SLED Opportunity · PENNSYLVANIA · PITTSBURGH PUBLIC WORKS

    Mailing Services

    Issued by Pittsburgh Public Works
    cityIFBPittsburgh Public WorksSol. 240690
    Closed
    STATUS
    Closed
    due Apr 21, 2026
    PUBLISHED
    Mar 31, 2026
    Posting date
    JURISDICTION
    Pittsburgh Public
    city
    NAICS CODE
    561499
    AI-classified industry

    AI Summary

    The City of Pittsburgh seeks bids for comprehensive mailing services including imaging, folding, inserting, and delivery of various official mailings. Vendors must have experience with large volume mailings and comply with city participation and contractual requirements. Bid opening is April 21, 2026.

    Opportunity details

    Solicitation No.
    240690
    Type / RFx
    IFB
    Status
    open
    Level
    city
    Published Date
    March 31, 2026
    Due Date
    April 21, 2026
    NAICS Code
    561499AI guide
    Agency
    Pittsburgh Public Works

    Description

    The City of Pittsburgh, Office of Management and Budget, is soliciting bids for Mailing Services.

    Project Details

    • Reference ID: 2026-IFB-011
    • Department: Office of Management & Budget
    • Department Head: Rea Price (Acting Director)

    Meetings & Milestones

    EventDateLocation
    Bid Opening 2026-04-21T19:00:00.000ZOffice of Management & Budget Bureau of Procurement 414 Grant Street, Room 502 Pittsburgh, PA 15219 Bids will be publicly opened in the presence of a Sourcing Specialist and a representative from the Office of the Controller, or their designee.

    Evaluation Criteria

    • Specifications

      Employee Benefits Information Mailings

      Open health insurance enrollment-direct imprint-name, address, postal barcode on large, brown outgoing mail envelope, hand fold one employee open health enrollment form with matching name and address to imprint on large brown outgoing mail envelope, inserting matching open health enrollment form, and inserting one four-page stapled information notice inside the labeled large brown outgoing mail envelope with metal clasp.

      • Approximately 3,555 pieces one-two times annually.

      Note: Most employee benefits mailings require the matching of the name and address on the outgoing mail envelope to the name and address on one of the forms that is inserted inside of the imprinted envelope

      Self-Assessed Delinquent Tax Notice

      Hand fold matching taxpayer delinquent notice letter along with matching list of taxpayer’s outstanding liabilities charge sheet, and inserting matching delinquent notice letter and matching liabilities charge sheet into white window outgoing mail envelope with complete name and address from letter showing through window in the white window outgoing mail envelope. Approximately 600 pieces one-four times annually.

      New City of Pittsburgh Property Owner Information

      Direct imprint, name, address and postal barcode to front of small brown outgoing mail envelope, inserting one pre-folded letter, and one tax reference booklet into each imaged small brown redi-seal envelope.

      • Approximately 2,210 pieces two-four times annually.

      Frick Environmental Center Newsletters/Flyers

      Direct imprint name, address, and postal barcode on newsletters/flyers-newsletter-flyer size-11”x17” pre-folded to 8 ½x11”–hand insert one letter size sheet and hand folding to postal letter size- 5 ½ x8 ½” newsletter with insert sheet, affixing two round self- adhesive tabs to close newsletter/flyer with one insert sheet.

      • Approximately 1,559 pieces two-four times annually.

      Note: Same type or similar mailing services for any other city tax or information mailings, etc for the Department of Finance, and any/all city departments will apply to this mailing services contract.

      Property Tax Relief Renewal Information

      • Direct imprint (imaging) on pre-folded (tri-letter fold) on act 77 property tax relief renewal application of taxpayer’s name and address and account number, property location.
      • Outgoing mail address postal barcoded.
      • Complete mailing address, account number, and postal barcode must show through window in outgoing white window mail envelope.
      • Insert in order in white window outgoing mail envelope folded and imaged act 77 property tax renewal application and insert pre-folded taxpayer property tax relief eligibility criteria letter and return mailing envelope, seal envelopes, presort envelopes according to post office regulations for presorted standard mail classification postage permit imprint mail, fill out required postal form for the same and take to the post office.
      • Approximately 9,276 pieces two times annually.

      Garbage Day and Recycling Pick-Up Notices

      • Direct imprint (imaging) on notices outgoing mail address, outgoing mail address postal barcoded. Affixing round white adhesive tab on notices so they will stay closed for mail delivery.
      • Presort notices according to post office regulations for presorted standard mail classification postage permit imprint mail, fill out required postal form for the same and take to the post office.
      • Approximately 116,370 pieces two times annually.

      City Planning-Map Pittsburgh Rezoning Project For All City Of Pittsburgh Neighborhoods

      • Direct imprint (image) names, addresses, postal barcode on number 10 plain white, outgoing mail envelopes, insert 2-4 pre-folded sheets of zoning information into each imaged outgoing mail envelope, seal envelope,
      • Presort envelopes according to post office regulations for presorted standard mail classification postage permit imprint mail.
      • Fill out required postal form and take to the post office.
      • Approximately 35,000 pieces as needed throughout the year.

      Pending Notice of Treasurer’s Sale Letters & Mortgage Company Real Estate Tax Letters

      • Word document for letter and excel spreadsheet for variable billing information. Letter word merge to excel spreadsheet to image full page letter with no postal barcoding of outgoing mailing addresses.
      • Folded imaged letters, inserting along with folded imaged letters pre-folded treasurer’s ale schedule or #9 return mailing envelope into #10 special window outgoing mail envelope, sealing completed envelopes, keeping envelopes in strict order by code number & delivery back to the department of finance.
      • Approximately 2,800 four-five times annually.

      Current Billing-Burglar Alarm Permit Renewal Letters

      • Word document for letter and excel spreadsheet for variable billing information. Letter word merge to excel spreadsheet to image full page letter.
        • Outgoing mail name & address not postal barcoded because letter is not in layout for automatic folding into window envelope.
        • Vendor will image matching name & address and postal barcode on #10 non- window outgoing mail envelopes, fold imaged letter and insert letter and #9 return mailing envelope into #10 matching imaged non-window outgoing mail envelope, presort, and take to post office.
      • New Crywolf burglar alarm system billing/mailing to allow City of Pittsburgh personnel to verify if an individual has a valid burglar/fire alarm permit & document outcome of an alarm call
      • Approximately 24,000+ mailings

      Burglar Alarm Permit Renewal Letters & Burglar Alarm Registration Payment Letters

      • Approximately 24,000+ monthly mailings.
      • When Crywolf letters are converted to word document for letters and excel spreadsheet for variable billing information plus letters will be in layout design for automatic window envelope insertion to image and insert-word merge to excel spreadsheet-outgoing name & mailing address postal barcoded on full page letter, fold, insert into window envelope, presort, and take to the post office.
      • For all jobs, the department of finance and any/all city departments will supply the outgoing mailing names and addresses on computer diskette, computer CD, or e- mail on excel spreadsheet.
      • Crywolf billing/mailing letters are in PDF format which is not compatible to postal barcoding.
        • Until such time as City of Pittsburgh information systems will convert the letters to word document for letter and excel spreadsheet for variable billing information-word merge to excel spreadsheet vendor will image full page letters, perform creative hand fold of letters into #10 window envelope, insert #9 return mailing envelope for burglar permit renewal letters, no additional insert for the registration payment letters, seal completed envelopes, deliver finished letters to the City of Pittsburgh mail room, so the City mail room can spray postal barcode on outgoing mail envelopes so the City of Pittsburgh receives postage discount.
      • Same type or similar mailing services for any other City of Pittsburgh information mailings may be required for the department of finance, and any/all city departments that will apply to this contract.

       

    • INVOICING TERMS

      The Contractor will also be responsible for submitting a complete breakdown of subcontracting costs together with all subcontractors documentation (i.e., labor invoices, material invoices, equipment rental, etc.). Invoices shall be submitted directly to the Department initiating the project and should be submitted not more than once a month. Contractor will be responsible to follow the user Department's invoicing procedures. Payment to the Contractor will be based on the City Inspector's daily labor and material logs.

      City Business Privilege Tax is the Contractor's and Sub-Contractors responsibility and as such is not a reimbursable item on Contractor's or Sub-Contractors billing.

      PA State taxes paid by the Contractor on material purchases or equipment rentals are reimbursable if included on third party invoices submitted.

      Off-site fabrication time may be allowed, if approved by the Director and is included in the proposal. City Inspector shall be permitted to verify off-site fabrication as deemed appropriate.

      A Final project invoice MUST be submitted within 45 days after the completion of the work on each project. Failure to submit the required product warranties, operation manuals, and maintenance manuals may delay final payment. When submitting the Final project invoice, the Contractor shall state therein that payment of said invoice constitutes full and complete payment of all monies owed and billable on said project. Any exception to this should be so noted and tallied on the Final invoice. After receipt and processing of the Final project invoice, the City will not entertain any additional cost for that particular project and will consider the project closed.

      Worksheets must be provided on all T&M and unit price projects prior to payment. Travel time is not a compensatory item.

      Personnel reporting, as directed, to the job site and work being cancelled because of inclement weather, breakdown, or any other just cause, as determined by the City of Pittsburgh, shall receive two hours report time; Personnel working two hours but less than four shall receive four hours compensation; Personnel working four hours but less than six shall receive six hours compensation; personnel working six hours but less than eight hours shall be compensated for eight hours. These terms apply only to trades people (not superintendents, project managers, etc.) and only when such cancellation is so directed by the City of Pittsburgh. Work cancellation resulting from negligence on the parts of the Contractor will not receive compensation.

      Principals, project managers, estimators, expeditors, clerical and all other office personnel shall be considered Overhead. Time spent in preparation of an estimate for each project shall be considered Overhead. Time spent preparing and securing permits, drawings required thereof, shop drawings, submittals, schedules, reports and invoices shall also be considered Overhead costs.

      Superintendents field time must be verified by Inspectors logbook entries. Only the Superintendents actual time spent on the job site will be compensated to the nearest 1/4 hour. Superintendents travel time and office time will be considered overhead costs. A Superintendent shall be defined as an individual overseeing several jobs with several foremen reporting to him.

      Hauling or delivery of personnel, materials, supplies, or equipment to/from/within the job site(s) is not to be considered as billable hours. Travel time for personnel to/from/within the job site(s) is also not to be considered as billable hours. Time charged for picking-up unexpected material needs, etc., will be compensated at the lowest trade rate bid and only with prior approval of the Directors representative.

      Use of rental facilities, as applicable, must be identified on each project estimate and approved by the Director. Costs incurred by Contractor for temporary facility rental (ex: bulk storage, oversize storage, etc.) including associated utility costs (if assessed), etc. shall be reimbursed at cost. Receipts will be required.

      If any rental equipment is needed, it must be pre-approved by the Director. Costs incurred by Contractor for approved rentals shall be reimbursed at cost with no markup. Receipts will be required for payment.

       

    • MWE/DBE — The City of Pittsburgh is committed to the ideal of providing all citizens an equal opportunity to participate in City and its Authorities' contracting opportunities. It is therefore the City's goal to encourage increased participation of women and minority groups in all City contracts. The City requires that all respondents demonstrate good faith efforts to obtain the participation of Minority-Owned Business Enterprises (MBE's) and Women-Owned Business Enterprises (WBE's) in work to be performed under City contracts. The levels of MBE and WBE participation will be monitored by the City of Pittsburghs Equal Opportunity Review Commission (EORC). In order to ensure that there are opportunities for historically disadvantaged minority groups and women to participate on Covered Contracts, and consistent with the City's current equal employment opportunity practice and goals, the EORC will review contracts to include an evaluation of a developer/contractors employment of minority groups and women, encourage goals of eighteen (18) percent and seven (7) percent respectively.
    • INVOICING TERMS

      All invoices must contain the following information. The City of Pittsburgh will no longer accept "lump sum" invoicing:

      • The City of Pittsburgh Purchase Order Number (e.g. 123456OC)
      • The City Controller Number
      • Pricing breakdown on the invoice is to align to the pricing listed on the contract
        • For all Cost Plus Percent line items, you must list both the cost of the item and the price we are being charged on the invoice so we can ensure we are getting the contracted price
        • If you have labor hours, they should be separated from the cost of parts
      • The awarded supplier should provide proof of the cost of goods along with the invoice
      • Payment will be Net 45 days
    • BID SUBMISSIONS

      All bids must be submitted electronically. No bids shall be accepted in person, by U.S. Mail, by private courier service, via oral or email communication, telephone or fax transmission.

    • Breach of Contract Terms

      Any violation or breach of terms of this contract on the part of the Contractor may result in the suspension or termination of this contract or such other action that may be necessary to enforce the rights of the parties of this contract. The duties and obligations imposed by the contract documents and the rights and remedies available thereunder shall be in addition to and not a limitation of any duties, obligations, rights and remedies otherwise imposed or available by law.

    • Termination of Contract for Cause

      If, through any cause, the Contractor shall fail to fulfill in timely and proper manner his obligations under this Contract, or if the Contractor shall violate any of the covenants, agreements, or stipulations of this Contract, the City of Pittsburgh shall thereupon have the right to terminate this Contract by giving written notice to the Contractor of such termination and specifying the effective date thereof, at least five (5) days before the effective date of such termination. In such event, all finished or unfinished documents, data, studies, surveys, drawings, maps, models, photographs, and reports prepared by the Contractor under this Contract shall, at the option of the City of Pittsburgh, become its property.

      Notwithstanding the above, the Contractor shall not be relieved of liability to the City of Pittsburgh for damages sustained by the City of Pittsburgh by virtue of any breach of the Contract by the Contractor, and the City of Pittsburgh may withhold any payment to the Contractor for the purpose of set-off until such time as the exact amount of damages due the City of Pittsburgh from the Contractor is determined.

    • BID ERRORS

      If a Bidder submits a bid with a price that is patently incorrect, such that a “reasonable person” would recognize the error, the Bidder shall be given the opportunity to withdraw the entire bid or only the incorrect line item in a bid. If the Bidder wishes to withdraw the entire bid or only a line item, the Bidder shall, within five working days of bid opening, state in a letter to the City the reason for the mistake and request that the City not consider the bid or line item for award.

    • Veteran-Owned Small Business — It is also the City's goal to encourage participation by veteran-owned small businesses in all contracts. The City of Pittsburgh shall have an annual goal of not less than five (5) percent participation by veteran-owned small businesses in all contracts. The participation goal shall apply to the overall dollar amount expended with respect to the contracts. The City requires that all respondents demonstrate good faith efforts to obtain the participation of veteran-owned small business in work to be performed under City contracts. The levels of veteran-owned participation will be monitored by the City of Pittsburghs EORC.
    • INITIATING THE WORK

      The procedure for initiating work shall be as follows:

      1. The Director or designee shall describe the work for each intended project and request that Contractor submit a not to-exceed cost proposal using the rates and unit prices established in the original bid as well as any other costs associated with the completion of the work. The Contractor shall follow the requested format for the submission of each proposal as enumerated in the written cost proposal. Each proposal must include a signed written estimate and shall be submitted within seven (7) days of the request unless noted otherwise.
      2. Such estimates must be in a format acceptable to the City of Pittsburgh and should include approximate start and finish dates, cost breakdowns for labor, material and equipment, (including truck time, when applicable), a schedule of values with a total cost for the project as per City supplied construction documents, a list of shop drawings (to be supplied as required by the project), a list of subcontractors and/or suppliers (when applies) together with a copy of their proposal(s) including breakdowns, and any other data which may be pertinent and requested. On projects estimated to cost-over $10,000 a minimum of two (2) sub-contractor and supplier proposals must be submitted for review and approval. On large projects, a construction schedule with periodic updates may be required to be provided by Contractor at no additional cost.
      3. Time is of the essence for the contract and for any executed proposals under the contract. Non-adherence to the stipulated start and completion dates or failure to supply requested documentation in a timely manner for the proper progress of the work may be cause for immediate cancellation of this contract in addition to any other remedies available to the City by contract or law.
      4. The Director shall accept the Contractor’s cost proposal by providing a Letter of Acceptance (LOA).The LOA shall specifically accept the Not-To-Exceed-Amount (NTEA) for each project listed in the proposal. The final cost of each completed project may not exceed the NTEA listed in the LOA. Only the Director of the User Department may, in writing to the Contractor, increase the NTEA through the Pending Change Notice (PCN) process or change order, subject to legislative appropriation if applicable.
      5. Unless otherwise directed in the LOA, the Contractor must begin work within ten (10) calendar days after the notice to-proceed is provided in the LOA and shall perform the work in accordance with the Director's orders and instructions.
    • General Specifications
      • Vendor must perform all mailing services at their place of business.
      • The Department of Finance and any/all city departments will provide all materials needed to perform each mailing service.
      • Vendor will pick-up all materials for each outgoing mailing from the Department of Finance at the City-County Building, or any other place(s) designated by the Department of Finance and any/all city departments and deliver finished mailings to the City of Pittsburgh mail room located on the 2nd floor, County Office Building, 414 Grant Street Pittsburgh, PA 15219 or U.S.P.S. business mail entry unit.
      • Vendor will deliver all unused materials (leftovers) which were provided by any/all city departments for the performance of each mailing service to the Department of Finance, City-County Building, 414 Grant Street, Pittsburgh, PA 15219 or any other place(s) designated by the Department of Finance or any/all city departments.
      • Large volume mailing jobs will have materials shipped by printer to vendor’s place of business.
      • All City of Pittsburgh mailing services jobs will have preprinted City of Pittsburgh postage permit imprint-first class presort or presorted standard, or the postage and postal barcode will be applied by the Allegheny County mail room’s postage meter mailing machines.
      • Upon notification by the Department of Finance or any/all city departments that mailing services are needed, vendor must pick-up all materials for the outgoing mailing service the next day and will begin the mailing service within the pick-up day or next day and will complete the mailing service at the time specified by the Department of Finance or any/all city departments.
      • Any/all mailing name and address labels affixed to envelopes, post cards, cards, etc. Must be affixed properly and in the correct position on each mail piece to allow for automatic OCR barcode scanning of each mail piece so the City of Pittsburgh will receive U.S. postal service automation postage discount rates.
      • The City of Pittsburgh reserves the right to have City of Pittsburgh employees perform any of the mailing services listed or pertaining to this mailing services contract at any time.
      • Bidder’s note: total award will be made to only one vendor
        • Vendor must bid on all items to be considered for award of those sections, as all mailing services can be interconnected to complete any/all mailing jobs.
      • Vendor must have a minimum (3) years of documented experience in imaging/mailing services. Vendor must have processed a mailing service job of 115,358 pieces.
      • Verification will be required by copy of U.S. Postal Service statement of mailing first class presort or presorted standard with postage permit imprint.
      • Vendor must provide reference list of other customers and volume of mailing services.
      • If the successful bidder is not the sole source of the complete imaging, mailing & computer services for the mailing services in this contract, bidder must give the name of any/all sub-contractors who will provide the mailing services to the City of Pittsburgh.

      NOTE: BID PRICES MUST INCLUDE ROUND TRIP PICK-UP AND DELIVERY COST

       

    • Shipping & Delivery Terms

      Shipping and delivery costs must be included with vendor's submitted response pricing under the Pricing Proposals section. The City of Pittsburgh will not pay for nor reimburse separate shipping, handling, or delivery fees.

       

      Purchase orders placed under an awarded contract will be F.O.B. Destination.

       

    • COORDINATION WITH OTHERS

      This Contractor shall cooperate with all other entities involved in the project including the Owner in the scheduling of the work such that Contractor’s work does not delay or interfere with the work of any other entity. It will be the Contractor's responsibility to coordinate the schedule for the work with other primes and subcontractors and provide input to general contractors for preparation, periodical update, and distribution of a master schedule for each project, if required, at no additional cost. The master schedule shall include the work of all other primes and subcontractors participating in the work.

    • Good Faith Commitment — In order to demonstrate good faith commitment to these goals, all respondents are required to complete and submit with their bids the attached MDE/WBE/Veteran-Owned Solicitation and Commitment Form (which details the efforts made by the respondents to obtain such participation). Failure to submit a properly completed form along with documentation of Good Faith Commitment may result in rejection of the bid. Participants are encouraged to contact the Equal Opportunity Review Commission at 412-255-8804 to assist further. For further information, including definitions and additional requirements, please see Chapter 177A (Sections 177A.01 et. seq.) of the City Code and Section 161.40 of the City Code.
    • Termination

      The City of Pittsburgh may terminate this Contract at any time giving at least ten (10) days notice in writing to the Contractor. If the Contract is terminated by the City of Pittsburgh as provided herein, the Contractor will be paid for the time provided and expenses incurred up to the termination date. If this Contract is terminated due to the fault of the Contractor, Paragraph 1(Breach of Contract) hereof relative to termination shall apply.

      Notwithstanding the above, the Contractor shall not be relieved of liability to the City of Pittsburgh for damages sustained by the City of Pittsburgh by virtue of any breach of the Contract by the Contractor, and the City of Pittsburgh may withhold any payment to the Contractor for the purpose of set-off until such time as the exact amount of damages due the City of Pittsburgh from the Contractor is determined.

    • SPECIFICATION ERRORS AND BULLETINS (AMENDMENTS)

      If any alleged errors are noted in the bid specifications, bidder should immediately notify the City and, if confirmed, a bulletin shall be sent to all bidders. A copy of all bulletins issued shall be submitted electronically with the suppliers bid.

    • Equal Employment Opportunity

      During the performance of this Contract, the Contractor agrees as follows:

      1. The Contractor will not discriminate against any employee or applicant for employment because of race, color, ancestry, place of birth, religion, sex, sexual orientation, color, age, familial status, handicap, or national origin. Contractor shall comply with the applicable provisions of the Pittsburgh City Code, Title Six: Conduct, Article V: Discrimination, and any amendments thereto. Contractor shall comply with the applicable provisions of Title I and Title II of the Americans with Disabilities Act, and any amendments thereto and any regulations issued thereunder. Contractor shall incorporate in any subcontracts or purchase orders which may be permitted under the terms of this contract a requirement that subcontractors shall also comply with the provisions of this Section.
      2. The Contractor will take affirmative action to ensure that applicants are employed, and that employees are treated equally during employment, without regard to their race, color, ancestry, place of birth, religion, sex, sexual orientation, color, age, familial status, handicap, or national origin. Such action shall include, but not be limited to the following: Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the City of Pittsburgh setting forth the provision of this non-discrimination clause.
      3. The Contractor will, in all solicitation or advertisements for employees placed by or on behalf of the Contractor; state that all qualified applicants will receive consideration for employment with regard to race, color, ancestry, place of birth, religion, sex, sexual orientation, color, age, familial status, handicap, or national origin.
      4. The Contractor will cause the foregoing provisions inserted in all subcontracts for any work covered by this Contract so that such provisions will be binding upon each subcontractor, provided that the foregoing provisions shall not apply to contracts or subcontract for standard commercial supplies or raw materials.
      5. The Contractor will comply with all provisions of US Executive Order 11246 of September 24, 1965, as amended by US Executive Order 11375 and as supplemented in US Department of Labor Regulations (41 CFR, Part 60), and of the rules, regulations, and relevant orders of the US Secretary of Labor.
      6. The Contractor will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by the rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the City of Pittsburgh and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders.
      7. In the event of the Contractors non-compliance with the non-compliance clauses of this Agreement or with any of such rules, regulations, or orders, this Agreement may be canceled, terminated, or suspended in whole or in part and the Contractor may be declared ineligible for future Government contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law.
    • PERMITS
      1. The Contractor shall secure all necessary permits and licenses required for the performance of the contract and shall pay all fees, charges, and expenses arising therefrom thereof. The City shall waive any fees and charges normally associated with issuance of City permits. All other fees for non-City permits must be included by the Contractor in the proposal to be considered by the City.
      2. The Contractor shall be responsible for removal and disposal of all waste associated with the work to an off-site location, unless otherwise indicated by the Director. When required to dispose of any waste, the Contractor shall secure all permits, pay all fees and produce documentation attesting to the legal and safe disposal of such waste. Special disposal requirements or costs of toxic materials, debris or equipment must be specifically addressed by the Contractor in the proposal for each project in order to be considered by the City.
    • DEFINITIONS

      CITY: The City of Pittsburgh, a municipal corporation of the Commonwealth of Pennsylvania.

      CONTRACTOR: The contracting party or parties, or such party or parties seeking to enter into a contract with the City of Pittsburgh, as the case may be, or the legal representatives of such party or parties.

       

       

    • CLARIFICATION

      The City reserves the right to request clarification of any bid before bid award.

    • SAFETY AND CODE REQUIREMENTS
      1. All Contractors shall comply with standards and regulations of Public Law 91-596, "Safety and Health Regulations for Construction", latest edition, Occupational Safety and Health Act of 1970.
      2. All Contractors will comply with Act No. 287 of the General Assembly, approved December 10, 1974, which defines the procedures for notification to public utilities prior to excavation, drilling or demolition work by use of powered equipment or explosives. For confirmation of utilities call 800-242-1776.
      3. All Contractors shall comply with all federal, state and local codes, regulations and standards as appropriate including those in regard to environmental protection, of the public, and property, etc. Where codes, regulations, and standards are referred to herein, it shall be understood that such reference is to the current issue in effect at the date of the contract including all revisions and addenda, if any, and are hereby made part of this contract and at no additional expense to the City.

       

       

    • EXECUTION OF BIDS

      Bids are to be executed by the following persons:

      CORPORATION – A corporate officer with authority to make binding agreements for the corporation.

      If a bid is executed by any other person, a power of attorney, a copy of the bylaws, or a resolution of the Board of Directors documenting the authority of that person to sign the bid must accompany the bid. The power of attorney, bylaw, or resolution must be certified by the Corporate Secretary as a true and correct copy, still in force as of the date of the execution of the contract.

      PARTNERSHIP - At least one (1) of the partners.

      SOLE PROPRIETORSHIP - The individual owner.

      BUSINESS OPERATING UNDER A FICTITIOUS NAME - Entities operating a business under a Fictitious Name must execute the contract in the name of the entity trading and doing business as the Fictitious Name

    • QUALIFIED BIDDERS

      All bidders must be merchants dealing in the goods and services on which they bid, and must be qualified to advise as to their application and use. Bidders warrant, and must be able, upon request, to demonstrate, that they possess the knowledge, experience, skill, capital, stock, charters, licenses, permits, patents and personnel necessary to satisfactorily perform the contract for which they submit bids.

    • Civil Rights Acts of 1964 and 1988, as Amended

      Under Title VI of the Civil Rights Act, as amended, no person shall, on the grounds of race, color, creed, sex, familial status, handicap, or national origin, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving Federal financial assistance.

    • Section 109 of the Housing and Community Development Act of 1974, as Amended

      No person in the United States shall on the grounds of race, color, national origin, familial status, handicap, or sex be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity funded in whole or in part with funds made available under this title.

       

    • EMERGENCY WORK

      The Contractor must have the ability to perform emergency work on-site within a four hour period of notice.. The Contractor must have twenty-four (24) hours a day in-person accessibility (Answering service, or Machine and paging capability). The Contractor must also have a fax machine in operation by time of contract commencement. The Contractor must also have the ability to respond to requests by the City within a 24 hour period, unless other arrangements are approved. Non-adherence to this clause may be cause for cancellation of contract or any other remedies provided to the City by contract or law.

    • PERFORMANCE AND BID BONDS

      Whenever a bid bond or performance bond is required, the bidder may meet the requirement by submitting an acceptable cashier's check, certified check, banker's check or an irrevocable letter of credit in the amount required. Whenever a performance bond is required, the successful bidder shall keep all provisions and requirements of the bond up-to-date throughout the term of the contract.

       

       

    • PRE-PRINTED TERMS AND CONDITIONS

      Bidder’s pre-printed Terms and Conditions or restrictions commonly appearing on the reverse side of letters submitted with the bid and/or bidder’s specifications material and contract documents shall be disregarded and have no effect.

    • INSURANCE

      A certificate evidencing the following minimum insurance must be provided when award is made, unless otherwise specified:

       

      1. GENERAL LIABILITY Single limit of Bodily Injury and Property Damage Combined: $500,000.00 each occurrence. $1,000,000.00 aggregate.
      2. CITY OF PITTSBURGH must be listed as "Additional Insured' on the insurance certificate on all policies except those in which no additional insured is permitted (e.g., some professional liability)
        1. NOTE: The name(s) of the insured on the certificate must be the same as the name(s) of the Contractor listed on the bid document.
        2. Insurance coverage must be an “OCCURRENCE POLICY". "Claims made” policies are unacceptable.
      3. WORKERS’ COMPENSATION: STATUTORY LIMITS.
      4. AUTOMOTIVE LIABILITY INSURANCE – MINIMUM REQUIREMENTS: $500,000 for each individual occurrence and $1,000,000 in aggregate coverage. This requirement may be explicitly waived by the City when appropriate. •PROFESSIONAL LIABILITY (required at City request): Coverage as shall protect the Supplier and any subcontractor performing work under the Contract, from claims errors and omissions which arise from operation of the Contract, whether such operations are performed by the Supplier, any subcontractor, or anyone directly or indirectly employed by either. The amounts of such insurance shall not be less than $1,000,000 each occurrence/aggregate and $1,000,000 excess liability, each occurrence/aggregate.

      Insurance must be maintained in full force and effect throughout the term of the contract. If insurance must be renewed during the term of the contract, the new certificate of insurance must be forwarded to:

       

      Office of Management & Budget, Procurement

      Room 502, City-County Building

      414 Grant Street

      Pittsburgh, PA 15219

       

      Failure to provide and renew such insurance as required shall be deemed a material breach of contract and shall be a basis for immediate termination of this Contract and any related agreement. The insurance requirements of this provision shall be in addition to any other insurance requirements of this Contract.

       

       

    • PAYMENT BONDS

      Whenever a bid bond or payment bond is required, the bidder may meet the requirement by submitting an acceptable cashier's check, certified check, banker's check or an irrevocable letter of credit in the amount required. Whenever a payment bond is required, the successful bidder shall keep all provisions and requirements of the bond up-to-date throughout the term of the contract.

    • Section 3 Compliance in the Provision of Training, Employment, and Business Opportunities
      1. The work to be performed under this contract is on a project assisted under a program providing direct Federal financial assistance from the U.S. Department of Housing and Urban Development and is subject to the requirements of Section 3 of the Housing and Community Development Act, as amended, Section 3 requires that to the greatest extent feasible opportunities for training an employment be given to lower income residents of the project area and contracts for work in connection with the project be awarded to business concerns which are located in, or owned in substantial part by persons residing in the area of the project.
      2. The parties of this contract will comply with the provisions of said Section 3 and the regulations issued pursuant thereto by the Secretary of U.S. Housing and Urban Development set forth in 24 CFR Part 135, and all applicable rules and orders of the Department issued thereunder prior to the execution of this contract. The parties to this contract certify and agree that they are under no contractual or other disability which would prevent them from complying with these requirements.
      3. The contractor will send to each labor organization or representative of workers with which he has a collective bargaining agreement or other contract or understanding, if any, a notice advising the said labor organization or worker's representative of his commitments under this Section 3 clause and shall post copies of the notice in conspicuous places available to employees and applicants for employment or training.
      4. The contractor will include this Section 3 clause in every subcontract for work in connection with the project and will, at the direction of the applicant for or recipient of Federal financial assistance, take appropriate action pursuant to the subcontract upon a finding that the subcontractor is in violation of regulations issued by the Secretary of U.S. Housing and Urban Development, 24 CFR Part 135. The contractor will not subcontract with any subcontractor where it has notice or knowledge that the latter has been found in violation of regulations under 24 CFR Part 135 and will not let any subcontract unless the subcontractor has first provided it with a preliminary statement of ability to comply with the requirements of these regulations.
      5. Compliance with the provisions of Section 3, the regulations set forth in 24 CFR Part 135, and all applicable rules and orders of the Department issued hereunder prior to the execution of the contract, shall be a condition of the federal financial assistance provided to the project, binding upon its successors and assigns. Failure to fulfill these requirements shall subject the applicant or recipient, its contractors, and subcontractors, its successors an assigns to those sanctions specified by the grant or loan agreement or contract through which Federal assistance is provided, and to such sanctions as are specified by 24 CFR Part 135.
    • SOLICITATION ONLY

      This Invitation for Bid is a solicitation only and is not intended to be nor should it be construed to be an offer to enter into any contract or other agreement.

    • CONSTRUCTION DOCUMENTS: DRAWINGS AND TECHNICAL SPECIFICATIONS
      1. The Contractor will be required to comply with all drawings and technical specifications, which may be associated with each particular project. Failure to comply may result in delay of payments, back-charging for corrective remedial work, cancellation of the contract, or any other remedies provided to the City by contract or law.
      2. On certain large and/or complex projects, the contractor may be required to provide shop drawings and catalogue cuts of the proposed equipment and/or assemblies. Submittals of these types shall be furnished in a timely manner so as not to delay the the progress of the work.Such submittals shall be at the Director's request and the cost thereof will be considered as Overhead.
      3. Where Standards, Specifications, and Codes are referred to herein, it shall be understood that such reference is to the issue in effect as of the date of the proposal, including all revisions and addenda, if any.
      4. The material, equipment, and installation shall conform to all applicable regulations and codes.The applicable regulations and codes are hereby made a part of the proposal specifications and shall take precedence over conflicting proposal specifications. Compliance with any applicable regulations and codes shall be satisfied by the Contractor at no additional expense to the City.
    • TAX STATUS OF CITY

      The City of Pittsburgh is exempt from Federal excise taxes, transportation taxes and state sales taxes. Therefore, bidder should not include any such taxes in its calculations or in the prices bid. Any sales tax invoiced to the City shall not be paid.

       

       

    • USE AND POSSESSION PRIOR TO COMPLETION
      1. The City shall have the right to take possession of or use any completed or partially completed part of the work. Before taking possession of, or using any part of the Work, the Director shall furnish the Contractor with a Certificate of Substantial Completion containing a list of items of work remaining to be completed or corrected for those portions of the Work that the City intends to take possession of, or use. However, failure of the Director to list any item of work shall not relieve the Contractor of responsibility for complying with the terms of the Contract. The City's possession or use of some of the Work shall not be deemed an acceptance of all of the Work under the Contract.
      2. For those portions of the Work which the City has such possession or use, the Contractor shall be relieved of the responsibility of loss or damage to the Work resulting from the City's possession or use, notwithstanding the terms of any warranties, maintenance responsibilities, protection requirements, or other specified duties which remain the Contractor's responsibility beyond the Date of Substantial Completion.
    • FATAL BID ERRORS

      The following errors shall be deemed fatal and render the bid void: Failure to sign the bid, or bond or both, If the signatures are those of unauthorized persons, or If there is no stated pricing. All other errors are waivable at the sole discretion of the City if such errors would not invalidate a fair and just competitive bidding procedure free of favoritism and fraud and a common standard for all bidders.

    • MBE/WBE Participation

      (Applicable only in contracts for $25,000 or more). Contractor agrees to assist City of Pittsburgh's efforts to encourage the participation of minorities and women in City of Pittsburgh contracts by making a good faith effort to utilize women and minorities in performing the work required by this Contract. The final payment under this Contract will not be made until Contractor submits a report to City of Pittsburgh detailing the following information.

      1. The percentage and dollar amount of the contract paid to Minority Business Enterprises along with the names, addresses and telephone numbers of said Minority Business Enterprises;
      2. The percentage dollar amount of the contract paid to Womens Business Enterprises along with the name, addresses and telephone numbers of Womens Business Enterprises; and
      3. The goals and timetables for MBE or WBE workforce in each trade on all construction work in the covered area. For purposes of this Notice, the covered area is Pittsburgh SMSA (Allegheny, Washington, Beaver, and Westmoreland Counties);
      4. An explanation of any failure to achieve the goals for Minority Business Enterprises and Women Business Enterprises participation which had been represented to City of Pittsburgh prior to the award of the contract.
    • INSPECTIONS AND CLOSEOUT
      1. During the course of the project, the City will assign an inspector to this site to monitor the work. The Inspector shall act as the Director's Representative on all matters in the field. The Inspector, however, shall not have the authority to approve work or accept substitutions as this is the responsibility of the awarding Department Project Manager. The Contractor shall fully cooperate with the Inspector. The Contractor's Field Representative may be required to sign the Inspector's daily log as verification of hours worked by the Contractor. Only the actual hours that workers are productively engaged in the progress of the work will be logged by the Inspector. It is in the Contractor's best interest to efficiently and effectively manage each project.
      2. When the work is substantially complete, the Contractor shall request a Pre-Final Inspection. At that time a punch-list of deficiencies and/or incomplete work will be compiled and sent to the Contractor(s) for completion. All punch-list items must be completed within 30 days unless otherwise arranged. If there are no discrepancies found at the Pre-Final, this inspection may be considered a Final Inspection and as such Final Acceptance of the work.
      3. One Pre-Construction Meeting, one Pre-Final and one Final Inspection shall be considered a pay item for one representative of the Contractor.
    • PAYMENT OF TAXES AND SET-OFF

      Contractor warrants that any and all taxes or municipal claims that may be payable to the City of Pittsburgh by Contractor are current and not delinquent. If the City determined that there is an outstanding delinquency, that delinquency must be satisfied before a contract will be awarded to the delinquent Contractor. If any taxes or municipal claims become delinquent or owing during the term of this agreement or prior to final payment by City, Contractor hereby grants City the right to set-off that indebtedness against any amounts owing to contractor under the terms of this Contract and/or any associated agreement. If, at any time, the Contractor fails (or has failed) to enter into any contract awarded by the City, the City expressly reserves the right to recoup any and all costs associated with rebidding or re-awarding of any contract awarded to this Contractor to another Contractor. City reserves the right to apply set-off payments in whatever manner it deems appropriate.

    • Compliance with the Copeland Act

      The Contractor shall comply with the Copeland Anti- Kickback Act (18 U.S.C. 874) as supplemented in Department of Labor regulations (29 CFR. Part 3).

    • CONTRACT

      By submitting a bid, the bidder warrants that if the City makes an award to the bidder, bidder shall, at the option of the City, enter into a written contract with the City. This contract shall consist of the terms and conditions set forth in the solicitation, specifications, and these General Conditions and Instructions to Bidders. If no bid bond or substitute is required and bidder fails or refuses to execute the required documents within thirty (30) days after award by City, bidder shall pay to the City the difference in the amount specified in bidder's bid and the amount City shall pay to fulfill the specifications.

    • LIQUIDATED DAMAGES

      Substantial or unreasonable delays in response times, estimated time, or non-adherence thereto, in addition to any failure to meet project schedule deadlines or otherwise fail to comply with the terms and conditions of the contract shall constitute cause for the assessment of liquidated damages. Such damages shall be assessed on a per project basis based on pre-scheduled uses of the project, projected lost revenues, cost of alternative space, opportunity costs, etc. Liquidated damages shall be deducted from payments due under this scope of work.

    • ALTERATIONS/CORRECTIONS

      Any alteration, erasure, addition to or omission of required information, change of the specifications or bidding schedule, is made at the risk of the prospective contractor and may result in the rejection of the bid, unless such changes are authorized by the specifications.

    • Compliance with the Davis-Bacon Act

      The Contractor shall comply with the Davis-Bacon Act the Davis-Bacon Act (40 U.S.C. 276a to 276a-7) as supplemented by Department of Labor regulations (29 CFR part 5).

    • FIRM PRICE BIDS

      The City cannot allow escalation of prices during the contract term. All contracts are for fixed prices. Such statements as "interest charges applied on accounts 30 days or older" or "prices subject to revision" are considered escalation clauses. Any reference in documents submitted with a bid indicating that the prices are not firm may be cause for rejection of the bid.

    • Compliance with §103 and §107 of the Contract Work Hours and Safety Standards Act
      1. No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which the individual is employed on such work to work in excess of 40 hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty (40) hours in such workweek
      2. Violation; liability for unpaid wages; liquidated damages. In the event of any violation of the clause set forth in subparagraph (a) of this section, the contractor and any subcontractor responsible therefore shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States, for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in subparagraph a of this section, in the sum of $10 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty (40) hours without payment of the overtime wages required by the clause set forth in subparagraph a of this section.
      3. Withholding for unpaid wages and liquidated damages. HUD or its designee shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the contractor or subcontractor under any such contract or any other federal contract with the same prime contract, or any other Federally-assisted contract subject to the Contract Work Hours and Safety Standards Act with is held by the same prime contractor such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in subparagraph b of this section.
      4. Subcontracts. The contractor or subcontractor shall insert in any subcontracts the clauses set forth in subparagraphs a through d of this paragraph and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in subparagraphs a through d of this section.
    • ANTI-DISCRIMINATION

      Contractor shall not discriminate in its employment on the basis of race, color, religion, ancestry, national origin, place of birth, sex, age, disability, non-job related handicap, or sexual orientation. Contractor shall comply with the applicable provisions of the Pittsburgh Code of Ordinances, Title Six - Conduct Article V Discrimination, and any amendments thereto. Contractor also shall comply with the applicable provisions of the Americans with Disabilities Act, any amendments thereto, and any regulations issued thereunder. Contractor shall incorporate in any subcontracts which may be permitted under the terms of the contract, a requirement that said subcontractors also comply with the provisions of this section.

    • GUARANTEE

      The Contractor shall, at his cost, replace any work, materials or equipment furnished and installed by him under this contract which develops defects, except from vandalism or unusual wear and tear, within one (1) year from the date of the Final Acceptance of the work for each project. Additional warranties of specific materials and systems will be required of the Contractor on a per project basis and will be so noted in the Director’s requested scope of work. Please note that in some cases, warranty periods may commence prior to final inspection, pursuant to issuance of certificate of substantial completion.

    • COLLUSION BETWEEN BIDDERS

      If the City develops reason to believe that a single prospective Contractor is involved in the submission of more than one proposal for the same project, which is sufficient cause for rejection of all proposals in which collusion between bidders is suspected.

    • CONTRACTOR TO BE QUALIFIED AND RESPONSIBLE

      Before any agreement is awarded subsequent to the execution of this Contract, prospective Contractors must satisfy the City that they have the requisite organization, capital, plant, ability and experience to satisfactorily perform the work under this Contract in accordance with the terms and conditions herein and in conformity with the best modern practices and industry standards. Award shall be made to the lowest responsible bidder on an item by item or low total basis as the City determines is in its best interests. Bidders should be mindful that the lowest-priced bidder may not be the lowest responsible bidder. “Lowest responsible bidder” is defined in Pittsburgh’s City Code and via established case law.

    • REJECTION OF BIDS

      The City reserves the right to reject, for any reason, any or all bids if it is in the best interest(s) of the City to do so.

    • GENERAL INSTALLATION REQUIREMENTS
      1. Installation shall be of a quality not less than is accepted as industry standard for any trade covered herein.
      2. All materials furnished under this contract must be determined safe by nationally recognized testing laboratory, such as Underwriter’s Laboratories Inc., or Factory Mutual Engineering Corporation. All material shall be labeled, certified, or listed by such laboratory.
    • Reports and Information

      The Contractor, at such times and in such forms as the City of Pittsburgh may require, shall furnish the City of Pittsburgh such periodic reports as it may request pertaining to the work or services undertaken pursuant to this Contract, the costs and obligations incurred or to be incurred in connection therewith, and any other matters covered by this Contract.

    • Patent Rights

      No discovery or patent rights arising from any discovery or invention which arises or is developed in the course of or under this contract shall be exercised by or on behalf of the contractor.

    • TESTING

      Testing of materials may be required by the Director. Any material or equipment, which is found to be defective during the tests, shall be removed and replaced with new by this Contractor at no additional cost to the City unless it is found that this condition was caused by the City of Pittsburgh in which event the City shall be responsible for the payment of said costs..

      STORAGE OF MATERIALS AND EQUIPMENT

      1. The Contractor will be required to storeall material and equipment in a location, which will not interfere with the normal operations of other contractors or employees of the City, and in a manner which will affordsuch items maximum protection. The City will not guaranty the security of nor be responsible for loss, damage or theft of stored materials or equipment in a City facility. Security of materials and equipment is the Contractor's responsibility. The Contractor shall replace such items, as required, at Contractor’s own expense.
      2. When City owned equipment is removed from any part of the building it shall be taken down with due care in a workmanlike manner, the parts shall be marked for identification, and the whole shall be stored in the City’ stock in the Contractor'’ premises. Subject to further orders of the City, the Contractor may be directed to transport the material directly to a City storage area.
      3. At the end of each project, a list of all City owned equipment in the possession of the Contractor shall be sent to the Director or Director’s designee. Said equipment shall be returned, at the Contractor’s expense, to the City yard or as directed by the Director or Director’s designee.
    • UNIQUE BIDS

      Each bidder may only submit one (1) bid on behalf of the organization and all subsidiaries.

    • PAYMENT UNDER AGREEMENT

      It is the intent of the City to pay all invoices resulting from work performed under an agreement within forty-five (45) calendar days from invoicing. The City CANNOT pay any INTEREST CHARGES or LATE PAYMENT CHARGES. Any inclusion of such charges may disqualify the proposal from award consideration and/or will be disregarded by the City.

      Invoices for payment must be received within thirty (30) calendar days of the completion of work or delivery. City reserves the right to reject, not pay, or reduce total compensation for all invoices that are submitted more than 30 days after delivery of goods or completion of services.

    • Copyright

      No report, maps, or other documents produced in whole or in part under this Contract shall be subject of an application for copyright by or on behalf of the Contractor.

    • NOTICE OF AWARD

      Regardless of any notification of award to any prospective Contractor, all bids remain open and acceptable by the City for ninety (90) days from the bid opening date. Nothing in this paragraph is to be considered a waiver of the City's rights against a prospective Contractor who fails to execute a contract once it is awarded.

    • PROTECTION OF WORK
      1. This Contractor shall be held responsible for the protection of the General Public as well as City personnel during construction. Appropriate protection shall include but not be limited to erection of barricades, screens, or other such enclosures/precautions to protect other portions of the site or building from dust, fumes and all other construction debris within the construction area.
      2. Protection of all work prior to the final acceptance is also the Contractor’s responsibility. Contractor shall repair or replace any work damaged before final acceptance at Contractor’s sole expense.
    • Access to Records

      The City of Pittsburgh, or any of its duly authorized representatives, shall have access to any books, documents, papers and records of the Contractor which are directly pertinent to this specific contract, for the purpose of audits, examinations, and making excerpts and transcriptions during and for up to three (3) years following the termination of this Contract or completion of the work, whichever is later.

    • COMPLIANCE WITH PENNSYLVANIA "RIGHT TO KNOW" LAW; SUPERFUND

      The City of Pittsburgh is obligated to comply with the Pennsylvania Worker and Community Right to Know and Superfund Amendments and Reauthorization Act (“SARA”) Title III laws. Successful Contractors, where applicable, must submit a Material Safety Data Sheet (“MSDS”) for hazardous chemicals.

       

      Submit all Material Safety Data Sheets to:

       

      Office of Management & Budget, Procurement

      Room 502, City-County Building

      414 Grant Street

      Pittsburgh, PA 15219

       

    • RESTORATION AND MAINTENANCE OF SURFACES
      1. The Contractor shall adequately protect adjacent work, existing or new. Contractor shall restore all materials including site paving, other site improvements, landscaping, exterior building components and surfaces, interior building components, equipment and surfaces which may have been damaged through Contractor’s activities to a condition equal to that before work began, furnishing all labor and material required at Contractor’s sole cost.
      2. During the installation, removal, repair, or maintenance of equipment under this contract, it may be necessary for the Contractor to move, remove, or relocate signs, fences, barriers, or other objects in order to gain access to existing equipment or to the proposed equipment site. The Contractor shall perform such duties at no additional charge and shall restore the site to its original condition.
      3. The Contractor shall not injure trees. Trimming of trees in connection with the work or access to the work site shall be done only under the supervision of a City Inspector. However, the Contractor shall not be required to trim trees except at the time of the installation of new work or repair and maintenance of existing work.
    • PRICE LISTS AND CATALOGUES

      When price lists are required for a proposal, they are submitted with the bid for the sole purpose of providing an audit reference for the various items on the price list and the manufacturer's price for each item. Price list pricing, as the price list and pricing is stated in the contract, will remain firm for the duration of the contract regardless of manufacturers’ price list changes that may occur during the term of the contract, unless otherwise agreed in the contract. Any reference, which may appear on any price list, to any terms and conditions, such as F.O.B. shipping point or prices subject to change, will not be part of any contract with successful bidders and will be disregarded by the City. Any attempts to enforce such terms and conditions will be considered a material breach of the contract and may result in termination of the contract. Contractors agree to supply the using departments of the City with copies of additional catalogues and price lists as requested.

    • CUTTING, FITTING AND PATCHING
      1. The Contractor shall do all cutting and fitting of all work that may be required to make the related parts come together properly to receive or be received by other parts of the work. Contractor shall also do such patching of related parts and assemblies that may be required as a result of cutting and fitting work.
      2. Contractor shall not endanger the stability of existing structures or any part thereof by cutting, digging or other operations. Contractor shall not cut or alter any structural components in any way save with the written consent and under direction of the Director or Director’s designee.
      3. All patching shall be performed by skilled labor in the trade that originally erected the work. Patching shall be performed so as to restore any parts to their original condition prior to the work or better. All patching shall be performed to the satisfaction of the City.
    • Records and Audits

      The Contractor shall maintain accounts and records, including personnel, property, and financial records, adequate to identify and account for all costs pertaining to the Contract and such other records as may be deemed necessary by the City of Pittsburgh to assure proper accounting for all project funds, both Federal and non Federal shares. These records will be made available for audit purposes to the City of Pittsburgh or any authorized representative, and will be retained for three years after the expiration of this Contract unless permission to destroy them is granted by the City of Pittsburgh.

    • USE OF TRADE NAMES

      Bidder agrees and warrants that whenever the bidder, in its Bid, describes goods by trade name, catalog number, or "as per sample", the goods so described conform to the specifications. The unauthorized use of any patented articles is done entirely at the risk of the successful bidder.

    • CLEANUP OF PREMISES AND EQUIPMENT
      1. The Contractor shall not allow waste material or rubbish caused by work under this contract to accumulate in or about the premises, but shall promptly and thoroughly remove rubbish and tools daily from the site including immediate work area, equipment and scaffolding. The stockpile of stored material must be maintained in an orderly condition. Upon final completion, Contractor shall leave the site thoroughly cleaned and ready for use. The City of Pittsburgh may remove rubbish or perform cleanup at any time and deduct the City’s costs from the Contractor’s final payment.
      2. The Contractor shall bear all responsibility, legal or otherwise, for the environmentally safe disposal of construction debris, rubbish, and waste material. Special disposal of toxic materials and/or equipment should be specifically addressed in the Contractor's scope of work.
      3. Demolished material with salvage value shall be disposed of as instructed by the Director. Salvaged payments to the Contractor shall be returned to the City by way of a credit.
    • Compliance with §306 of the Clean Air Act and §508 or the Clean Water Act

      The Contractor shall comply with all applicable standards, orders, or requirements issued of the Clean Air Act (42 USC 1857 et. seq.), Section 508 of the Clean Water Act (33 USC 1368), Executive Order 11738, and Environmental Protection Agency regulations (40 CFR, Part 15) prohibiting the use of facilities included on the EPA List of Violating Facilities.

    • Energy Efficiency

      The Contractor shall comply with mandatory standards and policies relating to energy efficiency which are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act (Public Law 94-163).

    • INDEMNIFICATION

      Contractor hereby agrees to indemnify, save and hold harmless, and defend City, its officers, agents and employees from and against all liens, charges, claims, demands, losses costs, judgments liabilities, and damages of every kind and nature whatsoever, including court costs and attorney’s fees arising by reason of: the performance by Contractor of any services under this Contract; any act, error or omission of Contractor or of an agent, employee or licensee of Contractor or subcontractor of Contractor; and any breach by Contractor of any of the terms conditions or provisions of this Agreement.

    • OVERTIME

      Overtime, if applicable, may be charged as a multiple of the appropriate hourly rate as per the Fair Labor Standard Act (FLSA).

      To be considered for payment, overtime must be requested and approved in writing prior to the performance of said work.

    • CONTRACTOR THOROUGHLY INFORMED AS TO WORK

      Contractor hereby affirms that s/he has read each and every clause in the advertisement, specifications and agreements relating to this work, and fully understands the meaning of each, and hereby agrees that s/he will comply with all the terms, covenants and agreements herein set forth; and that s/he fully understands the character of the work to be performed under this contract.

    • EQUIPMENT
      1. Cost of equipment rental (rate per hour) shall be based on direct cost as per rental company invoice
      2. Contractor will not reimbursed for the use of equipment which is normal, necessary, and basic to the performance of any trade covered herein.
      3. Non-motorized vehicles including wheelbarrows, carts, etc. and hand tools including electric motor operated hand tools, portable pipe threaders, torches for welding, cutting and soldering together with associated gas and oxygen tanks shall be considered as part of Overhead cost and will not be compensated separately.
      4. Trucks and trailers used for hauling, transporting or delivery of personnel, equipment and/or supplies shall be considered as part of Overhead and will not be compensated for separately. All truck and passenger car time, other than that specifically pre-authorized and shown on the project estimate for removal of debris, shall be considered an Overhead cost and as such, is not billable.
      5. Any costs arising from failure to expeditiously return any rental equipment shall not be compensated by the City but rather be at the sole expense of the Contract. Where the rental of exceptionally high bucket trucks is pre-approved by the City of Pittsburgh, the Contractor will be required to schedule such work in an efficient manner and may be required to work more than one shift to complete such work in the shortest time frame practicable. Contractor must return said rental equipment expeditiously.
    • Compliance with All Other Laws

      The Contractor shall comply with all applicable laws, ordinances, codes, and administrative regulations of the Federal, State and, Local governments which are or become applicable to the work done under this Contract.

    • SETTLEMENT OF DISPUTES

      It is expressly covenanted and agreed that in the event of a disagreement or controversy arising between the Contractor and the City as to the interpretation, specifications, or proper execution of this contract, or as to settlement thereunder, or in the event any disagreement, as to any dispute under this contract or the work involved, such dispute shall be brought immediately to the City’s attention in writing. The City shall decide upon the dispute and such decision shall be final and conclusive, as to all matters in controversy, without exception or appeal, and all right(s) of action at law, in equity or otherwise, under and by virtue of this contract are hereby expressly waived.

    • Interest of Member of the Governing Body

      No member of the governing body of the City of Pittsburgh and no other officer, employee, or agent of the City of Pittsburgh, who exercises any functions or responsibilities in connection with the planning and carrying out of the program, shall have any personal financial interest, direct or indirect, in this Contract; and the Contractor shall take appropriate steps to assure compliance.

    • ADDITIONAL TERMS
      1. The City may, at its discretion, supply some or all materials required by the Contractor. Quantity estimates for said material will be the responsibility of the Contractor.
      2. Use of any individual subcontractor must be identified on each project estimate and approved by the Director. Such usage shall be permitted only where the subcontracted work is minor, a specialty trade, incidental to the total project, and/or more costime effective than other means available. Contractor shall provide a justiciation for Subcontractor usage on the project estimate. Subcontractor’s labor rates including overhead and profit for common labor classifications that are the same as those listed in the solicitation, may not exceed the hourly labor rates bid under that section for that particular trade. Billing rates for unlisted common and specialty labor may not exceed Industry Standard rates for that trade and must be previously and specifically approved by the Director via the Letter of Acceptance (LOA). Payroll verification for unlisted common and specialty labor must be submitted with an invoice. Unapproved or unverified common or specialty labor payroll billings will be paid at the lowest contractor’s labor rates as listed in the solicitation. Subcontractors invoice must be broken down by personnel (rate and hours worked), materials and equipment just as the Contractor’s breakdown. Failure to do so may delay, reduce, or waive payment. Contractor and any subcontractor must provide, as requested by City, any supporting documentation or information for City’s verification of the invoice.
      3. The City may require the Contractor to provide satisfactory verification (i.e., certification, employment history) of tradesperson’s experience and abilities. The inability to do this shall be grounds for that tradespersons removal from participation in the work on City projects. Contractor shall remove and replace said tradespersons at no cost or expense of the City. Should the Contractor fail to remove said individual from City projects when so requested by the Director, the city reserves the right to immediately terminate this contract.
    • ASSIGNMENT; SUBCONTRACTING

      Contractor shall not assign this contract or any right to monies to be paid hereunder without the written consent of City. None of the services covered by this contract shall be subcontracted without the prior written approval of City. It is further agreed that no subcontract, if consented to, shall under any circumstances relieve the Contractor of any liabilities and obligations under this Contract, and should any subcontractor fail to perform the work undertaken in a satisfactory manner, such subcontract must be terminated immediately and ended by the Contractor upon notice of the Director so to do. The successful bidder shall be responsible to require his sub-contractors to comply with all of the insurance requirements of this agreement.

    • Interest of Other Local Public Officials

      No member of the governing body of the locality and no other public official of such locality, who exercises any functions or responsibilities in connection with the planning and carrying out of the program, shall have any personal financial interest, direct, or indirect, in this Contract; and the Contractor shall take appropriate steps to assure compliance.

    • HOME RULE CHARTER: LIABILITY OF CITY

      This contract is subject to the provisions of the Pittsburgh Home Rule Charter; and the liability of City thereunder is limited to amounts authorized by Resolutions of Pittsburgh City Council.

    • Interest of Contractor and Employees

      The Contractor covenants that he presently has no interest and shall not acquire interest, direct, or indirect, in the study area or any parcels therein or any other interest which would conflict in any manner or degree with performance of his services hereunder. The Contractor further covenants that in the performance of this Contract, no person having any such interest shall be employed.

    • PREVAILING WAGE ORDINANCE

      The Contractor agrees that section 161.16(e) of the Pittsburgh Code of Ordinances, stating that the Contractor shall pay at least the applicable prevailing wages as shall have been determined by the City Controller pursuant to the City of Pittsburgh Service Worker Prevailing Wage Ordinance, Title I, Article VII, Section 161.38(I)(B), and as shall have been determined by the Secretary of Labor and Industry to the workers employed in the performance of any contract for public work subject to the Pennsylvania Prevailing Wage Act approved August 15, 1961 (Act No. 442), as amended August 9, 1963 (Act No. 342), and the regulations issued pursuant thereto, and all supplements and amendments thereto, shall be made a part of this agreement as fully as if attached hereto, and that s/he will comply in all respects with the provisions thereof, insofar as the same affects this contract.

    • Amendment

      This agreement contains all the terms and conditions agreed upon by the parties hereto, and no other agreement, oral or otherwise, regarding the subject matter of this agreement, shall be deemed to exist or to bind any of the parties hereto. This agreement may not be changed, modified, discharged, or extended except by written amendment, duly executed by the parties.

    • ANTI-SWEATSHOP PROVISIONS

      The Contractor certifies that none of their goods or products were made under sweatshop conditions as defined in § 161.02(e) of the City Code. If the City is presented with information that would lead the City to reasonably believe that the Contractor or its suppliers may be obtaining goods or products for sale, re-sale, lease or rental to the City that where made under sweatshop condition, upon request of the City, Contractor shall disclose information, data and materials reflecting Contractor’s practices as they pertain to the procurement and manufacturing of goods/products in compliance with the Anti-sweatshop provisions of Pittsburgh Code Section 160.02.

    • Personnel
      1. The Contractor represents that he has, or will secure at his expense, all personnel required in performing the services under this Contract. Such personnel shall not be employees of or have any contractual relationship with the City of Pittsburgh.
      2. All of the services required hereunder will be performed by the Contractor or under his supervision and all personnel engaged in the work shall be fully qualified and shall be authorized or permitted under State and Local law to perform such services.
      3. None of the work or services covered by this Contract shall be subcontracted without the prior written approval of the City of Pittsburgh. Any work or services subcontracted hereunder shall be specified by written contract or agreement and shall be subject to each provision of this Contract.
    • Assignability

      The Contractor shall not assign any interest on this Contract, and shall not transfer any interest in the same without the prior written consent of the City of Pittsburgh.

    • WORKERS COMPENSATION

      Contractor hereby agrees to perform the work described in this Contract in accordance with the terms herein and further certifies that it has accepted the provisions of the Worker's Compensation and Occupational Disease Acts, as amended and supplemented, insofar as the work covered by this contract is concerned, and that it has insured its liability thereunder in accordance with the terms of the said Acts, as evidenced by the certificate of insurance it has caused to be attached hereto, or will file with the Director of the Office of Management and Budget before the execution of this Contract, a certificate of exemption form for insurance from the Bureau of Workmen’s Compensation of the Department of Labor and Industry.

    • Supervision

      The Contractor will supervise and direct the work. He will be solely responsible for the means, methods, techniques, sequences and procedures of construction. The Contractor will employ and maintain on the work a qualified supervisor or superintendent who shall have been designated in writing by the Contractor or the Contractors representative at the site. The supervisor shall have full authority to act on behalf of the Contractor and all communications given to the supervisor shall be a binding as if given to the Contractor. The supervisor shall be present on the site at all times as required to perform adequate supervision and coordination of the work.

    • COMPLIANCE WITH LAWS

      Contractor shall fully obey and comply with all Federal, State and Local laws, statutes, ordinances, resolutions, and administrative regulations, which are or should be applicable to any work performed under this Contract. Contractor agrees to maintain throughout duration of the contact, all necessary city, county and state licenses and approvals as applicable (including required professional licenses and exams), and to immediately notify the City of Pittsburgh, Office of Management & Budget of any loss or changes of licenses and approvals.

    • GOVERNING LAW

      The contract that is formed subject to these articles of Agreement will be construed and interpreted in accordance with the laws of the Commonwealth of Pennsylvania.

    • Claims Against Contractor

      The Contractor shall indemnify, save, and hold harmless the City of Pittsburgh or its agents from all claims, liens, charges, claims, demands, losses, costs, judgments, liabilities, and damages of every kind and nature, including court costs and attorney fees arising by reason of:

      1. performance by Contractor of any services under this Contract;
      2. any act, error or omission of Contractor or its agents, employees, licensees, contractor or subcontractors;
      3. any breach by Contractor of the terms of this Contract;
      4. any lawful demands of Contractor or subcontractor's laborers, workmen, mechanics, material persons, and furnishers of machinery and parts thereof, equipment, tools, and all supplies, incurred in the furtherance of the performance of the work.

      The Contractor shall, at the City of Pittsburghs request, furnish satisfactory evidence that all obligations in subsection (d) designated above have been paid, discharged, or waived. If the Contractor fail to do so, the City of Pittsburgh, may, after having notified the Contractor, either pay unpaid bills or withhold from the Contractor's unpaid compensation a sum of money deemed reasonably sufficient to pay any and all such lawful claims until satisfactory evidence is furnished that all liabilities have been fully discharged whereupon payment to the Contractor shall be resumed, in accordance with the terms of the Contract, but in no event shall the provisions of this sentence be construed to impose any obligations upon the City of Pittsburgh to either the Contractor or any third party. In paying any unpaid bills of the Contractor, any payment so made by the City of Pittsburgh shall be considered as a payment made under the Contract Documents by the City of Pittsburgh to the Contractor and the City of Pittsburgh shall not be liable to the Contractor for any such payments in good faith.

       

       

    • No Lien

      The Contractor agrees not to file a lien or bond claim on the project, and waives any rights to file a lien or bond claim.

    • DEBARMENT

      Contractor warrants that it is not prohibited from entering into this Contract with the City by reason of disqualification under subsection (b) of Section 161.22 of the Pittsburgh Code. A document certifying compliance with this Section is attached hereto as an Exhibit and incorporated into and made a part of this Contract.

    • STATEMENT OF AFFILIATIONS

      Contractor hereby files a Statement of Affiliations with the City, attached hereto as an Exhibit, in compliance with Section 197.08(c) of the Pittsburgh Code.

    • Subcontracting

      The Contractor shall not sublet, sell, transfer or assign any portion of the contract without prior written consent of the City of Pittsburgh and after verification of the subcontractor's current eligibility status, and after submission of all certifications as required. The Contractor shall be fully responsible to the City of Pittsburgh for the acts and omissions of the subcontractor(s), and of persons either directly or indirectly employed by them, as he is for the acts and omissions of persons directly employed by him. No subcontract, or transfer of contract, shall in any way release the Contractor of his/her liability under the contract and bonds

    • Time

      1.The date of beginning and the time for completion of the work are essential conditions of the Contract Documents and the work embraced shall be commenced on a date specified in the Notice to Proceed.

      2.The Contractor will proceed with the work at such rate of progress to ensure full completion within the Contract Time. It is expressly understood and agreed, by and between the Contractor and the City of Pittsburgh, that the Contract Time for the completion of the work described herein is a reasonable time, taking into consideration the average climatic and economic conditions and other factors prevailing in the locality of the work.

      3.If the Contractor shall fail to complete the work within the Contract Time, or extension of time granted by the City of Pittsburgh, the Contractor will pay to the City of Pittsburgh for liquidated damages for each calendar day that the Contractor shall be in default after the time stipulated in the Contract Documents.

    • TERMINATION

      In addition to any rights of termination set forth elsewhere in this Contract or any related agreement, the City may terminate this Contract at any time, without cause or liability, by giving Contractor thirty (30) days advance written notice of its intention to terminate.

    • Completion of Work
      1. The Contractor shall guarantee all materials and equipment furnished and work performed for a period of one year from the date of Substantial Completion. The Contractor warrants and guarantees for a period of one year from the date of Substantial Completion of the improvement that it is free from all defects due to faulty materials or workmanship, and the Contractor shall promptly make corrections as may be necessary by reason of such defects. The City of Pittsburgh will give notice of observed defects with reasonable promptness. In the event that the Contractor should fail to make repairs, adjustments, or other work which may be made necessary by such defects, the City of Pittsburgh may do so and charge the Contractor the cost thereby incurred. The Contract Bond shall remain in full force and effect through the guarantee period.
      2. When the work, including that performed by Subcontractors, is completed, the site shall be cleaned of all rubbish and debris caused by the construction. All sheds or other temporary structures, surplus materials, and equipment shall be removed and the project left in a neat and presentable condition.
    • OPTION TO EXTEND

      The City, reserves the right to extend this Contract for up to ninety (90) days after the indicated expiration date. This mechanism would be used in the event that a lapse in the current Contract occurs before a new contract can be established for the services required by the City. When applicable, an extension notice will be issued defining the exact extension of this Contract; all other terms and conditions of the current contract will remain in full force and effect.

    • Work Inspection and Payment Process
      1. Upon receiving the Notice to Proceed, the Contractor must submit to the City of Pittsburgh a cost breakdown showing the amount assigned to each portion of the work. This breakdown is not required when per unit prices form the basis of payment under the contract. This breakdown must be reviewed by the City of Pittsburgh and the architect/engineer and used as the basis for requests for payment. This breakdown should be submitted within ten (10) days of the Notice to Proceed.
      2. The construction inspectors must check for quality and quantity control. Quality control must include quality tests as necessary to verify conformance with technical specifications concerning minimum quality requirements. Quantity control must include verification of in-place quantities and other records reflecting the as-built facility.
      3. Upon completion or partial completion of agreed work, Contractor shall submit to the City of Pittsburgh a certified statement itemizing rates and charges accompanied by a written inspection report. Upon City of Pittsburghs determination of satisfactory work and receipt and approval of the statement certified, City shall pay fees monthly;
      4. Inspection reports, copies of field measurement notes, and test results used to verify contractors periods pay estimate for partial payment should be attached and filed with the periodic estimate for partial payment;
      5. Upon receipt of certificates for partial payment and necessary documentation, the locality must check Equal Opportunity and Labor Standards compliance files to ensure that all requirements have been met;
      6. Payment to the Contractor shall be made by the City of Pittsburgh , according to the following schedule (as determined by City of Pittsburgh );
      7. The City of Pittsburgh shall certify on the pay request that it approved the completed work prior to making payment. Upon receipt of an approved progress schedule from the Contractor, the City of Pittsburgh shall submit a drawdown request to the City of Pittsburgh for CDBG funds to pay the contractor. A turnaround time of 20-30 days is expected before said funds are forwarded to the City of Pittsburgh.
    • NEW MATERIAL

      Unless otherwise provided in the specifications, all goods to be supplied to the City shall be from new, unused, current stock.

    • ESTIMATED QUANTITIES

      Unless otherwise provided in the specifications, any references in the specifications to quantities of goods or frequency of services to be provided to the City are estimates, and the City reserves the right to require the successful bidder to provide more or less than the estimated quantity or frequency, or to purchase none at all.

    • Liquidated Damages
      1. Liquidated damages are a percentage of the contract price withheld from payment as insurance against breach of contract with respect to the payment of estimated labor costs.
      2. Partial payment to the contractor for labor performed under either a unit or lump sum price contract shall be made at the rate of ninety-two percent of the estimates prepared by the contractor and approved by the architect/engineer. All labor performed after the job is fifty percent completed shall be paid for at the rate of one hundred percent of the estimates submitted by the contractor and approved by the architect/engineer.
    • DELIVERY POINT AND TIME

      Unless otherwise provided in the specifications, the goods and services to be delivered or provided shall be delivered to or provided at any place or places within Pittsburgh, Pennsylvania, which the City may designate. All deliveries are to be F.O.B. point of delivery. Unless otherwise provided in the specifications, the successful bidder shall provide all goods and services within thirty (30) days from the date of the City's request therefore.

    • Permits

      Unless otherwise stated in the Bid Documents, the Contractor is responsible for obtaining and paying for all necessary permits and licenses for the proper authorities. The Contractor shall give all notices and comply with all laws, ordinances, rules, and regulations bearing on the conduct of the work as drawn and specified. If the Contractor observes that the contract documents are at variance therewith, he/she shall promptly notify the City of Pittsburgh in writing.

    • FORCE MAJEURE

      Neither Contractor nor the City shall be held responsible for losses resulting if the fulfillment of any terms or provisions of an award resulting from this Contract is delayed or prevented by unforeseeable causes including but not restricted to Acts of God, restraint of Government, or for any other causes which are unavoidable through the exercise of due care and beyond the control of the party who is to perform.

    • Insurance
      1. The Contractor shall not commence work under this Contract until he has obtained all the required insurance and such insurance has been reviewed and approved by the City of Pittsburgh. Contractor shall not allow any Subcontractor to commence work on his subcontract until all insurance required of the Subcontractor by the City of Pittsburgh has been obtained, reviewed, and approved by the City of Pittsburgh. Approval of the insurance by the City of Pittsburgh shall not relieve or decrease the liability of the Contractor.
      2. The Contractor shall file with the City of Pittsburgh all Certificate(s) of Insurance as are necessary to document the required insurance coverage, subject to the approval of the City of Pittsburgh and receipt of any additional forms/documentation requested, prior to final execution of the Contract and issuance of the Notice to Proceed. If the term of insurance expires prior to the expiration of the term of this contract or the completion of all services required hereunder, whichever shall occur later, Contractor shall renew said insurance in a timely manner and promptly deliver a certificate of insurance evidencing such renewal to the City of Pittsburgh.
      3. Worker's Compensation. Contractor certifies that it has accepted the provisions of the Workers compensation and Occupational Disease Acts, as amended and supplemented, insofar as the work covered by this Agreement. Contractor shall acquire and maintain, during the term of the Contract, Worker's Compensation insurance in full compliance with the laws of the Commonwealth of Pennsylvania, including the Workers Compensation and Occupational Disease Acts, or shall provide a proper certificate of exemption from insurance with the Pennsylvania Department of Labor and Industry.
      4. Contractor's Liability Insurance
        1. The Contractor shall acquire and maintain during the term of the Contract Bodily Injury, Including Death and Property Damage Liability Insurance from a responsible and non-assessable insurance company which shall provide and include coverage on all Contractors Operations, Contractors Protective (Sublet) Liability, Contractual Liability, Completed Operations Liability, Owned Automobiles and Non-owned and Hired Automobiles, and other applicable coverage.
        2. Property Damage Liability Insurance shall be provided on any demolition, blasting, excavating, shoring or similar operation on an "if any" or occurrence basis. Claims made policies are not acceptable.
        3. Bodily Injury Liability limits shall be for an amount of no less than Five Hundred Thousand Dollars ($500,000) for injuries, including wrongful death to any one person and subject to the same limit for each person, in an amount of not less than One Million Dollars ($1,000,000) on the account of any one occurrence. Bodily Image Liability Insurance shall include City of Pittsburgh as an additional insured.
        4. Property Damage Liability insurance shall be in an amount of not less than Five Hundred Thousand Dollars ($500,000) per occurrence. General Liability shall be extended to provide "Broad Form Property Damage Liability," in an amount of not less than One Million Dollars ($1,000,000) aggregate for damage on account of all occurrences. Property Damage Liability Insurance shall include City of Pittsburgh as an additional insured.
        5. Any combination of underlying Comprehensive General/Automobile Liability coverage with Umbrella/Excess Liability coverage which provides no less than One Million ($1,000,000) Dollars Single Limit Bodily Injury and Property Damage Liability Insurance for the Contractor will also be acceptable.
        6. The City of Pittsburgh may adjust the liability limits to coincide with local government procurement policies and practice within the limits of state and local law.
      5. .Builder's Risk Insurance. Each Contractor shall maintain insurance to protect himself and the City of Pittsburgh, jointly, from loss incurred by fire, lightning, extended coverage hazards, vandalism, theft, explosion and malicious mischief in the full amount of the Contract and such insurance shall cover all labor and material connected with the work, including materials delivered to the site, but not yet installed.
      6. Installation Floater Insurance. When a contractor is involved solely in the installation of materials and not in the construction of a building, an Installation Floater is required in lieu of a Builder's Risk Policy with the same general conditions applying as set forth in Paragraph E.
      7. The Policies as listed above shall all contain all the following special provisions:
        1. "The Company agrees that thirty (30) days prior to cancellation or reduction of the insurance afforded by this policy with respect to the Contract involved, written notice will be mailed to the contract City of Pittsburgh.
        2. The maintaining of such insurance as outlined herein shall in no way constitute a waiver of legal liability for damage to any adjoining buildings or their contents or the work and property of others on the site beyond the limits of insurance thus maintained. The Contractor shall hold the City of Pittsburgh free and harmless from any injury and damage resulting from the negligent or faulty performance of the Contract by the Contractor or by his/her Subcontractors.
        3. Each Contractor shall hold the City of Pittsburgh harmless from all payments for patents, either as royalty or otherwise, in the use of materials, methods, appliances, etc., that he may be in any way involved in or connected with any part of his work or the work of his Subcontractors.
        4. Prior to commencement of any work under Contract, the Contractor shall furnish four (4) copy of Declaration of Insurance as evidence of coverage.
    • Debarment

      Agency warrants that it is not prohibited from entering into this Agreement with the City by reason of disqualification under Subsection (b) of Section 161-22 of the Pittsburgh Code. An affidavit certifying compliance with this Section is attached hereto as Exhibit C and incorporated into and made a part of this Agreement.

    • PIGGYBACKING

      It is understood that the goods and services described in the specifications may be purchased by the City and any other municipal bodies as set forth in the specifications and bidder agrees to supply the goods and services to the municipal bodies on the same terms and conditions as if they were to be supplied to the City. To the extent that the municipal bodies purchase goods or services, then the municipal bodies, and not the City, shall be liable to the bidder.

    • Acknowledgments

      All promotional flyers, news releases, advertisements, brochures, posters, letters, printed materials and electronic media, radio and television broadcasts associated with these activities shall include the following acknowledgment prominently displayed with other credits, This is being financed in part with a grant from the City of Pittsburgh through the Community Development Block Grant (CDBG) Program, Ed Gainey, Mayor.

       

       

    • NON-EXCLUSIVITY

      The City reserves the right at its sole discretion to utilize other contracts (such as Commonwealth of Pennsylvania or County of Allegheny contracts) for the goods or services described herein. The City also reserves, at its sole discretion, the right to solicit separately any services that may be included in this agreement.

    • Statement of Affiliations

      Agency shall file a Statement of Affiliations with the City of Pittsburgh Board of Ethics which shall include the following:

      1. A description of any contractual or other business relationship with the CITY or any of its departments, agencies, boards, commissions or authorities, including the value of the contract or business relationship entered into during the three (3) calendar years previous to the execution of this Agreement.
      2. The Agency's qualifications and experience which shall reapplied to the performance of this Agreement.
      3. An identification of the Agency's principals, including the names and addresses of all owners or partners or shareholders and officers, or, if the Agency is a public corporation, the officers, the members of the Board of Directors, and shareholders holding more than three (3) percent of the corporate stock.
      4. This Statement of Affiliations shall be included in the contract as Attachment to this Contract.
    • SAMPLES
      1. By submitting a bid, the bidder agrees to deliver to the City, at the City’s request and at no cost to the City, samples of any or all items upon which the bidder bid. Said samples shall not be returned to the bidder. Inspection or testing by the City does not constitute a waiver of any claims or rights which the City otherwise would have with respect to the quality of goods or workmanship. City shall specify the quantity of samples. If bidder inadvertently provides an incorrect sample or otherwise wishes to exchange the submitted sample with a correct sample, the bidder shall provide a detailed written explanation to the City and have a legitimate reason for the exchange. The bidder shall have only one opportunity to perform such an exchange.
      2. City, at its sole discretion, shall have the right to arrange for testing of samples to determine whether they are within bid specification. City shall indicate to bidder that it desires testing and advise which samples are to be tested and for what purpose. The following additional guidelines shall be followed:
        1. Laboratoryesting facility used shall be pre-approved by City;
        2. Suppliers shall be solely and fully responsible for the expenses of testing regardless of whether or not the tested sample(s) meets specification;
        3. City and bidder shall immediately communicate upon City’s request for testing to determine which laboratoryesting facility shall be used, as well as the time frame in which tests are to be conducted and reported to City;
    • Reversion of Assets

      Upon expiration of this agreement, pursuant to 24CFR 570.503 (b)(7), the Contractor shall transfer to the City of Pittsburgh any CDBG funds on hand at the time of expiration and any accounts receivable attributable to the use of CDBG funds. Such transfer shall occur within thirty (30) days of termination. AGENCY shall give a check made payable to Treasurer, City of Pittsburgh to the City of Pittsburgh. At the expiration of this agreement, pursuant to 24 CFR 570-503 (b)(7), any real property in the Contractors control that was acquired or improved in whole or part with CITY CDBG funds in excess of $25,000.00 must either:

      1. Be used to meet one of the national objectives listed in 24 CFR 570.208 until five (5) years after expiration of this agreement, or for such longer period of time determined to be appropriate by City of Pittsburgh; or
      2. If not used in accordance with paragraph (a), Contractor shall pay City of Pittsburgh an amount equal to the current market value of the property less any portion of the value attributable to expenditures of non-CDBG funds for the acquisition of, or improvement to, the property. Such transfer shall occur within thirty (30) days of termination. Contractor shall give a check made payable to Treasurer, City of Pittsburgh to the City of Pittsburgh. Pittsburgh Homer Rule CharteR: This Contract is subject to the provisions of the Pittsburgh Home Rule Charter.
    • PRE-PRINTED TERMS AND CONDITIONS

      Bidder’s pre-printed Terms and Conditions or restrictions commonly appearing on the reverse side of letters submitted with the bid and/or bidder’s specifications material and contract documents shall be disregarded and have no effect

    • STEEL PRODUCTS

      In accordance with Act 3 of the 1978 General Assembly of the Commonwealth of Pennsylvania, approved March 3, 1978, if any steel products are to be used or supplied in the performance of the contract, only steel products produced in the United States of America, as defined therein, shall be used or supplied in the performance of the contract.

    • Federal Funds

      City of Pittsburgh shall incur no obligation or duty to make any disbursement whatsoever under this Agreement until, pursuant to the Metropolitan Entitlement Grant Agreement under Title I of the Housing and Community Development Act of 1974 as amended, federal funds are received by City of Pittsburgh for said disbursements.

       

       

    • Federal Grant Requirements

      Contractor shall comply with all applicable provisions of the laws, regulations and Executive Orders cited, and agrees to be subject to all other applicable requirements and provisions set forth in Circular No. A-110, Grants and Agreements with Institutions of Higher Education, Hospital and other Nonprofit Organizations, Circular A-122, Cost Principles for Nonprofit Organizations and OMB Circular A-133, Audits of Institutions of Higher Education and Other Non-Profit Institutions.

    • EXAMINATION OF FINANCIAL RECORDS

      Contractor shall maintain books, program and financial records, documents and other evidence pertaining to costs and expenses related to this Agreement in such detail as will properly reflect all costs of labor, materials, equipment, supplies, services and other costs and expenses of whatever nature for which City funding has been provided under the provisions of this Agreement. The Contractor shall maintain such books, records, documents and other materials in accordance with Generally Accepted Accounting Principles, where applicable. The Contractor shall provide access, during normal business hours, to such books, program and financial records, documents and other evidence upon request of the Mayor, the City Controller, or their designees upon receipt of reasonable advance notice, either oral or written. Contractor’s books, records, program and financial records, documents and other evidence pertaining to services provided under this Agreement shall be preserved and made available for a period of three (3) years following the termination of this Agreement. The Mayor, the City Controller, or their designees may audit, examine, review, photocopy, and/or make excerpts or transcripts of any of Contractor’s books, records, program and financial records, documents and other evidence. Any deficiencies noted in any audit reports or otherwise must be fully resolved by the Contractor, to the City’s sole satisfaction, within thirty (30) days after the Contractor’s receipt of written notice of such deficiencies. Failure of the Contractor to comply with the provisions set forth in this paragraph may constitute a violation of this Agreement and, at the City’s sole discretion, may result in the City withholding future payments.

    • Prohibition of Lobbying

      No federal appropriated funds have been paid, or will be paid, by Contractor to any person for influencing or attempting to influence an officer or employee of any agency, a member of Congress, an officer or employee of Congress, or an employee of a member of Congress in connection with the awarding of any federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment or modification of any federal contract, grant, loan, or cooperative agreement. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. Contractor hereby agrees that all subcontracts under this Agreement shall include this certification

    • AUTHORIZATION

      This Agreement is entered into by the City of Pittsburgh pursuant to City Code § 161.01A and subsequent authorizing resolution.

    • Interruption: Postponement: Abandonment

      In the event the work herein contemplated, or any part thereof, shall be interrupted, postponed, or abandoned due to circumstances which City of Pittsburgh considers to be to its best interests, AGENCY shall not be entitled to any further payment for such work or part hereof beyond and in excess of the amount due at that time, and final payment shall be based on the actual time spent to such date.

    • REQUIRED CONTRACT CERTIFICATIONS/NOTIFICATIONS

      Non-Collusion Affidavit: Affidavit should state that the bid or proposal is genuine, is not done in the interest or on behalf of any unnamed person, and that the bidder has not conspired with or solicited another company to create a fake bid for comparative purpose, has not asked competitors to refrain from bidding, and has not conspired with a competitor or other company to create an unfair advantage over other bidders

      Delinquent Tax Certification: Bidders must warrants that any and all taxes or municipal claims that may be payable to the City of Pittsburgh by Bidder are current and not delinquent. If City of Pittsburgh determines Bidder has an outstanding delinquency or if any taxes and claims become delinquent and owing during the term of this contract or prior to final payment by City of Pittsburgh, Bidder grants City of Pittsburgh the right to offset the indebtedness against any amounts owing to Bidder under the terms of this contract. City of Pittsburgh reserves the right to apply offset payments in whatever manner it deems appropriate.

      Workers Compensation Certification: Pennsylvania law requires bidders who operate within the state to provide workers compensation coverage for their employees. A certificate of premium paid must be retained with the contract document.

      Handicapped Access Certification: Upon completion of the working drawings, the architect or engineer shall execute a certification to the effect that applicable standards of accessibility by the handicapped. If the project is exempt from these standards, the basis for this exemption must be specified. This certification must be co-signed by a local official.

      Attorneys Review Certification: For procurement of construction costing over $5,000, the contract documents must be reviewed in their entirety by the City of Pittsburghs attorney prior to contract signing to ensure compliance with applicable law. The City of Pittsburgh reserves the right to review the package to ensure inclusion of all applicable CDBG terms and conditions.

      Auditors Certification: The availability of funds for the contract must be certified by the localitys financial officer.

      Notice of Award:

      Notice to Proceed:

      Bid Bonding/Guarantees: A bid guarantee shall be in the form of either a surety bond, certified check, cashiers check, or letter of credit in the amount of five percent of the bid, and a contract bond/performance bond or letter of credit for the full amount of the contract including all items of overhead.

      Timelines: Bid proposal after the time and date specified in the notice will not be considered.

    • Bid Bond

      Guarantees should be in the form of a surety bond, certified check, cashier’s check or letter of credit in an exact dollar amount equal to five percent (5%) of the bid. For example, a total bid of $100,000.00 should have a bid guarantee in the amount of $5,000.00.

       

      Please mail/deliver bid bonds to:

      City of Pittsburgh Procurement

      414 Grant Street, Room 502

      Pittsburgh, PA 15219

       

       

    • Performance Bond

      A performance bond in the full amount of the project is required from the winning vendor for this solicitation.

    Submission Requirements

    • Equal Opportunity Review Commission (EORC) Participation Form (required)

      Please download the below documents, complete, and upload.

    • Bonds (required)

      Please upload your Bond(s) here.

      Hard copies should be mailed to: City County Building, 414 Grant Street, Room 502, Pittsburgh, PA 15219.

       

       

    • Do you agree with the City's Terms and Conditions? (required)
    • Community Development Required Documents (required)

      Please upload the required documents from Community Development Block Grant (CDBG) Supplemental Conditions

    • Do you agree to the Federal Funding Terms and Conditions (required)
    • Vendor Contact Sheet (required)

      Please download the below documents, complete, and upload.

    • W-9 (required)

      Please download the below documents, complete, and upload.

    • Vendor Registration Form (required)

      Please download the below documents, complete, and upload.

    • Statement of Affiliation (required)

      Please download the below documents, complete, and upload.

    • Authorized Signor (required)

      Provide the name, title, & email address of the authorized signor for your company (for details on who is considered an authorized signer, please look at our terms & conditions section)

    • Acknowledgement of minimum (3) years of documented experience in imaging and mailing services. (required)
    • Verification will be required by copy of U.S. Postal Service statement of mailing first class presort or presorted standard with postage permit imprint. (required)

      Please upload verification.

    • Reference List (required)

      Vendor must provide reference list of other customers and volume of mailing services.

    • Will you need Federal Funding Supplemental Conditions (required)

      If you will need Federal Funding (CDBG, ARPA, etc.) Supplemental Condition please mark yes.

    • Do you require any bonds? (required)

      Click all that apply

    • Is this a Construction Project? (required)

      If yes, Construction terms will be added to all applicable sections

    • Would you like to create a electronic pricing table? (required)

    Key dates

    1. March 31, 2026Published
    2. April 21, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.