    AI Summary

    Pinellas County seeks professional engineering services for design and construction phase support of a new Utility Operations Center at the Logan Pumping Station. The project includes resilient facility design to support emergency operations, funded partially by a Hazard Mitigation Grant. Proposals due June 23, 2026.

    Opportunity details

    Solicitation No.
    265020
    Type / RFx
    RFQ
    Status
    open
    Level
    county
    Published Date
    May 22, 2026
    Due Date
    June 23, 2026
    NAICS Code
    541330AI guide
    Jurisdiction
    Pinellas County
    State
    Florida
    Agency
    Pinellas County

    Description

    Pinellas County seeks Professional Engineering Services to complete design and post-design construction phase services for a new Utility Operations Center (UOC) at the Logan Pumping Station Site.  The objective of this project is to address the COUNTY’s growing need for resilient, multifunctional facilities capable of supporting continuous operations during emergency events. Services shall include, but not limited to, design plans and specifications, permitting, CMAR coordination, engineering services, service during construction, grant coordination, and all appurtenances and associated works that may be required to perform full and final design work for construction of the new Logan UOC building.

     

    Background

    This project is partially funded with a Hazard Mitigation Grant Program (HMGP) for the construction phase of the project. Please see attached grant provisions that are part of this contract.

    Project Details

    • Reference ID: 26-0496-RFQ-CCNA
    • Department: UTILITIES
    • Department Head: Jeremy Waugh (Director)

    Important Dates

    • Questions Due: 2026-06-10T19:00:00.000Z

    Evaluation Criteria

    • Important Instructions for Electronic Submittal

      The County is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov by signing up at https://procurement.opengov.com/signup. Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid.

    • Scope of Work or Project Details

      (Either reference the attachment where this is located or provide details here....)

    • OBJECTIVE/JUSTIFICATION

      Pinellas County seeks Professional Engineering Services to complete the design and services during construction for a new Utility Operations Center at the Logan Pumping Station Site.  The objective of this project is to address the COUNTY’s growing need for resilient, multifunctional facilities capable of supporting continuous operations during emergency crises. Services shall include, but not limited to, design plans and specifications, permitting, CMAR coordination, engineering services, service during construction, grant coordination, and all appurtenances and associated works that may be required to perform full and final design work for construction of the new Logan UOC building. 

    • BACKGROUND

      Pinellas COUNTY Utilities (COUNTY) owns and operates the Logan Pumping Station Site. The COUNTY desires to expand its daily operations and enhance its emergency preparedness infrastructure at the Logan Pumping Station with a new multi-functional building on site.

      The Logan UOC Building project (the PROJECT) is to design a new one-story building, approximately 13,000 square feet (SF), at 1620 Ridge Road S. Largo, Florida. This new building will house COUNTY administration offices, for approximately 30 daily employees and serve as an Emergency Operations Center (EOC) during storm events. As an EOC, this facility will be designed to safely accommodate up to 310 occupants during a storm event while still maintaining daily COUNTY operations. This scope of work was developed from a conceptual design (need date of plans) plan prepared by Williamson Design Associates (WDA) for the COUNTY. This project has been submitted for Hazard Mitigation Grant Program (HMGP) funding for the construction phase of the project.  The County has chosen to construct this project under a Construction Management at Risk (CMAR) Agreement and will execute an agreement simultaneously.  Survey and SUE services will be performed and provided once completed.     

    • DELIVERABLES

      Project Management - Invoices, schedules, monthly progress reports, Agendas with attendance list, meeting minutes with action items and decisions

      Geotechnical Report, Preliminary Engineering Drawings (30% drawings), List of anticipated technical specifications, Opinion of Probable Construction Cost in COUNTY format, Workshop agenda and notes from 30% design workshop meeting, 30% Design Deliverable Comments Log with Responses

      60% Design drawings from Architectural, Civil, Structural, Building Mechanical, Electrical, and Instrumentation & Controls disciplines, 60% Technical specifications (all disciplines), AACE Class III OPCC, Workshop agenda and notes from 60% design workshop meeting; 60% Design Deliverable Comments Log with Responses; 90% Design drawings 90% Technical specifications (all disciplines), AACE Class II OPCC, Workshop agenda and notes from 90% design workshop meeting, 90% Design Deliverable Comments Log with Responses; 100% Design drawings 100% Technical specifications (all disciplines), AACE Class II OPCC, Workshop agenda and notes from 100% design workshop meeting, 100% Design Deliverable Comments Log with Responses;

      Final Design drawings signed and sealed, Final Technical specifications signed and sealed

      Permit application package(s), Responses to permit agency’s comments, final permit application package(s), Responses to RAI, Pre-application meeting minutes

      Bidding and GMP review

      Preconstruction meeting agenda and minutes

      Responses to RFIs, shop drawing review and approvals, field site visits, as-built drawings

    • SCOPE OF WORK

      See Attached.

    • COUNTY RESPONSIBILITIES

      Project Management and Coordination with the Engineer of Record (EOR).

    • SCHEDULE

      365 Days for Design Services

    • COMPENSATION

      For the services performed under the scope of services, the CONSULTANT shall be compensated based on the Total Lump Sum amount of:

      Task 1 – PROJECT MANAGEMENT AND CONTRACT MAINTENANCE     

      Task 2 – PROJECT KICK-OFF MEETING                                                 
      Task 3 – DATA REVIEW AND SITE                                                          

      Task 4 – ADDITIONAL ALTERNATIVE CONCEPT PLANS                       
      Task 5 – PROJECT PRODUCTION TEAM (PPT) MEETINGS                    
      Task 6 – 30% DESIGN                                                                            
      Task 7 – 60% DESIGN                                                                                
      Task 8 – 90% DESIGN                                                                              
      Task 9 – 100% DESIGN                                                                       

      Task 10 - PERMITTING                                                                                  

      Task 11 – CMAR DESIGN PHASE SUPPORT SERVICES                          

       Task 12 – SERVICES DURING CONSTRUCTION                                         

    Submission Requirements

    • Proposal Requirements (required)

      Did you read through and confirm that you met all of the proposal requirements?

    • Proposal Documents (required)

      Please Upload your COMPLETE Proposal here.

    • Please confirm (required)

      Please note there are three attachments/affidavits which will have to be completed and signed by the AWARDEE*

      1. Human Trafficking Affidavit
      2. Foreign Countries of Concern Affidavit
      3. Truth in Negotiations
    • Proposal (without Cost Proposal) (required)

      Please Upload your COMPLETE Proposal here. Upload fee proposal separately in the next step.

    • Separate Cost Proposal (required)

      Confirm that your fee proposal is not attached in your Proposal and is attached separately here.

    • Bid Bond (required)

      Each bid shall be accompanied by a certified cashier’s check, or bid bond, in the amount of XXXXXof the total bid price, payable toPinellas County, as a guarantee that the bidder, if its bid is accepted, will promptly execute the Agreement. The bidder shall guarantee the total bid price for a period of 60 days from the date of the bid opening.

      Please scan and upload a copy of your bid bond/cashier's check. Bidder must also MAIL bid guarantee with a postmarked date no later thanTuesday, June 23, 2026 addressed to:

      Pinellas County
      Pamela Ulrich
      22211 U.S. Hwy 19N
      Clearwater,FL
      33765

      Please have the Bidder Name, Contract Title ("Logan Utilities Operation Center Building (PID 005222A)"), and Contract Number ("26-0496-RFQ-CCNA") listed clearly on the outside of the envelope.

    • Contract Execution, Payment Bond, Performance Bond, and Certificate(s) of Insurance (required)

      The contract shall be executed by the successful bidder and shall be returned, together with the Payment Bond, Performance Bond and Certificate(s) of Insurance to Pinellas County so that it is received within 14 working daysafter the bidder has received the contract for execution. Failure to do so shall be just cause for forfeiture of the proposal guaranty.

    • Bid Bond (required)

      Will this solicitation require a bid bond?

    • Electronic Pricing Table (required)

      Would you like to have bidders respond to an electronic pricing table through ProcureNow?

      Some examples of of when to say "yes":

      1. This is a quote for goods or commodities
      2. This is a public works bid, with a pricing table that can be uploaded into ProcureNow from an excel spreadsheet
      3. Seeking services for hourly rate schedules
    • Separate Fee Proposal Upload (required)

      If you are NOT using the Electronic Pricing Table option, will you want your bidder to separate a Price Proposal from the rest of their Response? You'll want to do this if you open your bids initially WITHOUT showing price, and then come back in after a technical evaluation to unseal pricing later.

    • Evaluation Committee? (required)

      Will there be an evaluation committee to review the proposals and score them based on weights and multiple criteria?

    Key dates

    1. May 22, 2026Published
    2. June 23, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.