SLED Opportunity · MISSOURI · CITY OF MARYVILLE, MISSOURI
AI Summary
The City of Maryville, Missouri, is soliciting bids for a new 4 MGD water treatment plant with biofiltration and ozone treatment to improve water quality. Construction includes site work, utilities, mechanical and electrical systems, and specialized equipment installation, starting April 2026 for about two years.
The City of Maryville is moving forward with a major water infrastructure improvement to enhance the reliability and quality of the community’s drinking water. The City’s existing water treatment plant draws water from Mozingo Lake, where seasonal algal blooms can create taste and odor challenges that are difficult to address with the current treatment process. To proactively address these issues and support future needs, the City has elected to construct a new 4-million-gallons-per-day water treatment plant utilizing a modern biofiltration and ozone treatment process.
The new facility will include multiple supporting components such as raw water metering, advanced treatment and filtration systems, pump stations, chemical and ozone facilities, and an administration building. Construction will involve significant site work, underground utilities, structural concrete, mechanical and electrical systems, and specialized treatment equipment installation. Construction is anticipated to begin in April 2026 and continue for approximately two years. The City will continue to share updates as the project progresses to keep residents informed about this important investment in Maryville’s water infrastructure.
Bid Documents and Packages will be uploaded to this website in January of 2026.
## Details **Bid/Project ID:** MO2505WP-A **Type of Work:** Water Treatment Plant **Pre-Bid Location:** Public Safety Building, 101 N Vine Street, Maryville, MO 64468 **Pre-Bid Notes:** This is an in-person pre-bid meeting, and it is optional. **Bid Location:** Civcast **Engineer/Publisher:** Crossland Heavy Contractors **Engineer Address:** 3252 Roanoke Road, Crossland Heavy Contractors, KANSAS CITY, MO, 64111 ## Additional Notes Indicate your interest in this project and opt in to receiving notifications when new documents are added by clicking "Start Tracking" in the horizontal menu above Summary. ## Notes 00 Equipment Supply 1 Erosion Control 2 Earthwork 3 Concrete 4 Precast 5 Yard Piping 6 Fencing 7 Misc Metals 8 PEMB Installation 9 Roofing 10 Waterproofing & Sealants 11 Coatings 12 Walk Doors & Hardware 13 Overhead Doors 14 Glass & Glazing 15 Suspended Ceiling 16 Flooring 17 Specialties 18 Ozone System & Stainless Piping 19 Process Equipment Installation 20 Process Piping 21 HVAC 22 Plumbing 23 Electrical 24 Instrumentation & Controls 25 Fire Suppression System 26 Millwork/Casework 27 Framing Insulation & Sheetrock 28 Horizontal Directional Drilling 29 Striping and SignageSLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.