SLED Opportunity · CALIFORNIA · CITY AND COUNTY OF SAN FRANCISCO

    EXT MOH | 101 Gough Rehab – Solar System DB

    Issued by City and County of San Francisco
    cityRFPCity and County of San FranciscoSol. SFGOV-0000011417
    Closed
    STATUS
    Closed
    due Feb 13, 2026
    PUBLISHED
    Posting date
    JURISDICTION
    City and
    city
    NAICS CODE
    238220
    AI-classified industry

    AI Summary

    San Francisco Safehouse seeks subcontractors to design and install a 30kW rooftop solar photovoltaic system at 101 Gough St. The project requires licensed, bonded subcontractors and includes prevailing wage and local hiring requirements. Bids due by February 12, 2026.

    Opportunity details

    Solicitation No.
    SFGOV-0000011417
    Type / RFx
    RFP
    Status
    Active
    Level
    city
    Published Date
    Due Date
    February 13, 2026
    NAICS Code
    238220AI guide
    Agency
    City and County of San Francisco

    Description

    San Francisco Safehouse (SFSH or Sponsor) has selected AmOne Corporation as the General Contractor for the project at 101 Gough St. The project will have partial funding from the San Francisco Mayor’s Office of Housing and Community Development (MOHCD) and will have additional hiring and wage requirements which will be provided as an exhibit to this RFP. The purpose of this invitation is to identify and engage with subcontractors who have the experience and staff to both design and perform the installation of a 30kW peak DC solar photo voltaic system. Subcontractor responding to this invitation to bid should be bonded and insured with necessary licenses to perform the design and installation of the solar photovoltaic system. Subcontractor will be responsible for provided system design services, labor and materials for the designed system, securing necessary permits, coordinating connection with local utilities, and assist project sponsor in completing any solar contractor obligations for energy efficiency rebates such as but not limited to LIWP, BAYREN, TECH, and etc. Proposed Scope of work 1. Design and install 30kW peak Photo Voltaic Roof Top system 2. Submit MOHCD, Public works, CA DIR compliance forms 3. Provide and submit drawings for permitting PROJECT LOCATION: 101 Gough Street, San Francisco, CA 94102 PROJECT DESCRIPTION: Design and install new solar system components to meet standard code requirement. Coordinate with Architect for solar equipment and panel location and coordinate with Owner to obtain LIWP rebate. Construction Start in April 2026 LABOR WAGE REQUIREMENTS AND MONITORING: Project is subject to prevailing wage requirement. Prevailing wage determination: TBD SUBCONTRACTING & LOCAL HIRING REQUIREMENTS: Project is subject to 20% LBE and first source hiring. BID DOCUMENTS: Please use the link below to access bid documents: https://amonecorp-my.sharepoint.com/:f:/p/eric/IgAZZItPCK1URLbcIYRn7xuHAS3gueKxsD0BPxVaQA4cRB4?e=zguUni BID DUE: Friday, 2/12/2026 at 5pm CONTACT: For any questions regarding for this project, please contact AmOne Estimating at estimates@amonecorp.com. . . .

    Key dates

    1. February 13, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.