Active SLED Opportunity · OHIO · CITY OF TOLEDO

    Crosstown Water Main Route Study RFP

    Issued by City of Toledo
    cityRFPCity of ToledoSol. 10008808
    Open · 14d remaining
    DAYS TO CLOSE
    14
    due Jul 28, 2026
    PUBLISHED
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    RFP for a comprehensive route selection and pipeline alignment study to replace 3.5 miles of aging steel water mains in Toledo, Ohio. Includes submission of city forms and online Q&A. Due July 28, 2026.

    Opportunity details

    Solicitation No.
    10008808
    Type / RFx
    RFP
    Status
    Bidding
    Level
    city
    Published Date
    Due Date
    July 28, 2026
    NAICS Code
    237110AI guide
    Jurisdiction
    City of Toledo
    State
    Ohio
    Agency
    City of Toledo

    Description

    The Crosstown Water Main Route Study includes a comprehensive route selection and pipeline alignment study to establish a new corridor for replacement of approximately 3.5 miles of 1940's era 42-inch and 60-inch diameter steel water mains. Pre-Bid Meeting Information: No Online Q&A: Yes Location Information: Department: DPU/Engineering Services Address: One Lake Erie Center, 2nd FloorToledo, Ohio43604 County: Lucas Other Details: City forms must be filled out and attached to the bid. The required forms are as indicated in Exhibits D and E.

    Key dates

    1. July 28, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.