Active SLED Opportunity · COLORADO · TOWN OF PARKER
AI Summary
Invitation to Bid for landscaping and irrigation installation in medians along Stroh Road, Town of Parker, Colorado. Includes irrigation, electrical, landscaping, and traffic control work with bid due May 12, 2026.
The work consists of installation of approximately 390 LF of irrigation main line, backflow preventors, a water meter, electrical infrastructure for irrigation controllers and an outlet including approximately 1,550 LF of conduit, approximately 8,800 SF of rock mulch with weed barrier fabric, and planting trees, shrubs, and perennials in two medians and a tree lawn along Stroh Road. **Project Type**: ITB - Invitation to Bid (Formal) **Source ID**: PU.AG.USA.1266.C11686526 **Piggyback Contract**: No **Question Acceptance Deadline**: 05/06/2026 07:00 PM EDT **Questions are submitted online**: No **Bid Submission Type**: Electronic Bid Submission **Additional Bidding Instructions**: You must complete the Bidnet Bid Schedule as well as upload a signed copy to be considered compliant. **Owner Organization**: Town of Parker **Reference Number**: 0000420591 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Bonds | Signed Bid Bonds, and any Addendums | Yes | No | | Bid Tab | Signed Bid Tab | Yes | No | | Insurance and W9 | Please upload current insurance and W9 | Yes | No | **Line Items**: | Code | Description | UOM | Qty | Code | Description | Price | |---|---|---|---|---|---|---| | Next Project 1 Next Schedule I-Stroh Road Median Landscaping STANDARD Code Description UOM Qty 1 Topsoil Cubic Yard 23 2 Clearing & Grubbing (Special) Lump-Sum 1 3 Irrigation Lump-Sum 1 4 1" Copper Piping Linear Foot/Feet 365 5 Landscaping Lump-Sum 1 6 Electrical Lump-Sum 1 7 Traffic Control Lump-Sum 1 8 Mobilization Lump-Sum 1 Next Schedule II-Fixed Accounts & Minor Contract Revisions COST ALLOWANCE Code Description Price F/A Erosion Control $5,000.00 F/A Parker Water and Santiation Water Tap $5,000.00 F/A Minor Contract Revisions (MCR) $15,000.00 | Next Schedule I-Stroh Road Median Landscaping STANDARD Code Description UOM Qty 1 Topsoil Cubic Yard 23 2 Clearing & Grubbing (Special) Lump-Sum 1 3 Irrigation Lump-Sum 1 4 1" Copper Piping Linear Foot/Feet 365 5 Landscaping Lump-Sum 1 6 Electrical Lump-Sum 1 7 Traffic Control Lump-Sum 1 8 Mobilization Lump-Sum 1 | 1 | Topsoil | Cubic Yard | 23 | 2 | Clearing & Grubbing (Special) | Lump-Sum | 1 | 3 | Irrigation | Lump-Sum | 1 | 4 | 1" Copper Piping | Linear Foot/Feet | 365 | 5 | Landscaping | Lump-Sum | 1 | 6 | Electrical | Lump-Sum | 1 | 7 | Traffic Control | Lump-Sum | 1 | 8 | Mobilization | Lump-Sum | 1 | | Next Schedule II-Fixed Accounts & Minor Contract Revisions COST ALLOWANCE Code Description Price F/A Erosion Control $5,000.00 F/A Parker Water and Santiation Water Tap $5,000.00 F/A Minor Contract Revisions (MCR) $15,000.00 | F/A | Erosion Control | $5,000.00 | F/A | Parker Water and Santiation Water Tap | $5,000.00 | F/A | Minor Contract Revisions (MCR) | $15,000.00 | | | | Next Schedule I-Stroh Road Median Landscaping STANDARD Code Description UOM Qty 1 Topsoil Cubic Yard 23 2 Clearing & Grubbing (Special) Lump-Sum 1 3 Irrigation Lump-Sum 1 4 1" Copper Piping Linear Foot/Feet 365 5 Landscaping Lump-Sum 1 6 Electrical Lump-Sum 1 7 Traffic Control Lump-Sum 1 8 Mobilization Lump-Sum 1 | 1 | Topsoil | Cubic Yard | 23 | 2 | Clearing & Grubbing (Special) | Lump-Sum | 1 | 3 | Irrigation | Lump-Sum | 1 | 4 | 1" Copper Piping | Linear Foot/Feet | 365 | 5 | Landscaping | Lump-Sum | 1 | 6 | Electrical | Lump-Sum | 1 | 7 | Traffic Control | Lump-Sum | 1 | 8 | Mobilization | Lump-Sum | 1 | | | 1 | Topsoil | Cubic Yard | 23 | | 2 | Clearing & Grubbing (Special) | Lump-Sum | 1 | | 3 | Irrigation | Lump-Sum | 1 | | 4 | 1" Copper Piping | Linear Foot/Feet | 365 | | 5 | Landscaping | Lump-Sum | 1 | | 6 | Electrical | Lump-Sum | 1 | | 7 | Traffic Control | Lump-Sum | 1 | | 8 | Mobilization | Lump-Sum | 1 | | Next Schedule II-Fixed Accounts & Minor Contract Revisions COST ALLOWANCE Code Description Price F/A Erosion Control $5,000.00 F/A Parker Water and Santiation Water Tap $5,000.00 F/A Minor Contract Revisions (MCR) $15,000.00 | F/A | Erosion Control | $5,000.00 | F/A | Parker Water and Santiation Water Tap | $5,000.00 | F/A | Minor Contract Revisions (MCR) | $15,000.00 | | | F/A | Erosion Control | $5,000.00 | | F/A | Parker Water and Santiation Water Tap | $5,000.00 | | F/A | Minor Contract Revisions (MCR) | $15,000.00 | **Line Items**: | Code | Description | UOM | Qty | Code | Description | Price | |---|---|---|---|---|---|---| | Next Schedule I-Stroh Road Median Landscaping STANDARD Code Description UOM Qty 1 Topsoil Cubic Yard 23 2 Clearing & Grubbing (Special) Lump-Sum 1 3 Irrigation Lump-Sum 1 4 1" Copper Piping Linear Foot/Feet 365 5 Landscaping Lump-Sum 1 6 Electrical Lump-Sum 1 7 Traffic Control Lump-Sum 1 8 Mobilization Lump-Sum 1 | 1 | Topsoil | Cubic Yard | 23 | 2 | Clearing & Grubbing (Special) | Lump-Sum | 1 | 3 | Irrigation | Lump-Sum | 1 | 4 | 1" Copper Piping | Linear Foot/Feet | 365 | 5 | Landscaping | Lump-Sum | 1 | 6 | Electrical | Lump-Sum | 1 | 7 | Traffic Control | Lump-Sum | 1 | 8 | Mobilization | Lump-Sum | 1 | | | 1 | Topsoil | Cubic Yard | 23 | | 2 | Clearing & Grubbing (Special) | Lump-Sum | 1 | | 3 | Irrigation | Lump-Sum | 1 | | 4 | 1" Copper Piping | Linear Foot/Feet | 365 | | 5 | Landscaping | Lump-Sum | 1 | | 6 | Electrical | Lump-Sum | 1 | | 7 | Traffic Control | Lump-Sum | 1 | | 8 | Mobilization | Lump-Sum | 1 | | Next Schedule II-Fixed Accounts & Minor Contract Revisions COST ALLOWANCE Code Description Price F/A Erosion Control $5,000.00 F/A Parker Water and Santiation Water Tap $5,000.00 F/A Minor Contract Revisions (MCR) $15,000.00 | F/A | Erosion Control | $5,000.00 | F/A | Parker Water and Santiation Water Tap | $5,000.00 | F/A | Minor Contract Revisions (MCR) | $15,000.00 | | | F/A | Erosion Control | $5,000.00 | | F/A | Parker Water and Santiation Water Tap | $5,000.00 | | F/A | Minor Contract Revisions (MCR) | $15,000.00 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | 1 | Topsoil | Cubic Yard | 23 | | 2 | Clearing & Grubbing (Special) | Lump-Sum | 1 | | 3 | Irrigation | Lump-Sum | 1 | | 4 | 1" Copper Piping | Linear Foot/Feet | 365 | | 5 | Landscaping | Lump-Sum | 1 | | 6 | Electrical | Lump-Sum | 1 | | 7 | Traffic Control | Lump-Sum | 1 | | 8 | Mobilization | Lump-Sum | 1 | **Line Items**: | Code | Description | Price | |---|---|---| | F/A | Erosion Control | $5,000.00 | | F/A | Parker Water and Santiation Water Tap | $5,000.00 | | F/A | Minor Contract Revisions (MCR) | $15,000.00 |
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.