SLED Opportunity · COLORADO · CDOT CPCS & PROPERTY MANAGEMENT

    EJMT Preventative Maintenance, Repair, and Replacement Services

    Issued by CDOT CPCS & PROPERTY MANAGEMENT
    localIFBCDOT CPCS & PROPERTY MANAGEMENTSol. 8609741067
    Closed
    STATUS
    Closed
    due Apr 9, 2026
    PUBLISHED
    Mar 26, 2026
    Posting date
    JURISDICTION
    CDOT CPCS
    local
    NAICS CODE
    238220
    AI-classified industry

    AI Summary

    CDOT seeks bids for preventative maintenance, repair, and replacement services for the Eisenhower Memorial Johnson Tunnel Boiler System. The solicitation is an IFB with mandatory onsite visit and electronic bid submission. Key dates include a question deadline on April 3, 2026, and bid due date on April 9, 2026.

    Opportunity details

    Solicitation No.
    8609741067
    Type / RFx
    IFB
    Status
    Active
    Level
    local
    Published Date
    March 26, 2026
    Due Date
    April 9, 2026
    NAICS Code
    238220AI guide
    Agency
    CDOT CPCS & PROPERTY MANAGEMENT

    Description

    The Colorado Department of Transportation (CDOT) is conducting a competitive procurement to award a Services Agreement for preventative maintenance, repair, and replacement services for the Eisenhower Memorial Johnson Tunnel Boiler System. **Solicitation Type**: IFB - Invitation for Bid (Formal) **Source ID**: PU.AG.USA.2386.C22542701 **Piggyback Contract**: No **Question Acceptance Deadline**: 04/03/2026 04:00 PM EDT **Questions are submitted online**: Yes **Onsite Visit**: 04/21/2026 12:00 PM EDT **Bid Submission Type**: Electronic Bid Submission **Solicitation Number**: IFB 26-079 BP **Reference Number**: 0000418341 **Pricing**: In attached document **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | Yes | No | **Pre-Bidding Events**: Event TypeA - Latest Addendum: Onsite Visit | AttendanceA - Latest Addendum: Mandatory | Event dateA - Latest Addendum: 04/21/2026 12:00 PM EDT | LocationA - Latest Addendum: Eisenhower Johnson Memorial Tunnel 21410 I-70 Dillon, CO 80435 | Event NoteA - Latest Addendum: A Mandatory Pre-Bid meeting will be held in-person at the Eisenhower Johnson Memorial Tunnel on 04/21/2026 from 10:00am to 11:00am MST. **Questions and Answers**: - Q1 Arrow Right Question: Boiler Manufacturer Can you provide the manufacturer model number and serial number for all boilers? Answer: Answered in Addendum 1 03/27/2026 03:20 PM EDT 04/09/2026 03:10 PM EDT - Q2 Arrow Right Question: Boiler Specifications & OEM Data The Statement of Work references contractor compliance with OEM recommendations for service and repairs; however, the solicitation does not include equipment specifications sufficient to price this work accurately or confirm technical approach. Specifically, there are no details provided regarding boiler type, operating pressure, temperature ratings, steam or hot water output, manufacturer, model, etc. Without this information, offerors cannot determine applicable OEM service requirements, identify required certifications or licensing, or develop accurate and competitive pricing. We respectfully request that the agency provide complete equipment specifications for all boilers in scope, including manufacturer, model number, rated capacity, operating parameters, and OEM service manuals or equivalent documentation Answer: Answered in Addendum 1 03/30/2026 09:42 PM EDT 04/09/2026 03:10 PM EDT - Q3 Arrow Right Question: Site Visit We request that the agency arrange a pre-proposal site visit to inspect the boilers identified in the scope of work. A physical inspection is necessary to assess equipment condition, accessibility, and any site-specific factors that may affect the scope, approach, or pricing of maintenance and repair services. Answer: Answered in Addendum 1 03/30/2026 09:43 PM EDT 04/09/2026 03:10 PM EDT - Q4 Arrow Right Question: Request for Extended Response Period Given the technical complexity of this requirement and the need to conduct a site visit to assess equipment conditions prior to submission (see Site Visit Request), we respectfully request a two-week extension to the proposal due date. This additional time will allow offerors to develop thorough, accurate, and competitive proposals reflective of actual site conditions. Answer: Answered in Addendum 1 03/30/2026 09:45 PM EDT 04/09/2026 03:10 PM EDT - Q5 Arrow Right Question: General Questions Are you able to share any information on Make/Model/Serial numbers of the boilers listed in the RFP? Are there any confined spaces that would need to be entered in order to service the boilers? If there are materials that need to be disposed of, is there an area on-site or would we need to take them with us? Answer: Answered in Addendum 1 03/31/2026 05:05 PM EDT 04/09/2026 03:10 PM EDT - Q6 Arrow Right Question: Boilers. How many and what kinds? I am not seeing a quantity. What kind of Boilers, how many? Or are you just looking for our rates. I am not seeing a Boiler list. Answer: Answered in Addendum 1 04/02/2026 11:52 AM EDT 04/09/2026 03:10 PM EDT

    Key dates

    1. March 26, 2026Published
    2. April 9, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.