Active SLED Opportunity · ALABAMA · BIRMINGHAM AIRPORT AUTHORITY
AI Summary
Birmingham Airport Authority requests quotes for design, engineering, demolition, and replacement of five HVAC units and installation of new ductless mini-split systems at Rental Car Ticket Counters.
The Birmingham Airport Authority (the “Authority”) is soliciting quotes for the design, engineering, fabrication, demolition, and replacement of five (5) existing multi-zone HVAC units serving the Rental Car Ticket Counters. The existing units consist of four (4) Mitsubishi Model PUMY-P48NHMU-BS (208/230V, R410A) units and one (1) Mitsubishi Model PUMY-P36NHMU (208/230V, R410A) unit. The project also includes the installation of five (5) new dual-zone ductless mini-split systems.
The purpose of this document (the “Request for Quotes” or “RFQ”) is to provide interested vendors with an overview of the opportunity, as well as instructions on how to respond. A prospective (“Proponent”) shall submit its quote (“Quote” or Quote Package”) in conformity with the procedures and requirements set in this Request for Quotes.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.