    AI Summary

    Douglasville-Douglas County Water and Sewer Authority seeks bids for a two-year contract to install 30-inch ductile iron pipe, including excavation, erosion control, and landscaping. Work is on an as-needed basis with no minimum quantity guaranteed.

    Opportunity details

    Solicitation No.
    PE-77017-NONST-2026-000000050
    Type / RFx
    IFB
    Status
    Open
    Level
    state
    Published Date
    March 18, 2026
    Due Date
    April 15, 2026
    NAICS Code
    237110AI guide
    Jurisdiction
    georgia
    State
    georgia
    Agency
    Douglasville-Douglas County Water & Sewer Authority

    Description

    DOUGLASVILLE ¿ DOUGLAS COUNTY WATER AND SEWER AUTHORITY 8763 Hospital Drive Douglasville, Georgia 30134 INVITATION FOR BIDS CONTRACT FOR 30-INCH DUCTILE IRON PIPE INSTALLATION IFB# 316 March 18, 2026 The Douglasville-Douglas County Water and Sewer Authority (hereinafter referred to as the ¿Authority¿) is soliciting competitive sealed bids from qualified contractors for a non-exclusive two (2) year contract for the installation of 30-inch ductile iron pipe for Authority projects to consist of the successful contractor being required to install such quantities of 30-inch ductile iron pipe as may be requested by the Authority on an as-needed basis. No minimum quantity of work is guaranteed by the Authority under said contract. Each specific ductile iron pipe installation project under the contract shall be authorized by the issuance of a separate, detailed written Work Order. The Authority will secure and submit all required permits and acquire any necessary easements prior to the issuance of the Work Order for a project to commence. The Scope of Work includes the provision by the successful contractor of all labor, tools, equipment, and supervision necessary for the installation of 30-inch ductile iron pipe for Authority projects, including, but not limited to, all pavement cutting, boring and excavation, bedding, tapping, soil erosion and sedimentation control, grassing, landscaping, and all other activities necessary for proper pipe installation in accordance with the project installation plans for the applicable Work Order and the Authority¿s Design and Construction Standards. The Authority will provide all pipe and materials necessary to complete said 30-inch ductile iron pipe installation projects.

    Key dates

    1. March 18, 2026Published
    2. April 15, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.