Active SLED Opportunity · CALIFORNIA · CITY OF FRESNO
AI Summary
City of Fresno seeks contractor for installation of a 1.35-mile pedestrian and cycling trail along Herndon Canal, including roadway improvements, pedestrian bridge, ADA upgrades, and amenities. Coordination with multiple agencies required.
The scope of work includes but is not limited to; installation of a 1.35-mile pedestrian and cycling trail along the Herndon Canal as part of a 7.1-mile network of trails known as the Metropolitan Trails System or Metro Trails. This trail will be constructed along the Herndon Canal from Shields Avenue and First Street to McKinley Avenue and Millbrook Avenue and will ultimately connect four additional trail segments. This will create a major trail loop in the central part of our community. This project will include minor roadway and crossing improvements, installation of a City-furnished prefabricated pedestrian bridge, ADA ramp upgrades, installation of amenities such as benches, trail lighting, drinking fountains, bicycle racks, dog waste station, signage, striping, landscaping, and irrigation. Coordination with the City of Fresno, the Fresno Irrigation District, County of Fresno, the San Joaquin Valley Air Pollution Control District, and PG&E will be required. Pre-Bid Meeting Information: Yes Online Q&A: No Location Information: Department: Capital Projects Department Address: 747 R Street2nd FloorFresno, California93721 County: Fresno License Requirements: Valid Class "A" Contractor's License issued by the State of California Other Details: SEE BID SPECIFICATIONS FOR FULL DETAILS
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.