SLED Opportunity · CALIFORNIA · CITY OF ROSEVILLE
AI Summary
City of Roseville requests proposals for design, procurement, and installation of a pre-engineered metal canopy including structural steel, roofing, lighting, and concrete footings. Compliance with 2025 California Building Code required. Mandatory job walk on January 28, 2026.
The City of Roseville is soliciting proposals from qualified contractors for the design, procurement, and installation of a pre-engineered metal canopy. The scope includes all necessary elements to provide complete and functional canopy systems. Components include, but are not limited to: • Structural steel primary and secondary members • Purlins, girts, column base plates, and anchor bolts • Metal roofing systems • Trim, flashing, gutters, and downspouts • Lighting (explosion proof), sealants, coatings, and galvanizing • Reinforced concrete footings, piers, or grade-beams, as necessary • All associated accessories required for a complete installation --- QUESTIONS AND ANSWERS --- Q: The project documents say the Mandatory Job Walk is on "...Tuesday, January 28th 2026 ..." Tuesday is January 27th The 28th is Wedensday Please confirm correct Day and Date A: Yes, the job walk is scheduled for Wednesday the 28th sorry for the confusion. Q: The PEMB spec calls for the primary and secondary steel to be both galvanized and painted. Are you wanting the steel to be galvanized and then painted from the manufacturer? Just galvanized? Just painted? Page 61 of 64. A: For this project primary and secondary steel shall be painted with a rust inhibitive alkyd primer and an alkyd enamel finish coat. Q: You have a section in the PEMB spec for wall panels, but the scope of services calls for a pre-engineered metal canopy with no walls. Do you want walls or no walls? A: No walls on this project Q: PEMB spec makes reference in section 1.01.B to roof curbs and flashings for pipe and cable tray penetrations, curbs and flashing at louvers, etc. What exactly are you thinking is going to be on the roof and why would we need louvers if the building is a roof canopy with no walls? A: N/A Nothing will be placed on roof Q: PEMB spec calls for code to be 2016 building code. As far as we know all jurisdictions are working off a later version of the code. Please confirm to design to 2016 building code or current code version in use by the governing jurisdiction. A: Code reference will be California building code 2025 Q: Please clarify the requirement for meeting climate design temperatures. A: California building code category 11 for climate design and D for seismic Q: Please provide the soils report from Blackburn Consulting which is referenced. Also please confirm if the City will accept the soils report as current if the date is over 6 months old or if a new soils report is needed. A: Report has been attached 01-23-2026 Q: Please provide the conceptual sketched (Attachment K) called out under task 2. A: No answer provided yet. Q: Please provide any as-built drawings showing existing site power locations for tie-in to the existing site power and lighting controls as called for in task 5. A: Posted in attachment Q: Please confirm that City will pay all permit fees directly and no permit fees are required to be carried by the Contractor. A: City will pay for fees but contractor will submit permits with a reference code for payment Q: Please confirm steel erector does not required AISC certification. A: Only if the manufacture calls for it in the written instructions 3.01 PREPARATION A. Prior to performing work of this section, verify that work of other trades, as applicable, is complete for commencement of installation. B. Obtain manufacturer's written instructions before commencing erection or installation. 3.02 ERECTION A. Erect the work in accordance with Specifications, Drawings, and manufacturer's directions. B. Conform to configurations and connections indicated on reviewed and accepted shop and erection drawings. C. Accurately position and assemble structural framing to lines and members of framing system prior to permanent fastening. D. Erector shall not make any field modifications to any structural member except as authorized and/or specified by manufacturer in writing, with a copy to the Owner. E. Approved Field Modification: Perform in manner not to impair appearance, weather tightness, or structural quality of material or structure. Q: Please clarify reference to field-applied coatings. Are you looking for all steel to be finish painted in the field? A: Coatings can be applied off-site with touch up preformed on-site Q: On the job walk the City indicated all framing should be painted. The spec. book calls for secondary framing to be pre-galvanized. Do the primary framing members only need the paint? A: No answer provided yet. Q: Does the City want a single slope 31' x 53' building, or a gable roof 31' x 53' building? A: No answer provided yet. Q: Which side(s) would the City like gutters/downspouts on? A: No answer provided yet. Q: Is Rod X bracing allowed between the columns, or shall the contractor use portal frame braces only? A: No answer provided yet. Q: What is the dry film paint thickness the City requires on frame painting? A: No answer provided yet. Q: For the (3) cameras and the high voltage runs, will the contractor be able to use all existing underground conduits and pull boxes? A: No answer provided yet. Q: Can the contractor mount your explosion proof lights under the canopy, instead of on 5" square aluminum poles? A: No answer provided yet. Q: Is the canopy owner furnished? A: No answer provided yet. Q: Does this job require ICC Certification? A: No answer provided yet. Q: Is the framing going to be galvanized or painted? A: No answer provided yet. Q: Is the canopy color picked out? Will we match nearby structures? A: No answer provided yet. Q: Are we removing the light poles? A: No answer provided yet. Q: Are there As-Built drawings for the underground piping? A: No answer provided yet.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.