SLED Opportunity · CALIFORNIA · CALIFORNIA

    CITYWIDE ELECTRIC VEHICLE CHARGING INSTALLATION PROJECT

    Issued by City of Santa Clara
    localRFPCaliforniaSol. 8045574366
    Closed
    STATUS
    Closed
    due Jan 29, 2026
    PUBLISHED
    Dec 16, 2025
    Posting date
    JURISDICTION
    California
    local
    NAICS CODE
    541330
    AI-classified industry

    AI Summary

    City of Santa Clara seeks engineering design services for a citywide electric vehicle charging installation project, including bid document preparation, design, and construction support across multiple engineering disciplines.

    Opportunity details

    Solicitation No.
    8045574366
    Type / RFx
    RFP
    Status
    Active
    Level
    local
    Published Date
    December 16, 2025
    Due Date
    January 29, 2026
    NAICS Code
    541330AI guide
    Jurisdiction
    California
    Agency
    City of Santa Clara

    Description

    The Public Works Department of the City of Santa Clara is seeking proposals from qualified firms to provide engineering design services to prepare bid documents (plans, specifications, and engineer’s estimate - PS&E) for public works bidding of the Citywide Electric Vehicle Charging Installation Project (PROJECT). The requested engineering design services involve design, bidding and award support, and construction support. See Attachment A, Scope of Services, for the anticipated professional services necessary to meet the purpose for this PROJECT. The selected firm shall be able to provide comprehensive engineering services that encompasses all disciplines, which include, but are not limited to architectural, civil, electrical, mechanical, plumping, geotechnical, environmental, technology, communications, electric vehicle charging, solar design, and any other disciplines deemed necessary to complete the PROJECT. The Public Works Department of the City of Santa Clara is seeking proposals from qualified firms to provide engineering design services to prepare bid documents (plans, specifications, and engineer’s estimate - PS&E) for public works bidding of the Citywide Electric Vehicle Charging Installation Project (PROJECT). The requested engineering design services involve design, bidding and award support, and construction support. See Attachment A, Scope of Services, for the anticipated professional services necessary to meet the purpose for this PROJECT. The selected firm shall be able to provide comprehensive engineering services that encompasses all disciplines, which include, but are not limited to architectural, civil, electrical, mechanical, plumping, geotechnical, environmental, technology, communications, electric vehicle charging, solar design, and any other disciplines deemed necessary to complete the PROJECT.

    Key dates

    1. December 16, 2025Published
    2. January 29, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.