Active SLED Opportunity · TEXAS · CITY OF GRANBURY

    Electrical materials and installation of infrastructure for the Paluxy River Children’s Advocacy Center

    Issued by City of Granbury
    cityRFPCity of GranburySol. 257868
    Open · 11d remaining
    DAYS TO CLOSE
    11
    due May 5, 2026
    PUBLISHED
    Apr 20, 2026
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    238210
    AI-classified industry

    AI Summary

    City of Granbury requests proposals from qualified electrical contractors for underground and overhead electrical distribution system construction at Paluxy River Children9s Advocacy Center. Scope includes installation of poles, conduit, transformer, and related equipment. Proposals due by May 5, 2026.

    Opportunity details

    Solicitation No.
    257868
    Type / RFx
    RFP
    Status
    open
    Level
    city
    Published Date
    April 20, 2026
    Due Date
    May 5, 2026
    NAICS Code
    238210AI guide
    Jurisdiction
    City of Granbury
    State
    Texas
    Agency
    City of Granbury

    Description

    The City of Granbury is requesting proposals from qualified electrical contractors to furnish all labor, materials, equipment, supervision, and incidentals necessary for the construction of a new Underground Electrical Distribution System. The project includes the installation of a single‑phase overhead primary extension along the property perimeter, leading to a riser pole configured as a radial feed. From this point, the contractor will construct a new underground primary system that terminates at a new 50 kVA, 120/240 V single‑phase padmount transformer (T1) and a single‑phase sectionalizing cabinet (S1).

    The scope of work includes installing new overhead and underground primary facilities; setting new poles and associated hardware; constructing the riser assembly; installing conduit, cable, transformer pads, ground sleeves, and related equipment; performing all grounding and terminations; and removing and replacing designated overhead line segments, poles, and appurtenances. All work must be completed in accordance with the issued plans, construction standards, and all applicable codes and City of Granbury requirements.

    Background

    Location

    SE‑805 Lipan St, Granbury, TX (PO 102355). Work limits and equipment locations are shown on sheets E1–E2

    Project Details

    • Reference ID: 25-26-20
    • Department: Public Works (01-43, 02-70, 02-78, 02-79, 02-80, 02-82, 02-83, 02-85, 02-93)
    • Department Head: Chester Nolen (Public Works Director)

    Important Dates

    • Questions Due: 2026-04-24T15:00:00.000Z
    • Answers Posted By: 2026-04-27T15:00:00.000Z

    Evaluation Criteria

    • Pricing – 50% (50 pts)
      • Total lump‑sum price for complete construction per the IFC drawings and specifications.
      • Competitiveness and reasonableness of unit prices (conduit, cable, poles, assemblies, restoration, and alternates).
      • Clarity and completeness of the cost breakdown.
      • Consideration of field‑verified quantities, adders, and allowances.
    • Contractor Qualifications & Relevant Experience - 10% (10 pts)
      • Experience performing similar distribution work, including overhead primary, URD primary, riser installations, sectionalizing cabinets, transformer installations, and trench construction.
      • Demonstrated competency with NESC compliance, sag/tension work, and utility‑grade URD installation.
      • Qualifications and certifications of key personnel and subcontractors.
      • Safety record, EMR, and OSHA compliance.
    • Schedule & Capacity to Perform – 20% (20 pts)
      • Ability to meet or exceed the City’s desired construction timeline.
      • Availability of equipment, crews, and materials.
      • Proposed schedule detail (mobilization, removals, overhead work, trenching, URD installation, S1/T1 installation, testing, energization, restoration).
      • Demonstrated capacity to complete work without delays or resource conflicts.
    • Past Experience With the City of Granbury – 20% (20 pts)
      • Experience performing similar distribution work, including overhead primary, URD primary, riser installations, sectionalizing cabinets, transformer installations, and trench construction.
      • Demonstrated competency with NESC compliance, sag/tension work, and utility‑grade URD installation.
      • Qualifications and certifications of key personnel and subcontractors.
      • Safety record, EMR, and OSHA compliance.

    Submission Requirements

    • Technical Proposal (without Cost Proposal) (required)

      Please Upload your Technical Proposal here. Upload fee proposal separately in the next step.

    • Separate Cost Proposal (required)

      Confirm that your fee proposal is not attached in your Proposal and is attached separately here.

    • Bid Bond (required)

      Will this solicitation require a bid bond?

    • Electronic Pricing Table (required)

      Would you like to have bidders respond to an electronic pricing table through the city's eProcurement Portal?

      Some examples of of when to say "yes":

      1. This is a quote for goods or commodities
      2. This is a public works bid, with a pricing table that can be uploaded into ProcureNow from an excel spreadsheet
      3. Seeking services for hourly rate schedules
    • Proposal response (required)

      Select one option detailing how you would like to receive proposal responses.

    • Evaluation Committee? (required)

      Will there be an evaluation committee to review the proposals and score them based on weights and multiple criteria?

    Key dates

    1. April 20, 2026Published
    2. May 5, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.