Active SLED Opportunity · MICHIGAN · GLEESON CONSTRUCTORS
AI Summary
Construction of a 44,029 sq ft two-story police and court building in Eastpointe, MI, including a gun range alternate. Scope covers demolition, concrete, masonry, metals, woodwork, roofing, doors, finishes, specialties, elevators, fire protection, plumbing, HVAC, electrical, site work, landscaping, and utilities.
Bidding Instructions: 1. Send all bids to estimating@gleesonconstructors.com. Uploading to buildingconnected.com is NOT necessary or encouraged. Please email your bids to us. 2. Project is Open Shop – Non-Prevailing Wage 3. RFIs are due 05/04/2026 4. Anticipated Award Date for GCs: TBD 5. Project Start – TBD Ground Up Construction of a 44,029 sq ft Two-Story Building with an Alternate for the Construction of a One Story 3,684 sq ft Gun Range SCOPE OF WORK CONSISTS OF: Division 01 General Requirements: Construction Waste Management and Disposal, Temporary Facilities and Controls, Temporary Utilities Division 2 Existing Conditions: Full Building Demolition (Includes Basement) Division 3 Concrete: Concrete Foundations, Concrete slab on grade Division 4 Masonry: CMU, Brick, Bond Beams Division 5 Metals : Structural Steel, Misc Steel, Handrails, Ladders, Guardrails, Screen Wall, Metal Stairs, Bollards, Roof Decking, Aluminum Canopies Division 6 Wood and Plastics: Cabinets and SS Countertops, Wood Benches, Cushions, Wood Trellis, Office furniture package by others Division 7 Thermal and Moisture Protection : Waterproofing, Insulation, Spray Foam Insulation, Joint Sealants, EPDM Roofing, Metal Roofing, Roof Hatch, Walk Pads, Snow Guards, Metal Panels Division 8 Doors and Windows: Wood Doors, HM Doors, FRP Doors, ADA operators, Door Hardware, OH Doors, Glass & Glazing, Curtainwall, Glass Handrails, AL Doors, Frames, Sidelites, and Hardware, and Metal Window Shutters Division 9 Finishes: Metal Framing, Gypsum Board, Tape, Float, and Sanding, In-wall FRT wood blocking, ACT, Carpet, LVT, Walk Off Mats, Wood Base, Floor and Wall Tile, Resilient Base, Epoxy Flooring, Sealed Concrete, Painting, Deck Spraying Division 10 Specialties: Toilet Accessories, Toilet Partitions, Signage, Fire Extinguishers & Cabinets Division 14 Conveying Equipment: Elevators Division 21 Fire Protection: Fire Sprinkler Systems Division 22 Plumbing: Water Piping, Gas Piping, Insulation, Water Heaters, Pumps, Valves, Cleanouts, Floor & Roof Drains, Plumbing Fixtures Division 23 HVAC: Make Up Air Units, RTUs, FCUs, VAVs Heat Pumps, Exhaust Fans, Hot Water Cabinet Unit & Unit Heaters, Grilles, Registers, Diffusers, Air Balancing, Range Hood, Electric Radiant Heaters, Hydronic Pumps, Boiler, and Chemical Pot Division 26 Electrical: Addressable Fire Alarm System, Access Control, Lighting, Specialty Lighting, Ceiling Fans, Floor Boxes, Switches, Outlets, Feeders, Rough In For Low Voltage, Generators Division 31 Site Work: Earthwork, Aggregate Base, Grading, Leveling Division 32 Exterior Improvements: Sidewalks, Concrete Pavement, Concrete Curb and Gutter, Asphalt Paving, Line Striping, Chainlink Fencing & Gates, Landscaping, and Irrigation Division 33 Site Utilities: Site Utilities, Sanitary Sewer, Domestic water mains, Fire Service, Natural Gas piping
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.