SLED Opportunity · CALIFORNIA · CITY OF MORGAN HILL

    East Dunne Sewer Upsize Project

    Issued by City of Morgan Hill
    cityPublic BidCity of Morgan HillSol. 209277
    Closed
    STATUS
    Closed
    due Mar 10, 2026
    PUBLISHED
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    The City of Morgan Hill seeks sealed bids for the East Dunne Sewer Upsize Project involving replacement of 1,700 linear feet of sanitary sewer main and related roadway work. Bids due by March 10, 2026.

    Opportunity details

    Solicitation No.
    209277
    Type / RFx
    Public Bid
    Status
    Active
    Level
    city
    Published Date
    Due Date
    March 10, 2026
    NAICS Code
    237110AI guide
    Agency
    City of Morgan Hill

    Description

    Bid Submission. The City of Morgan Hill (“City”), will accept sealed bids for its East Dunne Sewer Upsize Project (“Project”), by or before March 10, 2026, at 1:00 p.m., at its DEVELOPMENT SERVICES CENTER, located at 17575 PEAK AVENUE MORGAN HILL, California, at which time the bids will be publicly opened and read aloud. Project Information. Location and Description. The Project is located at East Dunne Avenue from Condit Road to Peppertree Drive Morgan Hill, CA 95037, and is described as follows: Removal and replacement of approximately 1,700 linear feet of existing 8” sanitary sewer main with new 10” SDR-26 PVC sanitary sewer main along East Dunne Avenue from approximately 90 feet east of Condit Road to Peppertree Drive. Furnish all labor, materials, equipment, fuel, tools, and transportation required to complete all work as shown on the Plans and Specifications, including, but not limited to: Removal of existing 8” sanitary sewer main and installation of new 10” SDR-26 PVC sanitary sewer main via open-trench method. Including sewer lateral reconnections, excavation, backfill, compaction, shoring, and trench restoration; Removal and replacement of sanitary sewer manholes as shown on the plans; Maintain sanitary sewer flows at all times for the project via temporary sewer bypass pumping system(s) and backup system(s) as required; Provide a 2” grind and overlay of the lane in which work is to be completed; Provide a Type II slurry seal on westbound side of East Dunne Avenue from raised median to existing curb; Restripe existing roadway in kind; and Complete all other incidental work related to the above items. Time for Final Completion. The Project must be fully completed within 90 calendar days from the start date set forth in the Notice to Proceed. City anticipates that the Work will begin on or about May 15, 2026, but the anticipated start date is provided solely for convenience and is neither certain nor binding. Estimated Cost. The estimated construction cost is $1,394,647. --- QUESTIONS AND ANSWERS --- Q: Hi Yat, Will you consider using polymer concrete on the manholes? A: No answer provided yet.

    Key dates

    1. March 10, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.