SLED Opportunity · KANSAS · HAYS UNIFIED SCHOOL DISTRICT 489

    Cabinet Fabrication and Installation

    Issued by Hays Unified School District 489
    educationRFPHays Unified School District 489Sol. 75e7bb1e-cabb-46b3-867b-7487c227adfe
    Closed
    STATUS
    Closed
    due May 26, 2026
    PUBLISHED
    May 18, 2026
    Posting date
    JURISDICTION
    Hays Unified
    education
    NAICS CODE
    337110
    AI-classified industry

    AI Summary

    Hays USD 489 requests proposals for custom cabinet fabrication and installation at the Early Childhood Connections facility in Hays, Kansas. The project includes manufacturing and installing frameless cabinetry with specified materials and hardware. Proposals are due by May 26, 2026.

    Opportunity details

    Solicitation No.
    75e7bb1e-cabb-46b3-867b-7487c227adfe
    Type / RFx
    RFP
    Status
    active
    Level
    education
    Published Date
    May 18, 2026
    Due Date
    May 26, 2026
    NAICS Code
    337110AI guide
    State
    Kansas
    Agency
    Hays Unified School District 489

    Description

    Cabinet Fabrication and Installation

    Early Childhood Connections Facility

    2501 E. 13th Street
    Hays, Kansas 67601

     


    1. Introduction

    USD 489 / Early Childhood Connections is requesting sealed proposals from qualified cabinet manufacturers and installers for the fabrication and installation of custom cabinetry for designated areas within the Early Childhood Connections facility located at 2501 E. 13th Street, Hays, Kansas.

    The project includes fabrication, delivery, and professional installation of custom frameless cabinetry as illustrated in the attached conceptual drawings and specifications.


    2. Project Scope

    The successful vendor shall provide all labor, materials, equipment, transportation, hardware, and installation services necessary to complete the cabinetry project.

    Project areas include:

    • Hallway tall storage cabinetry

    • Sink and countertop cabinetry areas

    • Base cabinets

    • Wall cabinets

    • Tall cabinets

    • Finished end panels

    • Toe kicks

    • Fillers and trim

    • Cabinet hardware

    • Installation and final adjustment

    Reference drawings are included for layout and configuration expectations.


    3. Cabinet Construction Specifications

    All cabinetry shall meet or exceed the following minimum specifications:

    Construction

    • True frameless (European-style) cabinet construction

    • CNC-machined precision fabrication

    • Full-access cabinet openings

    • Clean, modern appearance suitable for commercial applications

    Materials

    • 3/4” premium furniture-grade thermally fused melamine (TFM) panels

    • Moisture-resistant, scratch-resistant melamine surfaces

    • 1/4” fully captured matching melamine backs

    • Matching finished end panels on all exposed ends

    • PVC edgebanding color-matched to cabinet surfaces

    Joinery

    • Confirmat screws, hardwood dowels, and industrial adhesives

    • Full-depth dado and rabbet joinery where applicable

    • Square and rigid assemblies designed for commercial use

    Drawer Systems

    • Premium double-wall steel drawer systems

    • Full-extension concealed undermount slides

    • Soft-close operation

    • Minimum 110 lb dynamic load rating

    Door Hardware

    • Concealed soft-close hinges

    • Three-way adjustable hinges

    • Tool-free removable hinge system preferred

    Shelving

    • Adjustable shelving with heavy-duty shelf pins

    • Precision 32mm shelf spacing system

    Toe Kicks

    • Moisture-resistant construction

    • Finished to match adjacent cabinetry

    Complete specifications are detailed in the attached cabinet specification document.


    4. Installation Requirements

    The awarded vendor shall:

    • Deliver and professionally install all cabinetry

    • Level, plumb, shim, and securely anchor all cabinets

    • Install fillers, toe kicks, trim, and accessories

    • Adjust all doors and drawers for proper alignment

    • Ensure smooth soft-close operation

    • Remove all installation debris

    • Leave project ready for countertop installation and final trades

    Installation shall comply with industry standards and manufacturer recommendations.


    5. Proposal Requirements

    Proposals shall include:

    1. Company information and contact person

    2. Relevant project experience

    3. Estimated project timeline

    4. Detailed pricing breakdown

    5. Material specifications and cabinet construction details

    6. Warranty information

    7. Proof of insurance

    8. References from similar commercial projects


    6. Site Visit

    Vendors are encouraged to visit the project site prior to submitting proposals to verify dimensions, conditions, and installation requirements.


    7. Evaluation Criteria

    Proposals will be evaluated based on:

    • Compliance with specifications

    • Quality of materials and construction

    • Experience and references

    • Installation capabilities

    • Project timeline

    • Cost

    USD 489 / Early Childhood Connections reserves the right to reject any or all proposals and waive informalities in the bidding process.


    8. Submission Information

    Proposals shall be submitted by e-bid no later than:

    May 26, 2026

    Work must be completed by June 30, 2026

    Key dates

    1. May 18, 2026Published
    2. May 26, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.