Greenwood County seeks proposals from qualified firms to conduct a FERC-compliant Comprehensive Assessment of the Buzzards Roost Hydroelectric Project, including inspection, reporting, and corrective planning, with key deliverables and milestones through December 2027.
Greenwood County (“Owner”) is requesting proposals from qualified firms to complete a Comprehensive Assessment of the Buzzards Roost Hydroelectric Project.
The Part 12D Report requires the following key components and deliverables:
The engineering support for the Comprehensive Assessment shall be a time and materials, not-to-exceed fee. Provide estimated fees for each of the Project tasks. Also, provide the hourly billing rate for Project staff.
The firms proposed timeline to complete the following required tasks with bolded milestones:
| Milestone | Schedule |
| Initial Site Visit | Firm Proposed |
| Submit Part 12D Inspection Plan (IP) to Owner | Firm Proposed |
| Final Part 12D Inspection Plan (IP) to FERC | January 15, 2027 |
| Submit PIPR to Owner | Firm Proposed |
| Final PIPR to FERC | May 1, 2027 |
| PFMA Workshop | Firm Proposed |
| L2RA Workshop | Firm Proposed |
| Submit CA Report to Owner | Firm Proposed |
| Final CA Report to FERC | December 1, 2027 |
| CA Review Meeting | Firm Proposed |
Information gathered from three provided references for which the contractor has performed similar work in the past three years.
Upload your cover sheet here.
Please download the below documents, complete, and upload.
Upload your Experience of your Firm here.
Upload proposal addressing the time and materials, not-to-exceed fee for each project task. Include hourly billing rate for all project staff
Upload your References here.
Upload a copy of your Certificate(s) of Insurance here.
Upload a copy of evidence of your capacity to provide bonding in the amount of your proposed price (e.g. a letter from your Surety agent stating that one or more Sureties will issue bonds in the amount of your proposed price if your team is selected) and a copy of the firm’s certificate of insurance, showing the firm’s current limits of commercial general liability, employer’s liability, business automobile liability and professional liability.
Upload a copy of your Bid Bond, certified check, or bank cashier’s check for not less than five percent (5%) of the base proposal.
Upload your seperate Price Proposal here.
By submitting a Bid, the Bidder certifies that, if awarded a contract, the Bidder will comply with all applicable provisions of The Drug-free Workplace Act, Title 44, Chapter 107 of the South Carolina Code of Laws, as amended.
You agree to hold your Bid open for a minimum of ninety (90) calendar days after the Opening Date. You agree that your bid can be made public under the Freedom of Information Act, 5 U.S.C § 552. Greenwood County reserves the right to reject any and all bids, and to waive any informalities or irregularities.
List your COA Number here.
Firm will be disqualified if firm does not possess a valid and current South Carolina Contractor’s license for the project.
The Company certifies that:
Select how you want Vendors to provide their pricing.
Pick a Pre-Bid Meeting option below.
Do you require a Bid Bond for this project?
Do you want the vendor to complete the Bid Holding & Authorization form?
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.