridge Replacement project involves replacing the existing Tonto Creek Bridge and improving access to recreational sites. The project includes roadway reconstruction, bridge construction, and parking lot improvements, with an estimated cost between $2,000,000 and $5,000,000. The advertisement is schedul…
CO
AI Summary
The project aims to enhance access to Causey Reservoir through significant road improvements and bridge replacements in Weber County, Utah. It includes various schedules and options for reconstruction, with an estimated cost between $10 million and $20 million. A pre-bid site visit is scheduled for October 7, 2025, to …
CO
AI Summary
The AZ NFSR 289 Bridge Replacement project involves replacing the existing Tonto Creek Bridge and improving access to recreational sites. The project includes roadway reconstruction, bridge construction, and channel grading, with an estimated cost between $2,000,000 and $5,000,000. The anticipated schedule includes adv…
CO
AI Summary
The project aims to enhance access to Causey Reservoir through significant road improvements and bridge replacements in Weber County, Utah. It includes multiple schedules and options for reconstruction, with an estimated cost between $10 million and $20 million. A pre-bid site visit is scheduled for October 7, 2025, to…
CO
Common questions about finding and winning bridge replacement government contracts.