Active SLED Opportunity · FLORIDA · FLORIDA

    Electrical Infrastructure- Phase II

    Issued by Central Florida Tourism Oversight District
    stateInvitation to BidfloridaSol. ITB-15682
    Open · 6d remaining
    DAYS TO CLOSE
    6
    due Apr 30, 2026
    PUBLISHED
    Apr 16, 2026
    Posting date
    JURISDICTION
    florida
    state
    NAICS CODE
    238210
    AI-classified industry

    AI Summary

    Invitation to bid for Electrical Infrastructure Phase II in Florida by Central Florida Tourism Oversight District. Scope includes duct banks, conduits, manholes, fiber optic pull boxes, secondary conductors, and installation of SCADA equipment and transformers.

    Opportunity details

    Solicitation No.
    ITB-15682
    Type / RFx
    Invitation to Bid
    Status
    OPEN
    Level
    state
    Published Date
    April 16, 2026
    Due Date
    April 30, 2026
    NAICS Code
    238210AI guide
    Jurisdiction
    florida
    State
    florida
    Agency
    Central Florida Tourism Oversight District

    Description

    We are pleased to invite you to participate on Bid #C007067 Electrical Infrastructure- Phase II. The following link is to our new bidding platform, hosted by PlanetBids™, where you can find the bid documents: BID LINK HERE 

    A non-mandatory site visit will be conducted on Thursday, April 23, 2026 at 10:00 A.M. Meeting location for the site visit is at the following address: 

    Large Maintenance Conference Room 

    5300 N. Center Drive, Lake Buena Vista, Florida 32830.

    All attendees must RSVP through PlanetBids™ to attend the Mandatory Site Visit. For all those who are attending the non-mandatory pre-bid meeting, please remember to bring/wear closed-toed shoes, pants, hard hat, safety vest, and eye and ear protection. 
     

    The Central Florida Tourism Oversight District (herein after “District”, “Owner” and “CFTOD”) is a Special Taxing District that serves as a local government entity.

    The scope of this project includes but is not limited to: 
    • providing concrete encased duct bank
    • direct buried conduits
    • concrete manholes
    • fiber optic pull boxes 
    • 600V, THWN secondary conductors 
    • installing Owner-furnished SCADA equipment, transformers, switches, 15kV Cable, 15kV cable splices, cable terminations, and air terminal compartments

    Key dates

    1. April 16, 2026Published
    2. April 30, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.