Active SLED Opportunity · COLORADO · EAST LARIMER COUNTY WATER DISTRICT
AI Summary
East Larimer County Water District seeks contractors for rehabilitation or replacement of 2,500 feet of 24-inch water transmission main in Fort Collins, CO. The project includes pipeline replacement, valve installation, testing, disinfection, and restoration to meet AWWA standards and ensure 100 years of service life. Mandatory pre-proposal conference on July 9, 2026.
The East Larimer County Water District (ELCO) is requesting qualified contractors submit proposals (Proposal(s)) for the rehabilitation or replacement of approximately 2,500 Linear Feet of a 24-inch transmission main (Pipeline) generally located approximately 3,350 feet west of College Avenue along Hickory Street in Fort Collins, CO (Project). The Project is intended to... **Project Type**: RFP - Request for Proposal (Formal) **Source ID**: PU.AG.USA.2590002.C21080201 **Piggyback Contract**: No **Question Acceptance Deadline**: 07/24/2026 02:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Additional Bidding Instructions**: Refer to RFP. **Owner Organization**: East Larimer County Water District (ELCO) **Reference Number**: 0000428818 **Pricing**: In attached document **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | Yes | No | **Pre-Bidding Events**: Event: Prebid Conference | Date: 07/09/2026 03:30 PM EDT | Location: East Larimer County Water District Headquarters, 232 S. Link Lane, Fort Collins, CO 80524 | Mandatory: True **Addendums**: | Addendum | Date | Note | |---|---|---| | Addendum No. 1 | 07/14/2026 03:55 PM EDT | | | Addendum No. 2 | 07/21/2026 06:20 PM EDT | | | Addendum No. 3 | 07/27/2026 06:17 PM EDT | | | Addendum No. 4 | 07/31/2026 04:56 PM EDT | | **Communications**: - Communication No.9: On the RFP, first sentence of the first bullet on page 7, and on Addendum 3, A12, top of page 4, delete "DR25" and change to the following: Any new open-cut installed pipe to be PVC per AWWA C900 DR18 or DIP per AWWA C150 200 psi pressure class. - Communication No.8: More groundwater measurement data, through 7/23/2026, that correspond with the six (6) sites in CTL's Groundwater Investigation Report from July 17, 2026. Gradation plots that correspond with CTL’s GW Investigation Report from July 17, 2026. — Groundwater Monitoring Data thru 7-23-26.pdf - Communication No.8: More groundwater measurement data, through 7/23/2026, that correspond with the six (6) sites in CTL's Groundwater Investigation Report from July 17, 2026. Gradation plots that correspond with CTL’s GW Investigation Report from July 17, 2026. — CTL GW Investigation Gradation Plots.pdf - Communication No.7: A geotechnical subsurface report based upon six (6) recent bore sites located within the Project corridor is now complete and currently under ELCO's review (CTL Thompson Inc., July 17, 2026). — ELCO Hickory Street Waterline GW INVESTIGATION FC11972.000-112-L1-Signed.pdf - Communication No.6: ELCO’s latest version of standard construction detail drawings that include air relief / vacuum valve and blowoff assemblies. — ELCO Standard Details.pdf - Communication No.5: Agenda from the mandatory Pre-Proposal Meeting that occured on 7/9/2026. — ELCO Hickory 24-Inch Agenda 7-9-2026.pdf - Communication No.4: Attendance sign-in sheet from the Pre-Proposal Meeting that occurred on 7/9/26. — ELCO Hickory 24-Inch PreProposal Attendance.pdf - Communication No.3: ELCO is finalizing a geotechnical subsurface report based on six (6) bore sites located within the Project corridor. That report will be made available upon its completion. For now, ELCO is making groundwater level monitoring data available thus far on each of these sites. Please see attached spreadsheet, first sheet shows the data, second sheet provides a figure of the locations of these wells. — Groundwater Monitoring Data 7-9-26.xlsx - Communication No.2: A Geotechnical Report from ELCO’s parallel 42-inch NEWT Pipeline has been made available (Ground Engineering Consultants, May 2007). Refer to red markups for sections relevant to the Hickory 24-inch rehab corridor. — Geotech Report NEWT Pipeline.pdf - Communication No.1: For the Pre-Proposal Meeting (7/9/26, 1:30PM MDT), please park in ELCO's adjacent yard, entrance at 1605 E. Lincoln Avenue, Fort Collins, CO., 80524 (peach-colored building). Then a short walk to ELCO's office building, south entrance, near outdoor patio. Refer to attached figure (park in areas shaded green). — Pre-Proposal Meeting - PARKING.pdf
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.