SLED Opportunity · OHIO · STRAND ASSOCIATES
AI Summary
Construction project for installation and replacement of sanitary sewer and water infrastructure in Circleville, Ohio. Includes gravity sewer, grinder pumps, water main replacement, and restoration. Bids due July 31, 2026.
The Project includes the following Work: Installation of new gravity sanitary sewer, gravity sanitary sewer replacement, installation or replacement of gravity sewer service connections, grinder pumps, pressure sewer, water main replacement, water service replacements including private side water service replacements, and associated restoration. The Bid must be accompanied by Bid Guaranty and Contract Bond for the full amount of the Bid or Bid security made payable to OWNER in an amount of 10% of the Bidder’s maximum Bid price. CONTRACTOR shall pay wages to each laborer and mechanic at a rate not less than the higher of the minimum wages specified in the current wage determination as published by the State of Ohio Department of Commerce or the provisions of the Davis-Bacon Act. Any Contract or Contracts to be awarded are expected to be funded with assistance from the Ohio Division of Environmental and Financial Assistance Water Pollution Control Loan Fund (WPCLF) and is subject to all applicable State and Federal laws and regulations. Disadvantaged Business Enterprises (DBEs), including small, minority, and women owned businesses, are encouraged to submit Bids for this Project. This procurement is subject to the EPA policy of encouraging the participation of small business in rural areas (SBRAs). Bidders must demonstrate positive efforts to utilize DBEs. Failure to comply could result in disqualification of Bidder and termination of financial assistance or other sanctions. The successful Bidder will be required to conform to the wage requirements prescribed by the federal Davis Bacon and Related Acts. All iron, steel, manufactured products, and construction materials shall be produced in the United States and comply with the Build America, Buy America Act requirements. OWNER reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 110 days after the time set for receiving Bids. Contract award shall be made based on the lowest responsive and responsible Bidder. The Strand Associates, Inc.® project manager is Tyler C. Burton and can be contacted at Strand Associates, Inc.®, 500 Neil Avenue, Suite 110, Columbus, OH 43215, (614) 835 0460 regarding the Project. For all further requirements regarding Bid submittal, qualifications, procedures, and Contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Category: Sanitary Sewer (Gravity), Sewer and Water Construction, Water Main (Repair/Replace) Rehabilitation, Waterlines, Water Infrastructure (Water Meters). Pre-Bid Meeting: None Bid Submission: Electronic Bids for the construction of the Project will be received by OWNER until July 31, 2026, at 10 A.M., local time. At that time the Bids received will be publicly downloaded and read aloud via teleconference. The login information for the teleconference is as follows: (309) 205-3325, Conference ID 912 6799 9965. Bid documents are available for purchase through QuestCDN. Contact us and we will obtain the full document package on your behalf.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.