SLED Opportunity · GEORGIA · GEORGIA
AI Summary
Construction of a 2 million-gallon concrete pre-stressed ground storage tank with foundational supports, mixing system, piping, fencing, grading, soil stabilization, driveway reconstruction, and erosion control in Calhoun, Georgia.
Under this project, the Contractor shall furnish all labor, equipment, and materials necessary to construct a two million-gallon concrete pre-stressed ground storage tank with deep foundational supports (i.e. aggregate columns), mixing system, yard piping, fencing, grading, soil stabilization, driveway reconstruction, erosion control measures, and all other miscellaneous appurtenances necessary for a complete installation. Time allotted for completion of work is 240 consecutive calendar days.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.