    CRP 5907 Alternative Alignment Study - Orting Valley East Corridor

    Issued by Pierce County
    countyRFQPierce CountySol. 263115
    Open · 7d remaining
    DAYS TO CLOSE
    7
    due Jun 10, 2026
    PUBLISHED
    May 13, 2026
    Posting date
    JURISDICTION
    Pierce County
    county
    NAICS CODE
    541330
    AI-classified industry

    AI Summary

    Pierce County seeks qualified firms for a corridor study of an alternative roadway alignment between South Hill and SR 162 to improve traffic flow and connectivity. Services include engineering, environmental, geotechnical, public involvement, and design. The contract is valued at $1M-$1.5M with potential federal funding.

    Opportunity details

    Solicitation No.
    263115
    Type / RFx
    RFQ
    Status
    open
    Level
    county
    Published Date
    May 13, 2026
    Due Date
    June 10, 2026
    NAICS Code
    541330AI guide
    Jurisdiction
    Pierce County
    Agency
    Pierce County

    Description

    Pierce County is soliciting Qualifications from firms interested in providing a complete corridor study for an alternative roadway alignment between South Hill and SR 162.  The preferred alternative, if constructed, will provide traffic congestion relief, create connectivity for integrated land use, and improve mobility for east-west traffic in this area of the County.  The project is currently funded with local County Road Funds, but federal funding is anticipated in the future.

    Background

    Pierce County Planning and Public Works, Office of the County Engineer, Pierce County (County) is requesting engineering, environmental, geotechnical, public involvement, and design services for the purpose of conducting an alternatives feasibility study of a new roadway alignment connecting the west side of the Orting Valley to SR 162.  The selected consultant will evaluate feasible corridor alternatives, identify environmental and engineering constraints, assess community and stakeholder considerations, and recommend a preferred alignment suitable for documentation in a programmatic State Environmental Policy Act (SEPA) Environmental Impact Statement (EIS).

    The County anticipates pursuing future federal funding for implementation of the recommended corridor. Accordingly, the consultant’s work may be required to follow the Federal Highway Administration (FHWA) Planning and Environmental Linkages (PEL) Framework and result in a PEL Study Report structured to support and streamline future National Environmental Policy Act (NEPA) review.

    Estimated value of initial contract is $1,000,000 to $1,500,000.

    The negotiated contract will be on a WSDOT Local Programs Cost Plus Fixed Fee.

     

     

     

     

    Project Details

    • Reference ID: 2026-RFQ-137
    • Department: Planning and Public Works
    • Department Head: Planning and Public Works (Director)

    Important Dates

    • Questions Due: 2026-06-04T22:30:00.000Z

    Evaluation Criteria

    • Submittal Presentation, Accuracy and Completeness of the Statement of Qualification (SOQ) (15 pts)
      • The information is presented in a clear, logical manner and is well-organized. 
      • Formatting and layout.
      • Spelling and grammatical accuracy.
      • Coherent and logical flow of written responses.
      • Completeness - All required information is provided.
    • Qualifications and Experience (30 pts)

      Describe the team’s general approach, methodology and goals for accomplishing the various services outlined in the Scope of Services section for providing the requested services. Approach should include information on:

      • General information for supporting the services at Pierce County as outlined in the Scope of Services.
      • How do the qualifications of the Firm and key individuals meet the needs of the County.
      • Innovative offerings and Service offered
      • Communication Plan: Describe the flow of information and project communications with team members, the County’s project manager, and various stakeholders.
      • Familiarity with WSDOT, FHWA, AASHTO, and MUTCD standards and established design guidelines,
      • QC/QA: Explain the Quality Control and Quality Assurance program for the requested services.
    • Capacity and Availability (15 pts)

      The firm has the size, resources, and commitment to provide timely services based on the County’s needs. Please outline your team organization for this account.

    • Approach to the Work (30 pts)

      The firm's approach to the services, Including:

      • Compliance with requirements
      • Innovative offerings
      • Planning, managing, and delivering the work
      • Managing staff, resources and project timelines 
      • Stakeholder coordination
      • Other related matters
    • References (10 pts)
      • Include a list of, at a minimum, five (5) recent contracts/projects in the last ten years, to include a point of contact, contact information (phone and email), and brief description, for services relevant to the items listed in the Scope of Services as performed by the team members. Only projects completed by team members of the project team will be considered. Supplemental project information may be included as part of the appendix.
    • Interviews (if applicable) (100 pts)

      Pierce County may interview the top ranked from the evaluation list. If interviews are conducted, rankings of the firms shall be determined by Pierce County using the combined results of interviews and proposal submittals

    Submission Requirements

    • Proposal (required)

      Upload Proposal

    • Project Description (required)

      Please provide a brief, one to two paragraph, description of the project.

    • Initial contract period:

      Please enter the initial contract period:

       

      EXAMPLE:

      The initial contract period is anticipated to be for 12 months. The County has the option of renewing for an additional four years after initial contract is executed. The actual schedule will be negotiated with the selected firm based on consultant and agency staff availability and finalized scope of work.

    • Renewal Options (required)

      Plese enter the renewal options for this project.

      EXAMPLE:

      The initial contract period is anticipated to be for 12 months. The County has the option of renewing for an additional four years after initial contract is executed. The actual schedule will be negotiated with the selected firm based on consultant and agency staff availability and finalized scope of work.

    • Do Federal Terms & Conditions Apply to this Project? (required)

    Key dates

    1. May 13, 2026Published
    2. June 10, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.