SLED Opportunity · NEVADA · DOWL, LLC

    McKinney Water District Rubicon Water Main Replacement

    Issued by DOWL, LLC
    localBidDOWL, LLCSol. 140917
    Closed
    STATUS
    Closed
    due May 18, 2026
    PUBLISHED
    Apr 14, 2026
    Posting date
    JURISDICTION
    DOWL, LLC
    local
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    McKinney Water District seeks bids for trenching and installation of approximately 560 linear feet of water mains and nine 2" water service installations, including surface restoration. Estimated bid value ranges from $425,000 to $490,000 for base bid. Project awarded May 22, 2026; construction to start by July 6, 2026 with 61-day completion.

    Opportunity details

    Solicitation No.
    140917
    Type / RFx
    Bid
    Status
    Bidding
    Level
    local
    Published Date
    April 14, 2026
    Due Date
    May 18, 2026
    NAICS Code
    237110AI guide
    Jurisdiction
    DOWL, LLC
    State
    Nevada
    Agency
    DOWL, LLC

    Description

    The work generally involves trenching for water main installation, and installation of water mainand appurtenances, surface restoration at trench locations. There is approximately 545 linear feet of6” water main (C900) infrastructure and appurtenances, 15 linear feet of 8” water main (C900)infrastructure and appurtenances and nine (9) 2” water service installations with meter pits. Surfacerestoration includes permanent pavement patching and private property landscaping. Theengineer’s estimate for this project is approximately $425,000 to $490,000 for the base bid and$225,000 to $280,000 for Bid Alternate A. Estimated Bid Value: $425,000 to $490,000 (Base Bid) / $225,000 to $280,000 (Bid Alternate A) Pre-Bid Meeting Information: Yes Online Q&A: Yes Location Information: Department: DOWL Address: 901 McKinney Creek Road; Tahoma, CA County: Washoe Other Details: The project is anticipated to be awarded at the May 22, 2026 McKinney Water District Board Meeting.Following award, the Contractor will have up to 4 weeks to procure materials. The Notice to Proceedfor Construction shall be issued no later than July 6, 2026. The Contractor will have 61 calendar days tocomplete the Work in compliance with all applicable laws and regulations following the issuance of theNotice to Proceed.

    Key dates

    1. April 14, 2026Published
    2. May 18, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.