Active SLED Opportunity · COLORADO · TOWN OF PARKER

    CIP26-009 Stroh Median Landscaping

    Issued by Town of Parker
    cityITBTown of ParkerSol. 8736350960
    Open · 18d remaining
    DAYS TO CLOSE
    18
    due May 12, 2026
    PUBLISHED
    Apr 21, 2026
    Posting date
    JURISDICTION
    Town of
    city
    NAICS CODE
    237310
    AI-classified industry

    AI Summary

    Invitation to Bid for landscaping and irrigation installation in medians along Stroh Road, Town of Parker, Colorado. Includes irrigation, electrical, landscaping, and traffic control work with bid due May 12, 2026.

    Opportunity details

    Solicitation No.
    8736350960
    Type / RFx
    ITB
    Status
    Active
    Level
    city
    Published Date
    April 21, 2026
    Due Date
    May 12, 2026
    NAICS Code
    237310AI guide
    Jurisdiction
    Town of Parker
    Agency
    Town of Parker

    Description

    The work consists of installation of approximately 390 LF of irrigation main line, backflow preventors, a water meter, electrical infrastructure for irrigation controllers and an outlet including approximately 1,550 LF of conduit, approximately 8,800 SF of rock mulch with weed barrier fabric, and planting trees, shrubs, and perennials in two medians and a tree lawn along Stroh Road. **Project Type**: ITB - Invitation to Bid (Formal) **Source ID**: PU.AG.USA.1266.C11686526 **Piggyback Contract**: No **Question Acceptance Deadline**: 05/06/2026 07:00 PM EDT **Questions are submitted online**: No **Bid Submission Type**: Electronic Bid Submission **Additional Bidding Instructions**: You must complete the Bidnet Bid Schedule as well as upload a signed copy to be considered compliant. **Owner Organization**: Town of Parker **Reference Number**: 0000420591 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Bonds | Signed Bid Bonds, and any Addendums | Yes | No | | Bid Tab | Signed Bid Tab | Yes | No | | Insurance and W9 | Please upload current insurance and W9 | Yes | No | **Line Items**: | Code | Description | UOM | Qty | Code | Description | Price | |---|---|---|---|---|---|---| | Next Project 1 Next Schedule I-Stroh Road Median Landscaping STANDARD Code Description UOM Qty 1 Topsoil Cubic Yard 23 2 Clearing & Grubbing (Special) Lump-Sum 1 3 Irrigation Lump-Sum 1 4 1" Copper Piping Linear Foot/Feet 365 5 Landscaping Lump-Sum 1 6 Electrical Lump-Sum 1 7 Traffic Control Lump-Sum 1 8 Mobilization Lump-Sum 1 Next Schedule II-Fixed Accounts & Minor Contract Revisions COST ALLOWANCE Code Description Price F/A Erosion Control $5,000.00 F/A Parker Water and Santiation Water Tap $5,000.00 F/A Minor Contract Revisions (MCR) $15,000.00 | Next Schedule I-Stroh Road Median Landscaping STANDARD Code Description UOM Qty 1 Topsoil Cubic Yard 23 2 Clearing & Grubbing (Special) Lump-Sum 1 3 Irrigation Lump-Sum 1 4 1" Copper Piping Linear Foot/Feet 365 5 Landscaping Lump-Sum 1 6 Electrical Lump-Sum 1 7 Traffic Control Lump-Sum 1 8 Mobilization Lump-Sum 1 | 1 | Topsoil | Cubic Yard | 23 | 2 | Clearing & Grubbing (Special) | Lump-Sum | 1 | 3 | Irrigation | Lump-Sum | 1 | 4 | 1" Copper Piping | Linear Foot/Feet | 365 | 5 | Landscaping | Lump-Sum | 1 | 6 | Electrical | Lump-Sum | 1 | 7 | Traffic Control | Lump-Sum | 1 | 8 | Mobilization | Lump-Sum | 1 | | Next Schedule II-Fixed Accounts & Minor Contract Revisions COST ALLOWANCE Code Description Price F/A Erosion Control $5,000.00 F/A Parker Water and Santiation Water Tap $5,000.00 F/A Minor Contract Revisions (MCR) $15,000.00 | F/A | Erosion Control | $5,000.00 | F/A | Parker Water and Santiation Water Tap | $5,000.00 | F/A | Minor Contract Revisions (MCR) | $15,000.00 | | | | Next Schedule I-Stroh Road Median Landscaping STANDARD Code Description UOM Qty 1 Topsoil Cubic Yard 23 2 Clearing & Grubbing (Special) Lump-Sum 1 3 Irrigation Lump-Sum 1 4 1" Copper Piping Linear Foot/Feet 365 5 Landscaping Lump-Sum 1 6 Electrical Lump-Sum 1 7 Traffic Control Lump-Sum 1 8 Mobilization Lump-Sum 1 | 1 | Topsoil | Cubic Yard | 23 | 2 | Clearing & Grubbing (Special) | Lump-Sum | 1 | 3 | Irrigation | Lump-Sum | 1 | 4 | 1" Copper Piping | Linear Foot/Feet | 365 | 5 | Landscaping | Lump-Sum | 1 | 6 | Electrical | Lump-Sum | 1 | 7 | Traffic Control | Lump-Sum | 1 | 8 | Mobilization | Lump-Sum | 1 | | | 1 | Topsoil | Cubic Yard | 23 | | 2 | Clearing & Grubbing (Special) | Lump-Sum | 1 | | 3 | Irrigation | Lump-Sum | 1 | | 4 | 1" Copper Piping | Linear Foot/Feet | 365 | | 5 | Landscaping | Lump-Sum | 1 | | 6 | Electrical | Lump-Sum | 1 | | 7 | Traffic Control | Lump-Sum | 1 | | 8 | Mobilization | Lump-Sum | 1 | | Next Schedule II-Fixed Accounts & Minor Contract Revisions COST ALLOWANCE Code Description Price F/A Erosion Control $5,000.00 F/A Parker Water and Santiation Water Tap $5,000.00 F/A Minor Contract Revisions (MCR) $15,000.00 | F/A | Erosion Control | $5,000.00 | F/A | Parker Water and Santiation Water Tap | $5,000.00 | F/A | Minor Contract Revisions (MCR) | $15,000.00 | | | F/A | Erosion Control | $5,000.00 | | F/A | Parker Water and Santiation Water Tap | $5,000.00 | | F/A | Minor Contract Revisions (MCR) | $15,000.00 | **Line Items**: | Code | Description | UOM | Qty | Code | Description | Price | |---|---|---|---|---|---|---| | Next Schedule I-Stroh Road Median Landscaping STANDARD Code Description UOM Qty 1 Topsoil Cubic Yard 23 2 Clearing & Grubbing (Special) Lump-Sum 1 3 Irrigation Lump-Sum 1 4 1" Copper Piping Linear Foot/Feet 365 5 Landscaping Lump-Sum 1 6 Electrical Lump-Sum 1 7 Traffic Control Lump-Sum 1 8 Mobilization Lump-Sum 1 | 1 | Topsoil | Cubic Yard | 23 | 2 | Clearing & Grubbing (Special) | Lump-Sum | 1 | 3 | Irrigation | Lump-Sum | 1 | 4 | 1" Copper Piping | Linear Foot/Feet | 365 | 5 | Landscaping | Lump-Sum | 1 | 6 | Electrical | Lump-Sum | 1 | 7 | Traffic Control | Lump-Sum | 1 | 8 | Mobilization | Lump-Sum | 1 | | | 1 | Topsoil | Cubic Yard | 23 | | 2 | Clearing & Grubbing (Special) | Lump-Sum | 1 | | 3 | Irrigation | Lump-Sum | 1 | | 4 | 1" Copper Piping | Linear Foot/Feet | 365 | | 5 | Landscaping | Lump-Sum | 1 | | 6 | Electrical | Lump-Sum | 1 | | 7 | Traffic Control | Lump-Sum | 1 | | 8 | Mobilization | Lump-Sum | 1 | | Next Schedule II-Fixed Accounts & Minor Contract Revisions COST ALLOWANCE Code Description Price F/A Erosion Control $5,000.00 F/A Parker Water and Santiation Water Tap $5,000.00 F/A Minor Contract Revisions (MCR) $15,000.00 | F/A | Erosion Control | $5,000.00 | F/A | Parker Water and Santiation Water Tap | $5,000.00 | F/A | Minor Contract Revisions (MCR) | $15,000.00 | | | F/A | Erosion Control | $5,000.00 | | F/A | Parker Water and Santiation Water Tap | $5,000.00 | | F/A | Minor Contract Revisions (MCR) | $15,000.00 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | 1 | Topsoil | Cubic Yard | 23 | | 2 | Clearing & Grubbing (Special) | Lump-Sum | 1 | | 3 | Irrigation | Lump-Sum | 1 | | 4 | 1" Copper Piping | Linear Foot/Feet | 365 | | 5 | Landscaping | Lump-Sum | 1 | | 6 | Electrical | Lump-Sum | 1 | | 7 | Traffic Control | Lump-Sum | 1 | | 8 | Mobilization | Lump-Sum | 1 | **Line Items**: | Code | Description | Price | |---|---|---| | F/A | Erosion Control | $5,000.00 | | F/A | Parker Water and Santiation Water Tap | $5,000.00 | | F/A | Minor Contract Revisions (MCR) | $15,000.00 |

    Key dates

    1. April 21, 2026Published
    2. May 12, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.