SLED Opportunity · ILLINOIS · CITY OF NAPERVILLE, IL
AI Summary
City of Naperville seeks bids for the Mill Street Lighting Project including lighting installation, sidewalk repair, and parkway restoration. Project coordinates with utility line relocation. Bids due April 20, 2026.
The project is located on Mill Street from US Route 34 (Ogden Avenue) to Bauer Road, in the City of Naperville, DuPage County, Illinois. A location map is provided on the plans.
The work consists of furnishing all labor, materials, equipment, and other incidentals necessary for the completion of lighting installation; a lighting controller; sidewalk repair; parkway restoration; and other incidental and miscellaneous items of work in accordance with the Plans, Standard Specifications, and these Special Provisions.
The City of Naperville is installing new lighting along Mill Street in coordination with the Department of Public Utilities - Electric (DPU-E) relocation of their existing overhead electrical lines, and subsequent removal of the utility poles and lights.
The attention of bidders is called to the following changes, clarifications and/or additions/deletions to the original contract specifications and drawings and they shall be taken into account in preparing proposals and shall be part of the Contract Documents:
Please use the See What Changed link to view all the changes made by this addendum.
The City of Naperville, IL is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup. Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic bid.
The project is located on Mill Street from US Route 34 (Ogden Avenue) to Bauer Road, in the City of Naperville, DuPage County, Illinois. A location map is provided on the plans.
The work consists of furnishing all labor, materials, equipment, and other incidentals necessary for the completion of lighting installation; a lighting controller; sidewalk repair; parkway restoration; and other incidental and miscellaneous items of work in accordance with the Plans, Standard Specifications, and these Special Provisions.
| Release Project Date: | March 30, 2026 |
| Question Submission Deadline: | April 10, 2026, 12:00pm |
| Question Response Deadline: | April 13, 2026, 12:00pm |
| Bid Opening: | April 20, 2026, 2:00pm |
Please see the Attachments section for specifications and attachments.
Peter Zibble
Sr Civil Engineer
400 S Eagle St
Naperville, IL 60540
Shanel Gayle
Procurement Officer
400 S. Eagle Street
Naperville, IL 60540
Confirm that your fee proposal is not attached in your Proposal and is attached separately here.
Please download the below documents, complete, and upload.
Please download the below documents, complete, and upload.
Please download the below documents, complete, and upload.
Please download the below documents, complete, and upload.
Will there be an evaluation committee to review the proposals and score them based on weights and multiple criteria?
Select the information you would like display.
Q (Subcontractor bid form): The subcontractor bid form is another copy of the responsible bidder affidavit. Where can I download the actual subcontractor bid form?
A: The Subcontractor form has been added to the question.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.