SLED Opportunity · CALIFORNIA · LOS ANGELES
AI Summary
Construction of a 1.7-acre underground infiltration gallery and storm drain modifications at Fernangeles Park to capture and infiltrate stormwater runoff, including related demolition, reconstruction, landscaping, and traffic control.
Construct a 1.7-acre underground infiltration gallery at Fernangeles Park & modify nearby storm drains serving a 317-acre tributary area with an estimated yield up to 202 AFY of stormwater runoff, in order to divert their flows to this facility & the green street along Allegheny St between Laurel Cyn Blvd & Remick Ave, where the water will be infiltrated into the subsoil. Best Management Practices (BMPs) strategically located throughout the park & along Allegheny St will capture & store stormwater runoffs ♦Install: ♦♦ 3 catch basin inlets ♦♦ pipes ♦♦ diversion structures ♦♦ desilting basins ♦♦ hydrodynamic separators ♦♦ devices to control & measure flows ♦Also: ♦♦ Demo, excavation & reconstruction of streets, sidewalks, curbs & gutters in City ROW ♦♦ Demo, excavation & construction within park ♦♦ Construction to restore park facilities (including sports fields) & landscaping afterwards, and additional improvements ♦♦ Educational signage ♦♦ Tree work ♦♦ Traffic control ▬ ● See bid package for full scope & details ●● Bid package only on RAMPLA- download Part 1 to be a planholder ● For planholders lists & bid results visit: http://engineering.lacity.gov/contractors/
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.