SLED Opportunity · CALIFORNIA · CITY OF LAGUNA NIGUEL
AI Summary
City of Laguna Niguel seeks qualified contractors for Bus Shelter Replacement Project involving installation of prefabricated shelters, sidewalk replacement, and related work at 33 bus stops. Construction starts June 2026, estimated cost $1.8M, with mandatory pre-qualification.
The Bus Shelter Replacement Project involves the installation of new prefabricatedshelters at up to 33 existing bus stop locations throughout the City of Laguna Niguel(Project). The Scope of Work includes, but is not limited to, traffic control, removeand replace concrete sidewalk panels, protection of utilities, sign relocations, andproviding and installing designated premanufactured bus shelters includingamenities (bench, trash receptacle, lighting, display case and custom-brandingelements) all in accordance with the Plans, Specifications and Contract Documents.All work shall be completed within 90 working days from the date of the Notice toProceed. Construction is anticipated to start in June 2026. The Construction Costestimate is $1,800,000. Pre-Bid Meeting Information: No Online Q&A: Yes Location Information: Department: PUBLIC WORKS Address: 30111 CROWN VALLEY PARKWAY2ND FLOORLAGUNA NIGUEL, California92677 County: Orange Other Details: It is mandatory that all Contractors who intend to submit a bid, fully complete thepre-qualification questionnaire, provide all materials requested herein, and beapproved by the City to be on the final qualified bidders list. No bid will be acceptedfrom a Contractor that has failed to comply with these requirements.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.