SLED Opportunity · COLORADO · CITY OF GREENWOOD VILLAGE
AI Summary
Invitation to bid for sandblasting, painting, and limited concrete repair of retaining wall capstones at I-25 interchanges in Greenwood Village, CO. Electronic bids due April 10, 2026.
Project to sandblast, paint, and provide limited concrete repair of retaining wall capstones at the I-25 and Orchard Road and I-25 and Belleview Interchanges. **Project Type**: ITB - Invitation to Bid (Formal) **Source ID**: PU.AG.USA.2488.C12785926 **Piggyback Contract**: No **Question Acceptance Deadline**: 04/07/2026 04:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: City of Greenwood Village **Reference Number**: 0000416930 **Pricing**: In attached document **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | Yes | No | **Questions and Answers**: - Q1 Arrow Right Question: Guidelines and Certifications I noted that the specifications often refer to CDOT Bridge guidelines. Should I follow those in general and will there be other SSPC QP2/QP8 requirements also? Answer: Answered in Addendum 2 03/18/2026 04:43 PM EDT 03/26/2026 03:13 PM EDT - Q2 Arrow Right Question: Previous Project 94-010 Was the previous project 94-010 awarded to the low bidder, and if so, was any portion of the project work performed? Answer: Answered in Addendum 3 04/07/2026 02:21 PM EDT 04/08/2026 06:00 PM EDT - Q3 Arrow Right Question: Completion dates See Page 12 of the Construction Agreement, Paragraph 4: Substantial completion shall be accomplished within 120 days plus 10 days until Final Completion, and Orchard Rd must be completed by July 3, 2026. Final Completion shall be no later than June 29, 2026. Please note 120 + 10 days would have a completion date of late August. What dates are to be used for the project work? Answer: Answered in Addendum 3 04/07/2026 02:24 PM EDT 04/08/2026 06:00 PM EDT - Q4 Arrow Right Question: Capstone Removal See Project Special Provisions, Page 45, PSP-1, General Paragraph 3: "Upon award of the Project, the Contractor shall remove one Capstone in the presence of the City's Project Manager and Inspector to confirm the Capstone cross section and reinforcing steel." Is this work still required since the Class 3 Bid Item has been eliminated? Answer: Answered in Addendum 3 04/07/2026 02:28 PM EDT 04/08/2026 06:00 PM EDT - Q5 Arrow Right Question: Stockpiled landscape materials See Project Special provisions, Page45, PSP-3, Description of Work, Paragraph 2: "Landscape materials shall be stockpiled on site and reset to original conditions upon completion of the work." Has this work been eliminated from the project since the Bid Items for this work have been removed from the Bid Schedule? Answer: Answered in Addendum 3 04/07/2026 02:37 PM EDT 04/08/2026 06:00 PM EDT - Q6 Arrow Right Question: Applicable Classes of Removal See Specification Revisions, Page 53, Revision of 202, Removal of Portions of Present Structure (Class 2), Description, Paragraph 2: "The applicable classes of removal shall be performed as Class 3 unless otherwise specified." Should this be "Class 2"? Answer: Answered in Addendum 3 04/07/2026 02:39 PM EDT 04/08/2026 06:00 PM EDT
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.