Active SLED Opportunity · CALIFORNIA · TOWN OF LOS GATOS

    Fire Sprinkler System Inspection & Maintenance

    Issued by Town of Los Gatos
    localRFPTown of Los GatosSol. 245702
    Open · 5d remaining
    DAYS TO CLOSE
    5
    due Apr 28, 2026
    PUBLISHED
    Apr 15, 2026
    Posting date
    JURISDICTION
    Town of
    local
    NAICS CODE
    238220
    AI-classified industry

    AI Summary

    RFP for quarterly, annual, and five-year inspection, maintenance, and certification of fire sprinkler systems for Town of Los Gatos properties. Includes compliance with NFPA 25 standards and detailed reporting. Pre-proposal meeting on April 22, 2026. Proposals due April 28, 2026.

    Opportunity details

    Solicitation No.
    245702
    Type / RFx
    RFP
    Status
    open
    Level
    local
    Published Date
    April 15, 2026
    Due Date
    April 28, 2026
    NAICS Code
    238220AI guide
    Jurisdiction
    Town of Los Gatos
    Agency
    Town of Los Gatos

    Description

    Provide Quarterly, Annual, and Five Year, Inspections, Maintenance, and Certification

    For all town owned property Fire Suppression systems.

    Sprinkler System Type: Wet / Dry / Pre-Action, Clean Agent.

    To provide inspection, testing, and maintenance of the fire sprinkler system in accordance with NFPA 25 requirements, including:

     

    Quarterly Inspections

    • Inspect alarm valves and gauges
    • Inspect sprinkler heads for damage, corrosion
    • Inspect pressure gauges
    • Inspect fire department connections
    • Inspect water flow alarm devices
    • Inspect risers and piping
    • Inspect spare sprinkler cabinets
    • Written inspection reports for compliance and insurance purposes

     

    Annual Inspections

    • Annual sprinkler system inspection and testing
    • Waterflow and tamper switch testing
    • Main drain and inspector’s test
    • Control valve inspection
    • Identification and documentation of deficiencies
    • Written inspection reports for compliance and insurance purposes

     

    Five-Year Inspection and Testing

    Five-year inspections in accordance with NFPA standards:

     

    • Internal inspection of piping for obstruction or corrosion
    • Standpipe system flow testing (if applicable)
    • Fire department connection inspection
    • Check valves internal inspection
    • Gauges testing or replacement
    • Sprinkler head sample testing (if required)
    • Hydrostatic testing where applicable

    Deliverables:

    • Five-year compliance certification
    • Detailed inspection report
    • Recommendations for repairs or upgrades

     

    Project Details

    • Department: Parks and Public Works
    • Department Head: Nicolle Burnham (Parks and Public Works Director)

    Important Dates

    • Questions Due: 2026-04-24T22:00:00.000Z
    • Answers Posted By: 2026-04-28T22:00:00.000Z
    • Pre-Proposal Meeting: 2026-04-22T17:00:00.000Z — 110 E. Main St. Los Gatos Ca. 95030

    Addenda

    • Addendum #1 (released 2026-04-16T23:07:38.044Z) —

      Please use the See What Changed link to view all the changes made by this addendum.

    • Official Notice #1: Question Response date and new Response Submission deadline added (released 2026-04-16T22:51:28.202Z) —
      1. Question response date added 4/28/26 @ 3pm
      2. Response Submission Deadline extended to 5/5/26 @ 5 pm

    Evaluation Criteria

    • Responsiveness (100 pts)
    • Cover Letter (5 pts)
    • Scope of Services / Work Plan (30 pts)

      Using information in Scope of Work as the basis for work.

    • Hourly Rates (35 pts)
    • References (10 pts)
    • Regulatory Experience (19 pts)

      Knowledge and adherence to industry standards and required codes

    Submission Requirements

    • Formation date of company (required)

      Please enter Month and Year.

    • Number of years providing the specified services (required)
    • Please list names and titles of all officers and directors. If an individual or partnership, please list names and addresses of all partners, indicating whether they are general or limited partners. (required)
    • Indicate whether Proposer has ever failed to complete any Agreement awarded to it. If so, note when, where, and why. Attach additional sheets, if necessary. (required)
    • Indicate whether Proposer has been or is the subject of a bankruptcy or insolvency proceeding or subject to assignment for the benefit of creditors. (required)
    • Required Documents (required)

      Please upload the following documents related to the proposal:

      • Cover letter describing how the Proposer can meet the needs of the Town and stating deviations or exceptions if any.
      • Scope of Services using information in Scope of Work as the basis for work.
      • Hourly rates for staff assigned to the Project,
      • Relevant experience and expertise of the firm, particularly expertise in biological monitoring on federally funded projects.
      • Identification of the project team, including the main project contact.
      • Resumes for the project team identifying relevant experience.
      • Other relevant information to assist the Town in its selection.
    • List of Subcontractors (required)

      Please download the below documents, complete, and upload.

    • References (required)

      Please download the below documents, complete, and upload.

    • Affirmations and Certification (required)

      RESERVATION

      It is understood that the Town reserves the right to reject this Proposal, but that this Proposal shall not be withdrawn for a period of 45 days from the date prescribed for its opening.

      DISCLOSURE

      The undersigned declares that this Proposal is not made in the interest of or on behalf of any undisclosed person, partnership, company, association, organization or corporation; that the Proposal is genuine and not collusive or sham; that the undersigned has not directly or indirectly induced or solicited any other Proposer to put in a false or sham Proposal and has not directly or indirectly colluded or agreed with any Proposer or anyone else to put in a sham Proposal or to refrain from bidding; that the undersigned has not directly or indirectly sought by agreement, communication or conference with anyone to fix his/her Proposal price or the Proposal price of any other Proposer, or to fix any overhead, profit or cost element of such Proposal price or of that of any other Proposer, or to secure any advantage against the Town of Los Gatos or anyone interested in the proposed Contract; that the only persons or parties interested in this Proposal as principals are those named herein; that all statements contained in this Proposal are true; that the undersigned has not directly or indirectly, submitted his/her Proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any other persons, partnership, corporation, or association except to such person or persons as have a direct financial interest in Proposer’s general business; and that the undersigned has not accepted any Proposal from any subcontractor or vendor through any Proposal depository, the Bylaws, Rules or Regulations of which prohibit or prevent the undersigned from considering any Proposal from any subcontractor or vendor, which is not processed through said Proposal depository, or which may prevent any subcontractor or vendor from bidding to any general contractor who does not use the facilities of or accept bids from or through such Proposal depository; and that the undersigned has not paid, and will not pay, any fee to any corporation, partnership, company, association, organization, Proposal depository, or to any member or agent thereof to effectuate a collusive or sham Proposal.

      WORDS AND PHRASES           

      Wherever in this Proposal an amount is stated in both words and figures, in case of discrepancy between words and figures, the words shall prevail; if all or any portion of the Proposal is required to be given in unit prices and totals and a discrepancy exists between any such unit prices and totals so given, the unit prices shall prevail.

      CERTIFICATION

      The Proposer certifies that the Proposal Documents have been thoroughly read and understood and that, except as may be specifically noted and contained in addenda, there are no discrepancies or misunderstandings as to the meaning, purpose or intent of any provision in the Proposal Documents or as to the interpretation of the same. The undersigned hereby incorporates by reference, the same as though set out in full, all provisions of Request for Bids published by the Town and pertaining to the work described in this Proposal.

      By confirming below, the submission of a Proposal shall be deemed a representation and certification by the Proposer that they have investigated all aspects of the RFP, that they are aware of the applicable facts pertaining to the RFP process, its procedures and requirements, and they have read and understand the RFP. No request for modification of the Proposal shall be considered after its submission on the grounds that the Proposer was not fully informed as to any fact or condition.

    • Will there be a Pre-proposal Conference and Site Tour? (required)
    • Is the attendance at Pre-Proposal Conference and Site Tour Mandatory? (required)
    • Does the RFP require specific and/or special qualifications? (required)
    • Please list the qualification requirements here (required)
    • Initial Term of the Agreement resulting from this RFP? (required)

      Please select one

    • Does this contract/project meet prevailing wage requirements? (required)

      Prevailing Wage
      Prevailing wage applies to all projects in which more than $1,000 of public funds is used for:

      • Construction
      • Repair
      • Maintenance
      • Demolition
      • Emergency work

      DIR’s Contractor definition

      • Contractors
      • Subcontractors
      • Surveyors and Inspectors
      • Material Testing
      • Trucking
      • Employment services

      Any for whom prevailing wages have to be paid (not just contractors with CSLB)

      Contractors must be registered at TIME OF BID (including all subcontractors) except if exempt. If not, the Town may:

      • Reject the bid as non-responsive; or,
      • Provide notice to the prime contractor and allow 24 hours to “cure”. Offending contractor will pay a $2,000 penalty for registering after bid date.

      DIR Registered Contractors Exemption
      Small project exemption means that contractors who work exclusively on small projects are not required to register as public works contractors or file electronic certified payroll reports for those projects.  However, prevailing wages must still be paid, and contractors are required to maintain certified payroll records on a continuous basis.
      Small project exemption applies for all public works projects that do not exceed:

      • $25,000 for new construction, alteration, installation, demolition or repair
      • $15,000 for maintenance 
    • Agreement beginning Month and Year (required)

      Please enter in following format: Month 4-digit year

    • Will there be option to renew the agreement beyond the initial term? (required)
    • Options to renew the Agreement for up to how many additional one-year terms? (required)
    • Is this project funded by Federal Grant? (required)

    Key dates

    1. April 15, 2026Published
    2. April 28, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.