SLED Opportunity · GEORGIA · GEORGIA
AI Summary
Cobb County Board of Education seeks contractors for canopy installation and concrete work at three school locations in Georgia, including demolition, new canopy design, and curb and gutter installation.
This project includes canopy work at three Cobb County School District locations, as outlined below: ¿ Cheatham Hill Elementary School: Demolish approximately 1,600 square feet of existing concrete sidewalk at the canopy extension area. Design and install a new canopy extending from the existing canopy along the drive aisle to the end of the school building; 2 different heights. The canopy will be approximately 245 feet long and 8 feet wide. Demolish and replace approximately 2,200 square feet of concrete at the front entrance and replace the existing flagpole. New curb and gutter required at all new sidewalk areas. ¿ East Side Elementary School: Base Bid- Install a new canopy at the main entrance, extending from the existing canopy toward the drive aisle exit. The canopy will be approximately 75 feet long and 10 feet wide. Alternate #1: Add a new canopy at the side Entry Canopy / ASP Doorway, L-shaped configuration, approximately 80¿ in length by 10¿ wide. ¿ Palmer Middle School: Design and install a new canopy system extending from the front entrance to the drive aisle, then continuing along the drive aisle for the full length of the student pick-up area. The canopy will be approximately 270 feet long; width varies ¿ please refer to the drawings.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.