    AI Summary

    Invitation to Bid for HVAC improvements at Sunset Maintenance Facility in Las Vegas, NV. Scope includes removal and replacement of HVAC equipment, systems integration, and site restoration. Bid deadline extended to July 22, 2026. Contractor must be qualified per Nevada statutes.

    Opportunity details

    Solicitation No.
    20159
    Type / RFx
    ITB
    Status
    Issued
    Level
    state
    Published Date
    June 3, 2026
    Due Date
    July 22, 2026
    NAICS Code
    238220AI guide
    Jurisdiction
    Nevada
    State
    Nevada
    Agency
    Nevada

    Description

    SCOPE: It is the intent of this formal Invitation to Bid (ITB) to receive Bid Proposals from qualified Bidders for the Sunset Maintenance Facility (SMF) HVAC Improvements Project. In accordance with the bid specifications and conditions, the work includes but is not limited to the removal and replacement of the existing HVAC equipment, supporting systems integration, and any additional site restoration resulting from systems improvements. The site is located at Sunset Maintenance Facility (SMF), 5165 W. Sunset Rd, Las Vegas, 89118. General Construction 236220 Electrical, BMS and Building Management Systems, Electrical Low Voltage 238210 Plumbing, Mechanical 238220 Materials HVAC 423720 Mechanical 238220 Electrical - Low Voltage 23810 Trucking 484122 Crane 238990 CONTRACTOR: A contractor must be qualified pursuant to NRS 338.1379 or 338.1382 to bid on the contract. TITLE VI SOLICITATION NOTICE: The RTC, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 USC §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders or offerors that it will affirmatively ensure that any contract entered into pursuant to this advertisement, [select disadvantaged business enterprises or airport concession disadvantaged business enterprises] will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. --- Q&A --- Q1: Scope of Work on page # 2, section 2.2 replacing equipment item # RTU-2-2 This equipment was replaced we are guessing in 2025 with a Rheem package unit model # RGEG2T300ADG40BBA, S/N # F352400664, Date of 08/2024 do you want to replace this new unit ? Or remove from quote ? A1: Although this unit was replaced in January 2025 due to an emergency, it was replaced with a smaller unit based on immediate equipment availability. The intent of this project is to replace the existing unit with one that meets the specifications outlined in the Scope. After the existing unit is removed, RTC would like to retain it for deployment at another location. Submitted: 7/8/2026 01:38:56 PM (PT) Q2: As no RTU submittals were available during the site walk to verify unit dimensions and installation methods, could you please extend the bid deadline until the RTU submittals can be reviewed? A2: As part of Addendum No. 1, the bid will be extended an additional seven (7) days. The new bid submittal deadline is July 22, 2026, at 3:00 P.M. (PT) Submitted: 6/24/2026 01:59:16 PM (PT) Q3: There are conflicting requirements within the contract documents regarding the specified Building Automation System (BAS) manufacturer. • Specification Section 23 09 23, Paragraph 2.01.A identifies Automated Logic or approved equal as the acceptable controls manufacturer. • Scope of Work, Item 3 identifies Johnson Controls or equal as the required controls manufacturer. • Contract Drawings (Sheet M7.1 – Controls Summary) list Johnson Controls as the specified controls contractor for the project. Additionally, it is our understanding that the existing controls at SMF are currently being transitioned to an Automated Logic platform under RTC ITB 24-021CON-1. Given these discrepancies, and in consideration of system consistency, long-term maintenance, and integration with ongoing upgrades at SMF, please confirm the preferred controls manufacturer for this project. A3: There is no specified Building Automation System (BAS) manufacturer for this project. The existing BAS at SMF is currently being transitioned to an Automated Logic platform. This will be an open platform, with RTC retaining ownership of the software licensing and full administrative rights. The controls manufacturer selected for this project is not required to be Automated Logic; however, the proposed BAS needs to be fully compatible with and capable of being integrated into the new Automated Logic front end. This includes, at a minimum, integration of RTU controls, graphics, alarms, trends, and all other necessary points. References to Johnson Controls in the Scope of Work and on the contract drawings are not intended to restrict the acceptable BAS manufacturer. As well as the reference to Automated Logic in Specification Section 23 09 23 is not intended to designate a sole-source manufacturer. This project does not require a specific manufacturer, provided the proposed BAS meets all project requirements and is fully compatible with and capable of being integrated into the new Automated Logic platform. Submitted: 6/24/2026 09:02:54 AM (PT) Q4: Please confirm whether the existing gas pressure and btu output are compatible with the new units. If they are not, is a gas regulator required? A4: A gas pressure regulator is required for the RTUs. If the existing gas pressure regulator matches the Natural Gas Pressure Regulator Schedule on plumbing record dwgs dated 06-22-07 than the new units are compitable with existing gas pressure regulator, with the special attention to RTU/1-1 on the Maintenance building. We suspect compatibility in the existing gas pressure regulator may involve replacing the gas orifice size within the pressure regulator as it was sized for 325 CFH instead of 600 CFH for RTU/1-1 on the Maintenance. We would need more information to answer this. Contractor shall measure the existing inlet and outlet gas pressure at the unit and note GPR model number, spring color designation, orifice size. This information can be used to verify with the MFG literature - Salvador Hernandez - Salas O'Brien. Submitted: 6/23/2026 09:47:20 AM (PT) Q5: Is there a contact for JCI for the controls intergration? A5: Brandon Meier, brandon.e.meier@jci.com Submitted: 6/11/2026 01:07:15 PM (PT)

    Key dates

    1. June 3, 2026Published
    2. July 22, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.