SLED Opportunity · CALIFORNIA · CITY OF SANTA CLARITA

    Newhall Park Pool Pump Room Replacement REBID

    Issued by City of Santa Clarita
    cityIFBCity of Santa ClaritaSol. 8526255060
    Closed
    STATUS
    Closed
    due Apr 15, 2026
    PUBLISHED
    Mar 17, 2026
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    236220
    AI-classified industry

    AI Summary

    City of Santa Clarita seeks bids for replacement of Newhall Park pool pump room including concrete work, mechanical and electrical installations, landscaping, and fencing. Project must be substantially complete by March 31, 2027. Electronic bids due April 15, 2026.

    Opportunity details

    Solicitation No.
    8526255060
    Type / RFx
    IFB
    Status
    Active
    Level
    city
    Published Date
    March 17, 2026
    Due Date
    April 15, 2026
    NAICS Code
    236220AI guide
    Agency
    City of Santa Clarita

    Description

    The City is seeking services for the replacement of the existing pool pump room. Project consists of selected concrete flatwork, and identified pool equipment. Alternate Bid Schedule items include relandscaping of the existing site with turf and trees, and perimeter fencing, and a new pump. The construction of the replacement pool pump room shall be substantially completed by March 31, 2027, to allow for the pool to resume use for the opening of summer pool programming. **Project Type**: IFB - Invitation for Bid (Formal) **Source ID**: PU.MU.USA.1480380.C14306401 **Piggyback Contract**: No **Question Acceptance Deadline**: 04/03/2026 02:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: CIP **Reference Number**: 0000416484 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Proposal Form | Proposal Form | Yes | No | | Notice to Bidders | Notice to Bidders Regarding Contractual Requirements | Yes | No | | Alternate Bid Schedule | Alternate Bid Schedule | Yes | No | | Bidder’s Information and Certification | Bidder’s Information and Certification | Yes | No | | Bidder’s Questionnaire | Bidder’s Questionnaire | Yes | No | | Bidder’s Pre-Qualification Questionnaire | Bidder’s Pre-Qualification Questionnaire | Yes | No | | Certification of Non-Segregated Facilities | Certification of Non-Segregated Facilities | Yes | No | | Designation of Subcontractors | Designation of Subcontractors | Yes | No | | References | References | Yes | No | | Iran Contracting Act Certification | Iran Contracting Act Certification | Yes | No | | Non-Collusion Affidavit | Non-Collusion Affidavit | Yes | No | | All signed addendums (if any) | All signed addendums (if any) | No | No | | General Attachments | General Attachments | No | No | **Pre-Bidding Events**: Event Type: Job-Walk Visit | Attendance: Recommended | Event date: 03/25/2026 01:00 PM EDT | Location: Newhall Park - 24907 Newhall Avenue, Santa Clarita, CA 91321 | Event Note: PRE-BID MEETING AND JOBWALK. A non-mandatory, pre-bid meeting to discuss the required scope of work will be held at 10:00 AM (PT) on March 25, 2026, at Newhall Park Aquatics, 24907 Newhall Avenue, Santa Clarita, CA 91321. **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next P2021 Next Bid Schedule-Line Items STANDARD Code Description UOM Qty 1 Mobilization, Site prep (identify all components for ‘selective demolition’ – pool equipment, concrete, mechanical, electrical, underground utilities; Pool Deck Protection measures); Required Permit(s); Required insurances Lump-Sum 1 2 Pool Plaster Protection Measures Lump-Sum 1 3 Equipment Relocation Cost (remove, store, re-install saved equipment) Lump-Sum 1 4 Demolition and hauling of existing landscaping Lump-Sum 1 5 Demolition and hauling of vertical structures (including, but not limited to: existing pump station building and footing, chain-link fences, existing canopy above chemical tanks, storage shed, and gates) Lump-Sum 1 6 Demolition and hauling of the concrete slab sections (per callout D1 and D9 on sheet D1.0 of the plan set) Lump-Sum 1 7 Demolition and hauling of electrical materials (including, but not limited to: electrical panels, wires, conduits, lights, receptacles, and junction boxes) (Sheets E1.0D & E2.0D) Lump-Sum 1 8 Demolition and hauling of mechanical materials/systems (including, but not limited to: pipes, valves, fittings, chemical tubing, backwash pit, and pipe supports) Lump-Sum 1 9 Renovate Inside of Existing Wet Well [Interior Roof, Interior Walls, Interior Floor Slab] – includes repairing spalled concrete, crack repairs (Detail 12/Sheet S0.3), and the application of a waterproof coating on the interior floor and walls (Xypex or approved equal) Square Foot/Feet 875 10 Site grading per plan (Including landscape grading and site preparation for concrete footings and flatwork) Lump-Sum 1 11 Containment Wall (Retaining Wall and curb for grade change) Linear Foot/Feet 45 12 Pump Station Floor Drains (per plans) Each 5 13 Concrete Flat Work (including, but not limited to: concrete slab, housekeeping pads, walkway, concrete deck, chemical containment curbs) Square Foot/Feet 1020 14 Wet well regrading (Sheet C2.0 and per Detail B sheet C3.2) Square Foot/Feet 280 15 CMU Building (including, but not limited to: Concrete Foundation/Slab, Structural Walls, Fiberglass Doors, Roof, Roof Drains, Footing, Roll-up Door) Square Foot/Feet 1300 16 Covered Canopy Structure (including, but not limited to: steel beams, steel columns, fiber-cement siding, shade structure, and cantilevered shade structure at front of pump station) Lump-Sum 1 17 Access Hatch in Roof for Vertical Turbine Pump Removal Each 1 18 Wet Well Access Hatch Each 1 19 10” Insulated Heater Pipe Linear Foot/Feet 45 20 14” Insulated Heater Pipe Linear Foot/Feet 15 21 8" Pipe Linear Foot/Feet 80 22 6" Pipe Linear Foot/Feet 20 23 4" Pipe Linear Foot/Feet 40 24 3" Sewer Drain Pipe Linear Foot/Feet 80 25 2" Water Line Connection Linear Foot/Feet 120 26 Gas Line Connection Linear Foot/Feet 40 27 Valves and Fittings Lump-Sum 1 28 Backwash Piping and Associated Piping (including, but not limited to: backwash standpipe, 10-inch DWV pipe, and fittings) (Sheets M2.1 and M4.1) Lump-Sum 1 29 Heater Intake and Exhaust Pipe (including, but not limited to: 10” PVC intake pipe, 14” Double-wall Type B Vent, Insulated Wall Fittings, and Vent Cap) Lump-Sum 1 30 Water Level Sensor Each 1 31 Flow Meter and Associated Transmitter (Sheet M4.2) Each 1 32 Storm Drain System (including, but not limited to: 4” floor drain, 4” DWV pipe and fittings, 12” HDPE storm drain, 12” perforated storm drain, gravel, and nonwoven geofabric) Lump-Sum 1 33 Pressure Gauges and Transducers (Detail F/Sheet M4.4) Each 1 34 Air Relief Valve (Detail D/Sheet M4.1) Each 2 35 Pipe Pressure Test – all water lines and drain lines Lump-Sum 1 36 Control / Electrical Panels – provide and install (Sheets E1.0, E3.0, E4.0, E4.1, E6.0) Lump-Sum 1 37 Electrical Component Installations (including, but not limited to: Conduits, cables, junction boxes, outlets, switches, linear lights, exit signs, outdoor wall packs, grounding system, and safety devices) Lump-Sum 1 38 550 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install Each 2 39 100 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install Each 5 40 Chemical Controller – provide and Install (Sheets M1.0 and M3.0) Each 1 41 Acid Fume Scrubber, including, but not limited to: acid fume scrubber, wall mount kit, tubing, and tank connection) Each 1 42 Wrought Iron Fence* (Around Pump Station, including, but not limited to: fence, posts, and post footings) [*– does not include Pool Perimeter Fencing] Linear Foot/Feet 176 43 Wrought Iron Gate - Single (including, but not limited to: gate, posts, and post footings) Each 2 44 Wrought Iron Gate - Double (including, but not limited to: gate, posts, and post footings) Each 2 45 Pool Equipment Start-up – Testing, Function adjustments, Calibration as needed Lump-Sum 1 46 Operations & Maintenance – Manual, 30-Day Break-in Period Lump-Sum 1 | Next Bid Schedule-Line Items STANDARD Code Description UOM Qty 1 Mobilization, Site prep (identify all components for ‘selective demolition’ – pool equipment, concrete, mechanical, electrical, underground utilities; Pool Deck Protection measures); Required Permit(s); Required insurances Lump-Sum 1 2 Pool Plaster Protection Measures Lump-Sum 1 3 Equipment Relocation Cost (remove, store, re-install saved equipment) Lump-Sum 1 4 Demolition and hauling of existing landscaping Lump-Sum 1 5 Demolition and hauling of vertical structures (including, but not limited to: existing pump station building and footing, chain-link fences, existing canopy above chemical tanks, storage shed, and gates) Lump-Sum 1 6 Demolition and hauling of the concrete slab sections (per callout D1 and D9 on sheet D1.0 of the plan set) Lump-Sum 1 7 Demolition and hauling of electrical materials (including, but not limited to: electrical panels, wires, conduits, lights, receptacles, and junction boxes) (Sheets E1.0D & E2.0D) Lump-Sum 1 8 Demolition and hauling of mechanical materials/systems (including, but not limited to: pipes, valves, fittings, chemical tubing, backwash pit, and pipe supports) Lump-Sum 1 9 Renovate Inside of Existing Wet Well [Interior Roof, Interior Walls, Interior Floor Slab] – includes repairing spalled concrete, crack repairs (Detail 12/Sheet S0.3), and the application of a waterproof coating on the interior floor and walls (Xypex or approved equal) Square Foot/Feet 875 10 Site grading per plan (Including landscape grading and site preparation for concrete footings and flatwork) Lump-Sum 1 11 Containment Wall (Retaining Wall and curb for grade change) Linear Foot/Feet 45 12 Pump Station Floor Drains (per plans) Each 5 13 Concrete Flat Work (including, but not limited to: concrete slab, housekeeping pads, walkway, concrete deck, chemical containment curbs) Square Foot/Feet 1020 14 Wet well regrading (Sheet C2.0 and per Detail B sheet C3.2) Square Foot/Feet 280 15 CMU Building (including, but not limited to: Concrete Foundation/Slab, Structural Walls, Fiberglass Doors, Roof, Roof Drains, Footing, Roll-up Door) Square Foot/Feet 1300 16 Covered Canopy Structure (including, but not limited to: steel beams, steel columns, fiber-cement siding, shade structure, and cantilevered shade structure at front of pump station) Lump-Sum 1 17 Access Hatch in Roof for Vertical Turbine Pump Removal Each 1 18 Wet Well Access Hatch Each 1 19 10” Insulated Heater Pipe Linear Foot/Feet 45 20 14” Insulated Heater Pipe Linear Foot/Feet 15 21 8" Pipe Linear Foot/Feet 80 22 6" Pipe Linear Foot/Feet 20 23 4" Pipe Linear Foot/Feet 40 24 3" Sewer Drain Pipe Linear Foot/Feet 80 25 2" Water Line Connection Linear Foot/Feet 120 26 Gas Line Connection Linear Foot/Feet 40 27 Valves and Fittings Lump-Sum 1 28 Backwash Piping and Associated Piping (including, but not limited to: backwash standpipe, 10-inch DWV pipe, and fittings) (Sheets M2.1 and M4.1) Lump-Sum 1 29 Heater Intake and Exhaust Pipe (including, but not limited to: 10” PVC intake pipe, 14” Double-wall Type B Vent, Insulated Wall Fittings, and Vent Cap) Lump-Sum 1 30 Water Level Sensor Each 1 31 Flow Meter and Associated Transmitter (Sheet M4.2) Each 1 32 Storm Drain System (including, but not limited to: 4” floor drain, 4” DWV pipe and fittings, 12” HDPE storm drain, 12” perforated storm drain, gravel, and nonwoven geofabric) Lump-Sum 1 33 Pressure Gauges and Transducers (Detail F/Sheet M4.4) Each 1 34 Air Relief Valve (Detail D/Sheet M4.1) Each 2 35 Pipe Pressure Test – all water lines and drain lines Lump-Sum 1 36 Control / Electrical Panels – provide and install (Sheets E1.0, E3.0, E4.0, E4.1, E6.0) Lump-Sum 1 37 Electrical Component Installations (including, but not limited to: Conduits, cables, junction boxes, outlets, switches, linear lights, exit signs, outdoor wall packs, grounding system, and safety devices) Lump-Sum 1 38 550 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install Each 2 39 100 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install Each 5 40 Chemical Controller – provide and Install (Sheets M1.0 and M3.0) Each 1 41 Acid Fume Scrubber, including, but not limited to: acid fume scrubber, wall mount kit, tubing, and tank connection) Each 1 42 Wrought Iron Fence* (Around Pump Station, including, but not limited to: fence, posts, and post footings) [*– does not include Pool Perimeter Fencing] Linear Foot/Feet 176 43 Wrought Iron Gate - Single (including, but not limited to: gate, posts, and post footings) Each 2 44 Wrought Iron Gate - Double (including, but not limited to: gate, posts, and post footings) Each 2 45 Pool Equipment Start-up – Testing, Function adjustments, Calibration as needed Lump-Sum 1 46 Operations & Maintenance – Manual, 30-Day Break-in Period Lump-Sum 1 | Code Description UOM Qty | 1 Mobilization, Site prep (identify all components for ‘selective demolition’ – pool equipment, concrete, mechanical, electrical, underground utilities; Pool Deck Protection measures); Required Permit(s); Required insurances Lump-Sum 1 2 Pool Plaster Protection Measures Lump-Sum 1 3 Equipment Relocation Cost (remove, store, re-install saved equipment) Lump-Sum 1 4 Demolition and hauling of existing landscaping Lump-Sum 1 5 Demolition and hauling of vertical structures (including, but not limited to: existing pump station building and footing, chain-link fences, existing canopy above chemical tanks, storage shed, and gates) Lump-Sum 1 6 Demolition and hauling of the concrete slab sections (per callout D1 and D9 on sheet D1.0 of the plan set) Lump-Sum 1 7 Demolition and hauling of electrical materials (including, but not limited to: electrical panels, wires, conduits, lights, receptacles, and junction boxes) (Sheets E1.0D & E2.0D) Lump-Sum 1 8 Demolition and hauling of mechanical materials/systems (including, but not limited to: pipes, valves, fittings, chemical tubing, backwash pit, and pipe supports) Lump-Sum 1 9 Renovate Inside of Existing Wet Well [Interior Roof, Interior Walls, Interior Floor Slab] – includes repairing spalled concrete, crack repairs (Detail 12/Sheet S0.3), and the application of a waterproof coating on the interior floor and walls (Xypex or approved equal) Square Foot/Feet 875 10 Site grading per plan (Including landscape grading and site preparation for concrete footings and flatwork) Lump-Sum 1 11 Containment Wall (Retaining Wall and curb for grade change) Linear Foot/Feet 45 12 Pump Station Floor Drains (per plans) Each 5 13 Concrete Flat Work (including, but not limited to: concrete slab, housekeeping pads, walkway, concrete deck, chemical containment curbs) Square Foot/Feet 1020 14 Wet well regrading (Sheet C2.0 and per Detail B sheet C3.2) Square Foot/Feet 280 15 CMU Building (including, but not limited to: Concrete Foundation/Slab, Structural Walls, Fiberglass Doors, Roof, Roof Drains, Footing, Roll-up Door) Square Foot/Feet 1300 16 Covered Canopy Structure (including, but not limited to: steel beams, steel columns, fiber-cement siding, shade structure, and cantilevered shade structure at front of pump station) Lump-Sum 1 17 Access Hatch in Roof for Vertical Turbine Pump Removal Each 1 18 Wet Well Access Hatch Each 1 19 10” Insulated Heater Pipe Linear Foot/Feet 45 20 14” Insulated Heater Pipe Linear Foot/Feet 15 21 8" Pipe Linear Foot/Feet 80 22 6" Pipe Linear Foot/Feet 20 23 4" Pipe Linear Foot/Feet 40 24 3" Sewer Drain Pipe Linear Foot/Feet 80 25 2" Water Line Connection Linear Foot/Feet 120 26 Gas Line Connection Linear Foot/Feet 40 27 Valves and Fittings Lump-Sum 1 28 Backwash Piping and Associated Piping (including, but not limited to: backwash standpipe, 10-inch DWV pipe, and fittings) (Sheets M2.1 and M4.1) Lump-Sum 1 29 Heater Intake and Exhaust Pipe (including, but not limited to: 10” PVC intake pipe, 14” Double-wall Type B Vent, Insulated Wall Fittings, and Vent Cap) Lump-Sum 1 30 Water Level Sensor Each 1 31 Flow Meter and Associated Transmitter (Sheet M4.2) Each 1 32 Storm Drain System (including, but not limited to: 4” floor drain, 4” DWV pipe and fittings, 12” HDPE storm drain, 12” perforated storm drain, gravel, and nonwoven geofabric) Lump-Sum 1 33 Pressure Gauges and Transducers (Detail F/Sheet M4.4) Each 1 34 Air Relief Valve (Detail D/Sheet M4.1) Each 2 35 Pipe Pressure Test – all water lines and drain lines Lump-Sum 1 36 Control / Electrical Panels – provide and install (Sheets E1.0, E3.0, E4.0, E4.1, E6.0) Lump-Sum 1 37 Electrical Component Installations (including, but not limited to: Conduits, cables, junction boxes, outlets, switches, linear lights, exit signs, outdoor wall packs, grounding system, and safety devices) Lump-Sum 1 38 550 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install Each 2 39 100 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install Each 5 40 Chemical Controller – provide and Install (Sheets M1.0 and M3.0) Each 1 41 Acid Fume Scrubber, including, but not limited to: acid fume scrubber, wall mount kit, tubing, and tank connection) Each 1 42 Wrought Iron Fence* (Around Pump Station, including, but not limited to: fence, posts, and post footings) [*– does not include Pool Perimeter Fencing] Linear Foot/Feet 176 43 Wrought Iron Gate - Single (including, but not limited to: gate, posts, and post footings) Each 2 44 Wrought Iron Gate - Double (including, but not limited to: gate, posts, and post footings) Each 2 45 Pool Equipment Start-up – Testing, Function adjustments, Calibration as needed Lump-Sum 1 46 Operations & Maintenance – Manual, 30-Day Break-in Period Lump-Sum 1 | 1 | Mobilization, Site prep (identify all components for ‘selective demolition’ – pool equipment, concrete, mechanical, electrical, underground utilities; Pool Deck Protection measures); Required Permit(s); Required insurances | Lump-Sum | 1 | 2 | Pool Plaster Protection Measures | Lump-Sum | 1 | 3 | Equipment Relocation Cost (remove, store, re-install saved equipment) | Lump-Sum | 1 | 4 | Demolition and hauling of existing landscaping | Lump-Sum | 1 | 5 | Demolition and hauling of vertical structures (including, but not limited to: existing pump station building and footing, chain-link fences, existing canopy above chemical tanks, storage shed, and gates) | Lump-Sum | 1 | 6 | Demolition and hauling of the concrete slab sections (per callout D1 and D9 on sheet D1.0 of the plan set) | Lump-Sum | 1 | 7 | Demolition and hauling of electrical materials (including, but not limited to: electrical panels, wires, conduits, lights, receptacles, and junction boxes) (Sheets E1.0D & E2.0D) | Lump-Sum | 1 | 8 | Demolition and hauling of mechanical materials/systems (including, but not limited to: pipes, valves, fittings, chemical tubing, backwash pit, and pipe supports) | Lump-Sum | 1 | 9 | Renovate Inside of Existing Wet Well [Interior Roof, Interior Walls, Interior Floor Slab] – includes repairing spalled concrete, crack repairs (Detail 12/Sheet S0.3), and the application of a waterproof coating on the interior floor and walls (Xypex or approved equal) | Square Foot/Feet | 875 | 10 | Site grading per plan (Including landscape grading and site preparation for concrete footings and flatwork) | Lump-Sum | 1 | 11 | Containment Wall (Retaining Wall and curb for grade change) | Linear Foot/Feet | 45 | 12 | Pump Station Floor Drains (per plans) | Each | 5 | 13 | Concrete Flat Work (including, but not limited to: concrete slab, housekeeping pads, walkway, concrete deck, chemical containment curbs) | Square Foot/Feet | 1020 | 14 | Wet well regrading (Sheet C2.0 and per Detail B sheet C3.2) | Square Foot/Feet | 280 | 15 | CMU Building (including, but not limited to: Concrete Foundation/Slab, Structural Walls, Fiberglass Doors, Roof, Roof Drains, Footing, Roll-up Door) | Square Foot/Feet | 1300 | 16 | Covered Canopy Structure (including, but not limited to: steel beams, steel columns, fiber-cement siding, shade structure, and cantilevered shade structure at front of pump station) | Lump-Sum | 1 | 17 | Access Hatch in Roof for Vertical Turbine Pump Removal | Each | 1 | 18 | Wet Well Access Hatch | Each | 1 | 19 | 10” Insulated Heater Pipe | Linear Foot/Feet | 45 | 20 | 14” Insulated Heater Pipe | Linear Foot/Feet | 15 | 21 | 8" Pipe | Linear Foot/Feet | 80 | 22 | 6" Pipe | Linear Foot/Feet | 20 | 23 | 4" Pipe | Linear Foot/Feet | 40 | 24 | 3" Sewer Drain Pipe | Linear Foot/Feet | 80 | 25 | 2" Water Line Connection | Linear Foot/Feet | 120 | 26 | Gas Line Connection | Linear Foot/Feet | 40 | 27 | Valves and Fittings | Lump-Sum | 1 | 28 | Backwash Piping and Associated Piping (including, but not limited to: backwash standpipe, 10-inch DWV pipe, and fittings) (Sheets M2.1 and M4.1) | Lump-Sum | 1 | 29 | Heater Intake and Exhaust Pipe (including, but not limited to: 10” PVC intake pipe, 14” Double-wall Type B Vent, Insulated Wall Fittings, and Vent Cap) | Lump-Sum | 1 | 30 | Water Level Sensor | Each | 1 | 31 | Flow Meter and Associated Transmitter (Sheet M4.2) | Each | 1 | 32 | Storm Drain System (including, but not limited to: 4” floor drain, 4” DWV pipe and fittings, 12” HDPE storm drain, 12” perforated storm drain, gravel, and nonwoven geofabric) | Lump-Sum | 1 | 33 | Pressure Gauges and Transducers (Detail F/Sheet M4.4) | Each | 1 | 34 | Air Relief Valve (Detail D/Sheet M4.1) | Each | 2 | 35 | Pipe Pressure Test – all water lines and drain lines | Lump-Sum | 1 | 36 | Control / Electrical Panels – provide and install (Sheets E1.0, E3.0, E4.0, E4.1, E6.0) | Lump-Sum | 1 | 37 | Electrical Component Installations (including, but not limited to: Conduits, cables, junction boxes, outlets, switches, linear lights, exit signs, outdoor wall packs, grounding system, and safety devices) | Lump-Sum | 1 | 38 | 550 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install | Each | 2 | 39 | 100 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install | Each | 5 | 40 | Chemical Controller – provide and Install (Sheets M1.0 and M3.0) | Each | 1 | 41 | Acid Fume Scrubber, including, but not limited to: acid fume scrubber, wall mount kit, tubing, and tank connection) | Each | 1 | 42 | Wrought Iron Fence* (Around Pump Station, including, but not limited to: fence, posts, and post footings) [*– does not include Pool Perimeter Fencing] | Linear Foot/Feet | 176 | 43 | Wrought Iron Gate - Single (including, but not limited to: gate, posts, and post footings) | Each | 2 | 44 | Wrought Iron Gate - Double (including, but not limited to: gate, posts, and post footings) | Each | 2 | 45 | Pool Equipment Start-up – Testing, Function adjustments, Calibration as needed | Lump-Sum | 1 | 46 | Operations & Maintenance – Manual, 30-Day Break-in Period | Lump-Sum | 1 | | | | Next Bid Schedule-Line Items STANDARD Code Description UOM Qty 1 Mobilization, Site prep (identify all components for ‘selective demolition’ – pool equipment, concrete, mechanical, electrical, underground utilities; Pool Deck Protection measures); Required Permit(s); Required insurances Lump-Sum 1 2 Pool Plaster Protection Measures Lump-Sum 1 3 Equipment Relocation Cost (remove, store, re-install saved equipment) Lump-Sum 1 4 Demolition and hauling of existing landscaping Lump-Sum 1 5 Demolition and hauling of vertical structures (including, but not limited to: existing pump station building and footing, chain-link fences, existing canopy above chemical tanks, storage shed, and gates) Lump-Sum 1 6 Demolition and hauling of the concrete slab sections (per callout D1 and D9 on sheet D1.0 of the plan set) Lump-Sum 1 7 Demolition and hauling of electrical materials (including, but not limited to: electrical panels, wires, conduits, lights, receptacles, and junction boxes) (Sheets E1.0D & E2.0D) Lump-Sum 1 8 Demolition and hauling of mechanical materials/systems (including, but not limited to: pipes, valves, fittings, chemical tubing, backwash pit, and pipe supports) Lump-Sum 1 9 Renovate Inside of Existing Wet Well [Interior Roof, Interior Walls, Interior Floor Slab] – includes repairing spalled concrete, crack repairs (Detail 12/Sheet S0.3), and the application of a waterproof coating on the interior floor and walls (Xypex or approved equal) Square Foot/Feet 875 10 Site grading per plan (Including landscape grading and site preparation for concrete footings and flatwork) Lump-Sum 1 11 Containment Wall (Retaining Wall and curb for grade change) Linear Foot/Feet 45 12 Pump Station Floor Drains (per plans) Each 5 13 Concrete Flat Work (including, but not limited to: concrete slab, housekeeping pads, walkway, concrete deck, chemical containment curbs) Square Foot/Feet 1020 14 Wet well regrading (Sheet C2.0 and per Detail B sheet C3.2) Square Foot/Feet 280 15 CMU Building (including, but not limited to: Concrete Foundation/Slab, Structural Walls, Fiberglass Doors, Roof, Roof Drains, Footing, Roll-up Door) Square Foot/Feet 1300 16 Covered Canopy Structure (including, but not limited to: steel beams, steel columns, fiber-cement siding, shade structure, and cantilevered shade structure at front of pump station) Lump-Sum 1 17 Access Hatch in Roof for Vertical Turbine Pump Removal Each 1 18 Wet Well Access Hatch Each 1 19 10” Insulated Heater Pipe Linear Foot/Feet 45 20 14” Insulated Heater Pipe Linear Foot/Feet 15 21 8" Pipe Linear Foot/Feet 80 22 6" Pipe Linear Foot/Feet 20 23 4" Pipe Linear Foot/Feet 40 24 3" Sewer Drain Pipe Linear Foot/Feet 80 25 2" Water Line Connection Linear Foot/Feet 120 26 Gas Line Connection Linear Foot/Feet 40 27 Valves and Fittings Lump-Sum 1 28 Backwash Piping and Associated Piping (including, but not limited to: backwash standpipe, 10-inch DWV pipe, and fittings) (Sheets M2.1 and M4.1) Lump-Sum 1 29 Heater Intake and Exhaust Pipe (including, but not limited to: 10” PVC intake pipe, 14” Double-wall Type B Vent, Insulated Wall Fittings, and Vent Cap) Lump-Sum 1 30 Water Level Sensor Each 1 31 Flow Meter and Associated Transmitter (Sheet M4.2) Each 1 32 Storm Drain System (including, but not limited to: 4” floor drain, 4” DWV pipe and fittings, 12” HDPE storm drain, 12” perforated storm drain, gravel, and nonwoven geofabric) Lump-Sum 1 33 Pressure Gauges and Transducers (Detail F/Sheet M4.4) Each 1 34 Air Relief Valve (Detail D/Sheet M4.1) Each 2 35 Pipe Pressure Test – all water lines and drain lines Lump-Sum 1 36 Control / Electrical Panels – provide and install (Sheets E1.0, E3.0, E4.0, E4.1, E6.0) Lump-Sum 1 37 Electrical Component Installations (including, but not limited to: Conduits, cables, junction boxes, outlets, switches, linear lights, exit signs, outdoor wall packs, grounding system, and safety devices) Lump-Sum 1 38 550 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install Each 2 39 100 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install Each 5 40 Chemical Controller – provide and Install (Sheets M1.0 and M3.0) Each 1 41 Acid Fume Scrubber, including, but not limited to: acid fume scrubber, wall mount kit, tubing, and tank connection) Each 1 42 Wrought Iron Fence* (Around Pump Station, including, but not limited to: fence, posts, and post footings) [*– does not include Pool Perimeter Fencing] Linear Foot/Feet 176 43 Wrought Iron Gate - Single (including, but not limited to: gate, posts, and post footings) Each 2 44 Wrought Iron Gate - Double (including, but not limited to: gate, posts, and post footings) Each 2 45 Pool Equipment Start-up – Testing, Function adjustments, Calibration as needed Lump-Sum 1 46 Operations & Maintenance – Manual, 30-Day Break-in Period Lump-Sum 1 | Code Description UOM Qty | 1 Mobilization, Site prep (identify all components for ‘selective demolition’ – pool equipment, concrete, mechanical, electrical, underground utilities; Pool Deck Protection measures); Required Permit(s); Required insurances Lump-Sum 1 2 Pool Plaster Protection Measures Lump-Sum 1 3 Equipment Relocation Cost (remove, store, re-install saved equipment) Lump-Sum 1 4 Demolition and hauling of existing landscaping Lump-Sum 1 5 Demolition and hauling of vertical structures (including, but not limited to: existing pump station building and footing, chain-link fences, existing canopy above chemical tanks, storage shed, and gates) Lump-Sum 1 6 Demolition and hauling of the concrete slab sections (per callout D1 and D9 on sheet D1.0 of the plan set) Lump-Sum 1 7 Demolition and hauling of electrical materials (including, but not limited to: electrical panels, wires, conduits, lights, receptacles, and junction boxes) (Sheets E1.0D & E2.0D) Lump-Sum 1 8 Demolition and hauling of mechanical materials/systems (including, but not limited to: pipes, valves, fittings, chemical tubing, backwash pit, and pipe supports) Lump-Sum 1 9 Renovate Inside of Existing Wet Well [Interior Roof, Interior Walls, Interior Floor Slab] – includes repairing spalled concrete, crack repairs (Detail 12/Sheet S0.3), and the application of a waterproof coating on the interior floor and walls (Xypex or approved equal) Square Foot/Feet 875 10 Site grading per plan (Including landscape grading and site preparation for concrete footings and flatwork) Lump-Sum 1 11 Containment Wall (Retaining Wall and curb for grade change) Linear Foot/Feet 45 12 Pump Station Floor Drains (per plans) Each 5 13 Concrete Flat Work (including, but not limited to: concrete slab, housekeeping pads, walkway, concrete deck, chemical containment curbs) Square Foot/Feet 1020 14 Wet well regrading (Sheet C2.0 and per Detail B sheet C3.2) Square Foot/Feet 280 15 CMU Building (including, but not limited to: Concrete Foundation/Slab, Structural Walls, Fiberglass Doors, Roof, Roof Drains, Footing, Roll-up Door) Square Foot/Feet 1300 16 Covered Canopy Structure (including, but not limited to: steel beams, steel columns, fiber-cement siding, shade structure, and cantilevered shade structure at front of pump station) Lump-Sum 1 17 Access Hatch in Roof for Vertical Turbine Pump Removal Each 1 18 Wet Well Access Hatch Each 1 19 10” Insulated Heater Pipe Linear Foot/Feet 45 20 14” Insulated Heater Pipe Linear Foot/Feet 15 21 8" Pipe Linear Foot/Feet 80 22 6" Pipe Linear Foot/Feet 20 23 4" Pipe Linear Foot/Feet 40 24 3" Sewer Drain Pipe Linear Foot/Feet 80 25 2" Water Line Connection Linear Foot/Feet 120 26 Gas Line Connection Linear Foot/Feet 40 27 Valves and Fittings Lump-Sum 1 28 Backwash Piping and Associated Piping (including, but not limited to: backwash standpipe, 10-inch DWV pipe, and fittings) (Sheets M2.1 and M4.1) Lump-Sum 1 29 Heater Intake and Exhaust Pipe (including, but not limited to: 10” PVC intake pipe, 14” Double-wall Type B Vent, Insulated Wall Fittings, and Vent Cap) Lump-Sum 1 30 Water Level Sensor Each 1 31 Flow Meter and Associated Transmitter (Sheet M4.2) Each 1 32 Storm Drain System (including, but not limited to: 4” floor drain, 4” DWV pipe and fittings, 12” HDPE storm drain, 12” perforated storm drain, gravel, and nonwoven geofabric) Lump-Sum 1 33 Pressure Gauges and Transducers (Detail F/Sheet M4.4) Each 1 34 Air Relief Valve (Detail D/Sheet M4.1) Each 2 35 Pipe Pressure Test – all water lines and drain lines Lump-Sum 1 36 Control / Electrical Panels – provide and install (Sheets E1.0, E3.0, E4.0, E4.1, E6.0) Lump-Sum 1 37 Electrical Component Installations (including, but not limited to: Conduits, cables, junction boxes, outlets, switches, linear lights, exit signs, outdoor wall packs, grounding system, and safety devices) Lump-Sum 1 38 550 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install Each 2 39 100 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install Each 5 40 Chemical Controller – provide and Install (Sheets M1.0 and M3.0) Each 1 41 Acid Fume Scrubber, including, but not limited to: acid fume scrubber, wall mount kit, tubing, and tank connection) Each 1 42 Wrought Iron Fence* (Around Pump Station, including, but not limited to: fence, posts, and post footings) [*– does not include Pool Perimeter Fencing] Linear Foot/Feet 176 43 Wrought Iron Gate - Single (including, but not limited to: gate, posts, and post footings) Each 2 44 Wrought Iron Gate - Double (including, but not limited to: gate, posts, and post footings) Each 2 45 Pool Equipment Start-up – Testing, Function adjustments, Calibration as needed Lump-Sum 1 46 Operations & Maintenance – Manual, 30-Day Break-in Period Lump-Sum 1 | 1 | Mobilization, Site prep (identify all components for ‘selective demolition’ – pool equipment, concrete, mechanical, electrical, underground utilities; Pool Deck Protection measures); Required Permit(s); Required insurances | Lump-Sum | 1 | 2 | Pool Plaster Protection Measures | Lump-Sum | 1 | 3 | Equipment Relocation Cost (remove, store, re-install saved equipment) | Lump-Sum | 1 | 4 | Demolition and hauling of existing landscaping | Lump-Sum | 1 | 5 | Demolition and hauling of vertical structures (including, but not limited to: existing pump station building and footing, chain-link fences, existing canopy above chemical tanks, storage shed, and gates) | Lump-Sum | 1 | 6 | Demolition and hauling of the concrete slab sections (per callout D1 and D9 on sheet D1.0 of the plan set) | Lump-Sum | 1 | 7 | Demolition and hauling of electrical materials (including, but not limited to: electrical panels, wires, conduits, lights, receptacles, and junction boxes) (Sheets E1.0D & E2.0D) | Lump-Sum | 1 | 8 | Demolition and hauling of mechanical materials/systems (including, but not limited to: pipes, valves, fittings, chemical tubing, backwash pit, and pipe supports) | Lump-Sum | 1 | 9 | Renovate Inside of Existing Wet Well [Interior Roof, Interior Walls, Interior Floor Slab] – includes repairing spalled concrete, crack repairs (Detail 12/Sheet S0.3), and the application of a waterproof coating on the interior floor and walls (Xypex or approved equal) | Square Foot/Feet | 875 | 10 | Site grading per plan (Including landscape grading and site preparation for concrete footings and flatwork) | Lump-Sum | 1 | 11 | Containment Wall (Retaining Wall and curb for grade change) | Linear Foot/Feet | 45 | 12 | Pump Station Floor Drains (per plans) | Each | 5 | 13 | Concrete Flat Work (including, but not limited to: concrete slab, housekeeping pads, walkway, concrete deck, chemical containment curbs) | Square Foot/Feet | 1020 | 14 | Wet well regrading (Sheet C2.0 and per Detail B sheet C3.2) | Square Foot/Feet | 280 | 15 | CMU Building (including, but not limited to: Concrete Foundation/Slab, Structural Walls, Fiberglass Doors, Roof, Roof Drains, Footing, Roll-up Door) | Square Foot/Feet | 1300 | 16 | Covered Canopy Structure (including, but not limited to: steel beams, steel columns, fiber-cement siding, shade structure, and cantilevered shade structure at front of pump station) | Lump-Sum | 1 | 17 | Access Hatch in Roof for Vertical Turbine Pump Removal | Each | 1 | 18 | Wet Well Access Hatch | Each | 1 | 19 | 10” Insulated Heater Pipe | Linear Foot/Feet | 45 | 20 | 14” Insulated Heater Pipe | Linear Foot/Feet | 15 | 21 | 8" Pipe | Linear Foot/Feet | 80 | 22 | 6" Pipe | Linear Foot/Feet | 20 | 23 | 4" Pipe | Linear Foot/Feet | 40 | 24 | 3" Sewer Drain Pipe | Linear Foot/Feet | 80 | 25 | 2" Water Line Connection | Linear Foot/Feet | 120 | 26 | Gas Line Connection | Linear Foot/Feet | 40 | 27 | Valves and Fittings | Lump-Sum | 1 | 28 | Backwash Piping and Associated Piping (including, but not limited to: backwash standpipe, 10-inch DWV pipe, and fittings) (Sheets M2.1 and M4.1) | Lump-Sum | 1 | 29 | Heater Intake and Exhaust Pipe (including, but not limited to: 10” PVC intake pipe, 14” Double-wall Type B Vent, Insulated Wall Fittings, and Vent Cap) | Lump-Sum | 1 | 30 | Water Level Sensor | Each | 1 | 31 | Flow Meter and Associated Transmitter (Sheet M4.2) | Each | 1 | 32 | Storm Drain System (including, but not limited to: 4” floor drain, 4” DWV pipe and fittings, 12” HDPE storm drain, 12” perforated storm drain, gravel, and nonwoven geofabric) | Lump-Sum | 1 | 33 | Pressure Gauges and Transducers (Detail F/Sheet M4.4) | Each | 1 | 34 | Air Relief Valve (Detail D/Sheet M4.1) | Each | 2 | 35 | Pipe Pressure Test – all water lines and drain lines | Lump-Sum | 1 | 36 | Control / Electrical Panels – provide and install (Sheets E1.0, E3.0, E4.0, E4.1, E6.0) | Lump-Sum | 1 | 37 | Electrical Component Installations (including, but not limited to: Conduits, cables, junction boxes, outlets, switches, linear lights, exit signs, outdoor wall packs, grounding system, and safety devices) | Lump-Sum | 1 | 38 | 550 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install | Each | 2 | 39 | 100 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install | Each | 5 | 40 | Chemical Controller – provide and Install (Sheets M1.0 and M3.0) | Each | 1 | 41 | Acid Fume Scrubber, including, but not limited to: acid fume scrubber, wall mount kit, tubing, and tank connection) | Each | 1 | 42 | Wrought Iron Fence* (Around Pump Station, including, but not limited to: fence, posts, and post footings) [*– does not include Pool Perimeter Fencing] | Linear Foot/Feet | 176 | 43 | Wrought Iron Gate - Single (including, but not limited to: gate, posts, and post footings) | Each | 2 | 44 | Wrought Iron Gate - Double (including, but not limited to: gate, posts, and post footings) | Each | 2 | 45 | Pool Equipment Start-up – Testing, Function adjustments, Calibration as needed | Lump-Sum | 1 | 46 | Operations & Maintenance – Manual, 30-Day Break-in Period | Lump-Sum | 1 | | | Code Description UOM Qty | | 1 Mobilization, Site prep (identify all components for ‘selective demolition’ – pool equipment, concrete, mechanical, electrical, underground utilities; Pool Deck Protection measures); Required Permit(s); Required insurances Lump-Sum 1 2 Pool Plaster Protection Measures Lump-Sum 1 3 Equipment Relocation Cost (remove, store, re-install saved equipment) Lump-Sum 1 4 Demolition and hauling of existing landscaping Lump-Sum 1 5 Demolition and hauling of vertical structures (including, but not limited to: existing pump station building and footing, chain-link fences, existing canopy above chemical tanks, storage shed, and gates) Lump-Sum 1 6 Demolition and hauling of the concrete slab sections (per callout D1 and D9 on sheet D1.0 of the plan set) Lump-Sum 1 7 Demolition and hauling of electrical materials (including, but not limited to: electrical panels, wires, conduits, lights, receptacles, and junction boxes) (Sheets E1.0D & E2.0D) Lump-Sum 1 8 Demolition and hauling of mechanical materials/systems (including, but not limited to: pipes, valves, fittings, chemical tubing, backwash pit, and pipe supports) Lump-Sum 1 9 Renovate Inside of Existing Wet Well [Interior Roof, Interior Walls, Interior Floor Slab] – includes repairing spalled concrete, crack repairs (Detail 12/Sheet S0.3), and the application of a waterproof coating on the interior floor and walls (Xypex or approved equal) Square Foot/Feet 875 10 Site grading per plan (Including landscape grading and site preparation for concrete footings and flatwork) Lump-Sum 1 11 Containment Wall (Retaining Wall and curb for grade change) Linear Foot/Feet 45 12 Pump Station Floor Drains (per plans) Each 5 13 Concrete Flat Work (including, but not limited to: concrete slab, housekeeping pads, walkway, concrete deck, chemical containment curbs) Square Foot/Feet 1020 14 Wet well regrading (Sheet C2.0 and per Detail B sheet C3.2) Square Foot/Feet 280 15 CMU Building (including, but not limited to: Concrete Foundation/Slab, Structural Walls, Fiberglass Doors, Roof, Roof Drains, Footing, Roll-up Door) Square Foot/Feet 1300 16 Covered Canopy Structure (including, but not limited to: steel beams, steel columns, fiber-cement siding, shade structure, and cantilevered shade structure at front of pump station) Lump-Sum 1 17 Access Hatch in Roof for Vertical Turbine Pump Removal Each 1 18 Wet Well Access Hatch Each 1 19 10” Insulated Heater Pipe Linear Foot/Feet 45 20 14” Insulated Heater Pipe Linear Foot/Feet 15 21 8" Pipe Linear Foot/Feet 80 22 6" Pipe Linear Foot/Feet 20 23 4" Pipe Linear Foot/Feet 40 24 3" Sewer Drain Pipe Linear Foot/Feet 80 25 2" Water Line Connection Linear Foot/Feet 120 26 Gas Line Connection Linear Foot/Feet 40 27 Valves and Fittings Lump-Sum 1 28 Backwash Piping and Associated Piping (including, but not limited to: backwash standpipe, 10-inch DWV pipe, and fittings) (Sheets M2.1 and M4.1) Lump-Sum 1 29 Heater Intake and Exhaust Pipe (including, but not limited to: 10” PVC intake pipe, 14” Double-wall Type B Vent, Insulated Wall Fittings, and Vent Cap) Lump-Sum 1 30 Water Level Sensor Each 1 31 Flow Meter and Associated Transmitter (Sheet M4.2) Each 1 32 Storm Drain System (including, but not limited to: 4” floor drain, 4” DWV pipe and fittings, 12” HDPE storm drain, 12” perforated storm drain, gravel, and nonwoven geofabric) Lump-Sum 1 33 Pressure Gauges and Transducers (Detail F/Sheet M4.4) Each 1 34 Air Relief Valve (Detail D/Sheet M4.1) Each 2 35 Pipe Pressure Test – all water lines and drain lines Lump-Sum 1 36 Control / Electrical Panels – provide and install (Sheets E1.0, E3.0, E4.0, E4.1, E6.0) Lump-Sum 1 37 Electrical Component Installations (including, but not limited to: Conduits, cables, junction boxes, outlets, switches, linear lights, exit signs, outdoor wall packs, grounding system, and safety devices) Lump-Sum 1 38 550 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install Each 2 39 100 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install Each 5 40 Chemical Controller – provide and Install (Sheets M1.0 and M3.0) Each 1 41 Acid Fume Scrubber, including, but not limited to: acid fume scrubber, wall mount kit, tubing, and tank connection) Each 1 42 Wrought Iron Fence* (Around Pump Station, including, but not limited to: fence, posts, and post footings) [*– does not include Pool Perimeter Fencing] Linear Foot/Feet 176 43 Wrought Iron Gate - Single (including, but not limited to: gate, posts, and post footings) Each 2 44 Wrought Iron Gate - Double (including, but not limited to: gate, posts, and post footings) Each 2 45 Pool Equipment Start-up – Testing, Function adjustments, Calibration as needed Lump-Sum 1 46 Operations & Maintenance – Manual, 30-Day Break-in Period Lump-Sum 1 | 1 | Mobilization, Site prep (identify all components for ‘selective demolition’ – pool equipment, concrete, mechanical, electrical, underground utilities; Pool Deck Protection measures); Required Permit(s); Required insurances | Lump-Sum | 1 | 2 | Pool Plaster Protection Measures | Lump-Sum | 1 | 3 | Equipment Relocation Cost (remove, store, re-install saved equipment) | Lump-Sum | 1 | 4 | Demolition and hauling of existing landscaping | Lump-Sum | 1 | 5 | Demolition and hauling of vertical structures (including, but not limited to: existing pump station building and footing, chain-link fences, existing canopy above chemical tanks, storage shed, and gates) | Lump-Sum | 1 | 6 | Demolition and hauling of the concrete slab sections (per callout D1 and D9 on sheet D1.0 of the plan set) | Lump-Sum | 1 | 7 | Demolition and hauling of electrical materials (including, but not limited to: electrical panels, wires, conduits, lights, receptacles, and junction boxes) (Sheets E1.0D & E2.0D) | Lump-Sum | 1 | 8 | Demolition and hauling of mechanical materials/systems (including, but not limited to: pipes, valves, fittings, chemical tubing, backwash pit, and pipe supports) | Lump-Sum | 1 | 9 | Renovate Inside of Existing Wet Well [Interior Roof, Interior Walls, Interior Floor Slab] – includes repairing spalled concrete, crack repairs (Detail 12/Sheet S0.3), and the application of a waterproof coating on the interior floor and walls (Xypex or approved equal) | Square Foot/Feet | 875 | 10 | Site grading per plan (Including landscape grading and site preparation for concrete footings and flatwork) | Lump-Sum | 1 | 11 | Containment Wall (Retaining Wall and curb for grade change) | Linear Foot/Feet | 45 | 12 | Pump Station Floor Drains (per plans) | Each | 5 | 13 | Concrete Flat Work (including, but not limited to: concrete slab, housekeeping pads, walkway, concrete deck, chemical containment curbs) | Square Foot/Feet | 1020 | 14 | Wet well regrading (Sheet C2.0 and per Detail B sheet C3.2) | Square Foot/Feet | 280 | 15 | CMU Building (including, but not limited to: Concrete Foundation/Slab, Structural Walls, Fiberglass Doors, Roof, Roof Drains, Footing, Roll-up Door) | Square Foot/Feet | 1300 | 16 | Covered Canopy Structure (including, but not limited to: steel beams, steel columns, fiber-cement siding, shade structure, and cantilevered shade structure at front of pump station) | Lump-Sum | 1 | 17 | Access Hatch in Roof for Vertical Turbine Pump Removal | Each | 1 | 18 | Wet Well Access Hatch | Each | 1 | 19 | 10” Insulated Heater Pipe | Linear Foot/Feet | 45 | 20 | 14” Insulated Heater Pipe | Linear Foot/Feet | 15 | 21 | 8" Pipe | Linear Foot/Feet | 80 | 22 | 6" Pipe | Linear Foot/Feet | 20 | 23 | 4" Pipe | Linear Foot/Feet | 40 | 24 | 3" Sewer Drain Pipe | Linear Foot/Feet | 80 | 25 | 2" Water Line Connection | Linear Foot/Feet | 120 | 26 | Gas Line Connection | Linear Foot/Feet | 40 | 27 | Valves and Fittings | Lump-Sum | 1 | 28 | Backwash Piping and Associated Piping (including, but not limited to: backwash standpipe, 10-inch DWV pipe, and fittings) (Sheets M2.1 and M4.1) | Lump-Sum | 1 | 29 | Heater Intake and Exhaust Pipe (including, but not limited to: 10” PVC intake pipe, 14” Double-wall Type B Vent, Insulated Wall Fittings, and Vent Cap) | Lump-Sum | 1 | 30 | Water Level Sensor | Each | 1 | 31 | Flow Meter and Associated Transmitter (Sheet M4.2) | Each | 1 | 32 | Storm Drain System (including, but not limited to: 4” floor drain, 4” DWV pipe and fittings, 12” HDPE storm drain, 12” perforated storm drain, gravel, and nonwoven geofabric) | Lump-Sum | 1 | 33 | Pressure Gauges and Transducers (Detail F/Sheet M4.4) | Each | 1 | 34 | Air Relief Valve (Detail D/Sheet M4.1) | Each | 2 | 35 | Pipe Pressure Test – all water lines and drain lines | Lump-Sum | 1 | 36 | Control / Electrical Panels – provide and install (Sheets E1.0, E3.0, E4.0, E4.1, E6.0) | Lump-Sum | 1 | 37 | Electrical Component Installations (including, but not limited to: Conduits, cables, junction boxes, outlets, switches, linear lights, exit signs, outdoor wall packs, grounding system, and safety devices) | Lump-Sum | 1 | 38 | 550 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install | Each | 2 | 39 | 100 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install | Each | 5 | 40 | Chemical Controller – provide and Install (Sheets M1.0 and M3.0) | Each | 1 | 41 | Acid Fume Scrubber, including, but not limited to: acid fume scrubber, wall mount kit, tubing, and tank connection) | Each | 1 | 42 | Wrought Iron Fence* (Around Pump Station, including, but not limited to: fence, posts, and post footings) [*– does not include Pool Perimeter Fencing] | Linear Foot/Feet | 176 | 43 | Wrought Iron Gate - Single (including, but not limited to: gate, posts, and post footings) | Each | 2 | 44 | Wrought Iron Gate - Double (including, but not limited to: gate, posts, and post footings) | Each | 2 | 45 | Pool Equipment Start-up – Testing, Function adjustments, Calibration as needed | Lump-Sum | 1 | 46 | Operations & Maintenance – Manual, 30-Day Break-in Period | Lump-Sum | 1 | | | 1 | Mobilization, Site prep (identify all components for ‘selective demolition’ – pool equipment, concrete, mechanical, electrical, underground utilities; Pool Deck Protection measures); Required Permit(s); Required insurances | Lump-Sum | 1 | | 2 | Pool Plaster Protection Measures | Lump-Sum | 1 | | 3 | Equipment Relocation Cost (remove, store, re-install saved equipment) | Lump-Sum | 1 | | 4 | Demolition and hauling of existing landscaping | Lump-Sum | 1 | | 5 | Demolition and hauling of vertical structures (including, but not limited to: existing pump station building and footing, chain-link fences, existing canopy above chemical tanks, storage shed, and gates) | Lump-Sum | 1 | | 6 | Demolition and hauling of the concrete slab sections (per callout D1 and D9 on sheet D1.0 of the plan set) | Lump-Sum | 1 | | 7 | Demolition and hauling of electrical materials (including, but not limited to: electrical panels, wires, conduits, lights, receptacles, and junction boxes) (Sheets E1.0D & E2.0D) | Lump-Sum | 1 | | 8 | Demolition and hauling of mechanical materials/systems (including, but not limited to: pipes, valves, fittings, chemical tubing, backwash pit, and pipe supports) | Lump-Sum | 1 | | 9 | Renovate Inside of Existing Wet Well [Interior Roof, Interior Walls, Interior Floor Slab] – includes repairing spalled concrete, crack repairs (Detail 12/Sheet S0.3), and the application of a waterproof coating on the interior floor and walls (Xypex or approved equal) | Square Foot/Feet | 875 | | 10 | Site grading per plan (Including landscape grading and site preparation for concrete footings and flatwork) | Lump-Sum | 1 | | 11 | Containment Wall (Retaining Wall and curb for grade change) | Linear Foot/Feet | 45 | | 12 | Pump Station Floor Drains (per plans) | Each | 5 | | 13 | Concrete Flat Work (including, but not limited to: concrete slab, housekeeping pads, walkway, concrete deck, chemical containment curbs) | Square Foot/Feet | 1020 | | 14 | Wet well regrading (Sheet C2.0 and per Detail B sheet C3.2) | Square Foot/Feet | 280 | | 15 | CMU Building (including, but not limited to: Concrete Foundation/Slab, Structural Walls, Fiberglass Doors, Roof, Roof Drains, Footing, Roll-up Door) | Square Foot/Feet | 1300 | | 16 | Covered Canopy Structure (including, but not limited to: steel beams, steel columns, fiber-cement siding, shade structure, and cantilevered shade structure at front of pump station) | Lump-Sum | 1 | | 17 | Access Hatch in Roof for Vertical Turbine Pump Removal | Each | 1 | | 18 | Wet Well Access Hatch | Each | 1 | | 19 | 10” Insulated Heater Pipe | Linear Foot/Feet | 45 | | 20 | 14” Insulated Heater Pipe | Linear Foot/Feet | 15 | | 21 | 8" Pipe | Linear Foot/Feet | 80 | | 22 | 6" Pipe | Linear Foot/Feet | 20 | | 23 | 4" Pipe | Linear Foot/Feet | 40 | | 24 | 3" Sewer Drain Pipe | Linear Foot/Feet | 80 | | 25 | 2" Water Line Connection | Linear Foot/Feet | 120 | | 26 | Gas Line Connection | Linear Foot/Feet | 40 | | 27 | Valves and Fittings | Lump-Sum | 1 | | 28 | Backwash Piping and Associated Piping (including, but not limited to: backwash standpipe, 10-inch DWV pipe, and fittings) (Sheets M2.1 and M4.1) | Lump-Sum | 1 | | 29 | Heater Intake and Exhaust Pipe (including, but not limited to: 10” PVC intake pipe, 14” Double-wall Type B Vent, Insulated Wall Fittings, and Vent Cap) | Lump-Sum | 1 | | 30 | Water Level Sensor | Each | 1 | | 31 | Flow Meter and Associated Transmitter (Sheet M4.2) | Each | 1 | | 32 | Storm Drain System (including, but not limited to: 4” floor drain, 4” DWV pipe and fittings, 12” HDPE storm drain, 12” perforated storm drain, gravel, and nonwoven geofabric) | Lump-Sum | 1 | | 33 | Pressure Gauges and Transducers (Detail F/Sheet M4.4) | Each | 1 | | 34 | Air Relief Valve (Detail D/Sheet M4.1) | Each | 2 | | 35 | Pipe Pressure Test – all water lines and drain lines | Lump-Sum | 1 | | 36 | Control / Electrical Panels – provide and install (Sheets E1.0, E3.0, E4.0, E4.1, E6.0) | Lump-Sum | 1 | | 37 | Electrical Component Installations (including, but not limited to: Conduits, cables, junction boxes, outlets, switches, linear lights, exit signs, outdoor wall packs, grounding system, and safety devices) | Lump-Sum | 1 | | 38 | 550 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install | Each | 2 | | 39 | 100 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install | Each | 5 | | 40 | Chemical Controller – provide and Install (Sheets M1.0 and M3.0) | Each | 1 | | 41 | Acid Fume Scrubber, including, but not limited to: acid fume scrubber, wall mount kit, tubing, and tank connection) | Each | 1 | | 42 | Wrought Iron Fence* (Around Pump Station, including, but not limited to: fence, posts, and post footings) [*– does not include Pool Perimeter Fencing] | Linear Foot/Feet | 176 | | 43 | Wrought Iron Gate - Single (including, but not limited to: gate, posts, and post footings) | Each | 2 | | 44 | Wrought Iron Gate - Double (including, but not limited to: gate, posts, and post footings) | Each | 2 | | 45 | Pool Equipment Start-up – Testing, Function adjustments, Calibration as needed | Lump-Sum | 1 | | 46 | Operations & Maintenance – Manual, 30-Day Break-in Period | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next Bid Schedule-Line Items STANDARD Code Description UOM Qty 1 Mobilization, Site prep (identify all components for ‘selective demolition’ – pool equipment, concrete, mechanical, electrical, underground utilities; Pool Deck Protection measures); Required Permit(s); Required insurances Lump-Sum 1 2 Pool Plaster Protection Measures Lump-Sum 1 3 Equipment Relocation Cost (remove, store, re-install saved equipment) Lump-Sum 1 4 Demolition and hauling of existing landscaping Lump-Sum 1 5 Demolition and hauling of vertical structures (including, but not limited to: existing pump station building and footing, chain-link fences, existing canopy above chemical tanks, storage shed, and gates) Lump-Sum 1 6 Demolition and hauling of the concrete slab sections (per callout D1 and D9 on sheet D1.0 of the plan set) Lump-Sum 1 7 Demolition and hauling of electrical materials (including, but not limited to: electrical panels, wires, conduits, lights, receptacles, and junction boxes) (Sheets E1.0D & E2.0D) Lump-Sum 1 8 Demolition and hauling of mechanical materials/systems (including, but not limited to: pipes, valves, fittings, chemical tubing, backwash pit, and pipe supports) Lump-Sum 1 9 Renovate Inside of Existing Wet Well [Interior Roof, Interior Walls, Interior Floor Slab] – includes repairing spalled concrete, crack repairs (Detail 12/Sheet S0.3), and the application of a waterproof coating on the interior floor and walls (Xypex or approved equal) Square Foot/Feet 875 10 Site grading per plan (Including landscape grading and site preparation for concrete footings and flatwork) Lump-Sum 1 11 Containment Wall (Retaining Wall and curb for grade change) Linear Foot/Feet 45 12 Pump Station Floor Drains (per plans) Each 5 13 Concrete Flat Work (including, but not limited to: concrete slab, housekeeping pads, walkway, concrete deck, chemical containment curbs) Square Foot/Feet 1020 14 Wet well regrading (Sheet C2.0 and per Detail B sheet C3.2) Square Foot/Feet 280 15 CMU Building (including, but not limited to: Concrete Foundation/Slab, Structural Walls, Fiberglass Doors, Roof, Roof Drains, Footing, Roll-up Door) Square Foot/Feet 1300 16 Covered Canopy Structure (including, but not limited to: steel beams, steel columns, fiber-cement siding, shade structure, and cantilevered shade structure at front of pump station) Lump-Sum 1 17 Access Hatch in Roof for Vertical Turbine Pump Removal Each 1 18 Wet Well Access Hatch Each 1 19 10” Insulated Heater Pipe Linear Foot/Feet 45 20 14” Insulated Heater Pipe Linear Foot/Feet 15 21 8" Pipe Linear Foot/Feet 80 22 6" Pipe Linear Foot/Feet 20 23 4" Pipe Linear Foot/Feet 40 24 3" Sewer Drain Pipe Linear Foot/Feet 80 25 2" Water Line Connection Linear Foot/Feet 120 26 Gas Line Connection Linear Foot/Feet 40 27 Valves and Fittings Lump-Sum 1 28 Backwash Piping and Associated Piping (including, but not limited to: backwash standpipe, 10-inch DWV pipe, and fittings) (Sheets M2.1 and M4.1) Lump-Sum 1 29 Heater Intake and Exhaust Pipe (including, but not limited to: 10” PVC intake pipe, 14” Double-wall Type B Vent, Insulated Wall Fittings, and Vent Cap) Lump-Sum 1 30 Water Level Sensor Each 1 31 Flow Meter and Associated Transmitter (Sheet M4.2) Each 1 32 Storm Drain System (including, but not limited to: 4” floor drain, 4” DWV pipe and fittings, 12” HDPE storm drain, 12” perforated storm drain, gravel, and nonwoven geofabric) Lump-Sum 1 33 Pressure Gauges and Transducers (Detail F/Sheet M4.4) Each 1 34 Air Relief Valve (Detail D/Sheet M4.1) Each 2 35 Pipe Pressure Test – all water lines and drain lines Lump-Sum 1 36 Control / Electrical Panels – provide and install (Sheets E1.0, E3.0, E4.0, E4.1, E6.0) Lump-Sum 1 37 Electrical Component Installations (including, but not limited to: Conduits, cables, junction boxes, outlets, switches, linear lights, exit signs, outdoor wall packs, grounding system, and safety devices) Lump-Sum 1 38 550 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install Each 2 39 100 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install Each 5 40 Chemical Controller – provide and Install (Sheets M1.0 and M3.0) Each 1 41 Acid Fume Scrubber, including, but not limited to: acid fume scrubber, wall mount kit, tubing, and tank connection) Each 1 42 Wrought Iron Fence* (Around Pump Station, including, but not limited to: fence, posts, and post footings) [*– does not include Pool Perimeter Fencing] Linear Foot/Feet 176 43 Wrought Iron Gate - Single (including, but not limited to: gate, posts, and post footings) Each 2 44 Wrought Iron Gate - Double (including, but not limited to: gate, posts, and post footings) Each 2 45 Pool Equipment Start-up – Testing, Function adjustments, Calibration as needed Lump-Sum 1 46 Operations & Maintenance – Manual, 30-Day Break-in Period Lump-Sum 1 | Code Description UOM Qty | 1 Mobilization, Site prep (identify all components for ‘selective demolition’ – pool equipment, concrete, mechanical, electrical, underground utilities; Pool Deck Protection measures); Required Permit(s); Required insurances Lump-Sum 1 2 Pool Plaster Protection Measures Lump-Sum 1 3 Equipment Relocation Cost (remove, store, re-install saved equipment) Lump-Sum 1 4 Demolition and hauling of existing landscaping Lump-Sum 1 5 Demolition and hauling of vertical structures (including, but not limited to: existing pump station building and footing, chain-link fences, existing canopy above chemical tanks, storage shed, and gates) Lump-Sum 1 6 Demolition and hauling of the concrete slab sections (per callout D1 and D9 on sheet D1.0 of the plan set) Lump-Sum 1 7 Demolition and hauling of electrical materials (including, but not limited to: electrical panels, wires, conduits, lights, receptacles, and junction boxes) (Sheets E1.0D & E2.0D) Lump-Sum 1 8 Demolition and hauling of mechanical materials/systems (including, but not limited to: pipes, valves, fittings, chemical tubing, backwash pit, and pipe supports) Lump-Sum 1 9 Renovate Inside of Existing Wet Well [Interior Roof, Interior Walls, Interior Floor Slab] – includes repairing spalled concrete, crack repairs (Detail 12/Sheet S0.3), and the application of a waterproof coating on the interior floor and walls (Xypex or approved equal) Square Foot/Feet 875 10 Site grading per plan (Including landscape grading and site preparation for concrete footings and flatwork) Lump-Sum 1 11 Containment Wall (Retaining Wall and curb for grade change) Linear Foot/Feet 45 12 Pump Station Floor Drains (per plans) Each 5 13 Concrete Flat Work (including, but not limited to: concrete slab, housekeeping pads, walkway, concrete deck, chemical containment curbs) Square Foot/Feet 1020 14 Wet well regrading (Sheet C2.0 and per Detail B sheet C3.2) Square Foot/Feet 280 15 CMU Building (including, but not limited to: Concrete Foundation/Slab, Structural Walls, Fiberglass Doors, Roof, Roof Drains, Footing, Roll-up Door) Square Foot/Feet 1300 16 Covered Canopy Structure (including, but not limited to: steel beams, steel columns, fiber-cement siding, shade structure, and cantilevered shade structure at front of pump station) Lump-Sum 1 17 Access Hatch in Roof for Vertical Turbine Pump Removal Each 1 18 Wet Well Access Hatch Each 1 19 10” Insulated Heater Pipe Linear Foot/Feet 45 20 14” Insulated Heater Pipe Linear Foot/Feet 15 21 8" Pipe Linear Foot/Feet 80 22 6" Pipe Linear Foot/Feet 20 23 4" Pipe Linear Foot/Feet 40 24 3" Sewer Drain Pipe Linear Foot/Feet 80 25 2" Water Line Connection Linear Foot/Feet 120 26 Gas Line Connection Linear Foot/Feet 40 27 Valves and Fittings Lump-Sum 1 28 Backwash Piping and Associated Piping (including, but not limited to: backwash standpipe, 10-inch DWV pipe, and fittings) (Sheets M2.1 and M4.1) Lump-Sum 1 29 Heater Intake and Exhaust Pipe (including, but not limited to: 10” PVC intake pipe, 14” Double-wall Type B Vent, Insulated Wall Fittings, and Vent Cap) Lump-Sum 1 30 Water Level Sensor Each 1 31 Flow Meter and Associated Transmitter (Sheet M4.2) Each 1 32 Storm Drain System (including, but not limited to: 4” floor drain, 4” DWV pipe and fittings, 12” HDPE storm drain, 12” perforated storm drain, gravel, and nonwoven geofabric) Lump-Sum 1 33 Pressure Gauges and Transducers (Detail F/Sheet M4.4) Each 1 34 Air Relief Valve (Detail D/Sheet M4.1) Each 2 35 Pipe Pressure Test – all water lines and drain lines Lump-Sum 1 36 Control / Electrical Panels – provide and install (Sheets E1.0, E3.0, E4.0, E4.1, E6.0) Lump-Sum 1 37 Electrical Component Installations (including, but not limited to: Conduits, cables, junction boxes, outlets, switches, linear lights, exit signs, outdoor wall packs, grounding system, and safety devices) Lump-Sum 1 38 550 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install Each 2 39 100 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install Each 5 40 Chemical Controller – provide and Install (Sheets M1.0 and M3.0) Each 1 41 Acid Fume Scrubber, including, but not limited to: acid fume scrubber, wall mount kit, tubing, and tank connection) Each 1 42 Wrought Iron Fence* (Around Pump Station, including, but not limited to: fence, posts, and post footings) [*– does not include Pool Perimeter Fencing] Linear Foot/Feet 176 43 Wrought Iron Gate - Single (including, but not limited to: gate, posts, and post footings) Each 2 44 Wrought Iron Gate - Double (including, but not limited to: gate, posts, and post footings) Each 2 45 Pool Equipment Start-up – Testing, Function adjustments, Calibration as needed Lump-Sum 1 46 Operations & Maintenance – Manual, 30-Day Break-in Period Lump-Sum 1 | 1 | Mobilization, Site prep (identify all components for ‘selective demolition’ – pool equipment, concrete, mechanical, electrical, underground utilities; Pool Deck Protection measures); Required Permit(s); Required insurances | Lump-Sum | 1 | 2 | Pool Plaster Protection Measures | Lump-Sum | 1 | 3 | Equipment Relocation Cost (remove, store, re-install saved equipment) | Lump-Sum | 1 | 4 | Demolition and hauling of existing landscaping | Lump-Sum | 1 | 5 | Demolition and hauling of vertical structures (including, but not limited to: existing pump station building and footing, chain-link fences, existing canopy above chemical tanks, storage shed, and gates) | Lump-Sum | 1 | 6 | Demolition and hauling of the concrete slab sections (per callout D1 and D9 on sheet D1.0 of the plan set) | Lump-Sum | 1 | 7 | Demolition and hauling of electrical materials (including, but not limited to: electrical panels, wires, conduits, lights, receptacles, and junction boxes) (Sheets E1.0D & E2.0D) | Lump-Sum | 1 | 8 | Demolition and hauling of mechanical materials/systems (including, but not limited to: pipes, valves, fittings, chemical tubing, backwash pit, and pipe supports) | Lump-Sum | 1 | 9 | Renovate Inside of Existing Wet Well [Interior Roof, Interior Walls, Interior Floor Slab] – includes repairing spalled concrete, crack repairs (Detail 12/Sheet S0.3), and the application of a waterproof coating on the interior floor and walls (Xypex or approved equal) | Square Foot/Feet | 875 | 10 | Site grading per plan (Including landscape grading and site preparation for concrete footings and flatwork) | Lump-Sum | 1 | 11 | Containment Wall (Retaining Wall and curb for grade change) | Linear Foot/Feet | 45 | 12 | Pump Station Floor Drains (per plans) | Each | 5 | 13 | Concrete Flat Work (including, but not limited to: concrete slab, housekeeping pads, walkway, concrete deck, chemical containment curbs) | Square Foot/Feet | 1020 | 14 | Wet well regrading (Sheet C2.0 and per Detail B sheet C3.2) | Square Foot/Feet | 280 | 15 | CMU Building (including, but not limited to: Concrete Foundation/Slab, Structural Walls, Fiberglass Doors, Roof, Roof Drains, Footing, Roll-up Door) | Square Foot/Feet | 1300 | 16 | Covered Canopy Structure (including, but not limited to: steel beams, steel columns, fiber-cement siding, shade structure, and cantilevered shade structure at front of pump station) | Lump-Sum | 1 | 17 | Access Hatch in Roof for Vertical Turbine Pump Removal | Each | 1 | 18 | Wet Well Access Hatch | Each | 1 | 19 | 10” Insulated Heater Pipe | Linear Foot/Feet | 45 | 20 | 14” Insulated Heater Pipe | Linear Foot/Feet | 15 | 21 | 8" Pipe | Linear Foot/Feet | 80 | 22 | 6" Pipe | Linear Foot/Feet | 20 | 23 | 4" Pipe | Linear Foot/Feet | 40 | 24 | 3" Sewer Drain Pipe | Linear Foot/Feet | 80 | 25 | 2" Water Line Connection | Linear Foot/Feet | 120 | 26 | Gas Line Connection | Linear Foot/Feet | 40 | 27 | Valves and Fittings | Lump-Sum | 1 | 28 | Backwash Piping and Associated Piping (including, but not limited to: backwash standpipe, 10-inch DWV pipe, and fittings) (Sheets M2.1 and M4.1) | Lump-Sum | 1 | 29 | Heater Intake and Exhaust Pipe (including, but not limited to: 10” PVC intake pipe, 14” Double-wall Type B Vent, Insulated Wall Fittings, and Vent Cap) | Lump-Sum | 1 | 30 | Water Level Sensor | Each | 1 | 31 | Flow Meter and Associated Transmitter (Sheet M4.2) | Each | 1 | 32 | Storm Drain System (including, but not limited to: 4” floor drain, 4” DWV pipe and fittings, 12” HDPE storm drain, 12” perforated storm drain, gravel, and nonwoven geofabric) | Lump-Sum | 1 | 33 | Pressure Gauges and Transducers (Detail F/Sheet M4.4) | Each | 1 | 34 | Air Relief Valve (Detail D/Sheet M4.1) | Each | 2 | 35 | Pipe Pressure Test – all water lines and drain lines | Lump-Sum | 1 | 36 | Control / Electrical Panels – provide and install (Sheets E1.0, E3.0, E4.0, E4.1, E6.0) | Lump-Sum | 1 | 37 | Electrical Component Installations (including, but not limited to: Conduits, cables, junction boxes, outlets, switches, linear lights, exit signs, outdoor wall packs, grounding system, and safety devices) | Lump-Sum | 1 | 38 | 550 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install | Each | 2 | 39 | 100 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install | Each | 5 | 40 | Chemical Controller – provide and Install (Sheets M1.0 and M3.0) | Each | 1 | 41 | Acid Fume Scrubber, including, but not limited to: acid fume scrubber, wall mount kit, tubing, and tank connection) | Each | 1 | 42 | Wrought Iron Fence* (Around Pump Station, including, but not limited to: fence, posts, and post footings) [*– does not include Pool Perimeter Fencing] | Linear Foot/Feet | 176 | 43 | Wrought Iron Gate - Single (including, but not limited to: gate, posts, and post footings) | Each | 2 | 44 | Wrought Iron Gate - Double (including, but not limited to: gate, posts, and post footings) | Each | 2 | 45 | Pool Equipment Start-up – Testing, Function adjustments, Calibration as needed | Lump-Sum | 1 | 46 | Operations & Maintenance – Manual, 30-Day Break-in Period | Lump-Sum | 1 | | | Code Description UOM Qty | | 1 Mobilization, Site prep (identify all components for ‘selective demolition’ – pool equipment, concrete, mechanical, electrical, underground utilities; Pool Deck Protection measures); Required Permit(s); Required insurances Lump-Sum 1 2 Pool Plaster Protection Measures Lump-Sum 1 3 Equipment Relocation Cost (remove, store, re-install saved equipment) Lump-Sum 1 4 Demolition and hauling of existing landscaping Lump-Sum 1 5 Demolition and hauling of vertical structures (including, but not limited to: existing pump station building and footing, chain-link fences, existing canopy above chemical tanks, storage shed, and gates) Lump-Sum 1 6 Demolition and hauling of the concrete slab sections (per callout D1 and D9 on sheet D1.0 of the plan set) Lump-Sum 1 7 Demolition and hauling of electrical materials (including, but not limited to: electrical panels, wires, conduits, lights, receptacles, and junction boxes) (Sheets E1.0D & E2.0D) Lump-Sum 1 8 Demolition and hauling of mechanical materials/systems (including, but not limited to: pipes, valves, fittings, chemical tubing, backwash pit, and pipe supports) Lump-Sum 1 9 Renovate Inside of Existing Wet Well [Interior Roof, Interior Walls, Interior Floor Slab] – includes repairing spalled concrete, crack repairs (Detail 12/Sheet S0.3), and the application of a waterproof coating on the interior floor and walls (Xypex or approved equal) Square Foot/Feet 875 10 Site grading per plan (Including landscape grading and site preparation for concrete footings and flatwork) Lump-Sum 1 11 Containment Wall (Retaining Wall and curb for grade change) Linear Foot/Feet 45 12 Pump Station Floor Drains (per plans) Each 5 13 Concrete Flat Work (including, but not limited to: concrete slab, housekeeping pads, walkway, concrete deck, chemical containment curbs) Square Foot/Feet 1020 14 Wet well regrading (Sheet C2.0 and per Detail B sheet C3.2) Square Foot/Feet 280 15 CMU Building (including, but not limited to: Concrete Foundation/Slab, Structural Walls, Fiberglass Doors, Roof, Roof Drains, Footing, Roll-up Door) Square Foot/Feet 1300 16 Covered Canopy Structure (including, but not limited to: steel beams, steel columns, fiber-cement siding, shade structure, and cantilevered shade structure at front of pump station) Lump-Sum 1 17 Access Hatch in Roof for Vertical Turbine Pump Removal Each 1 18 Wet Well Access Hatch Each 1 19 10” Insulated Heater Pipe Linear Foot/Feet 45 20 14” Insulated Heater Pipe Linear Foot/Feet 15 21 8" Pipe Linear Foot/Feet 80 22 6" Pipe Linear Foot/Feet 20 23 4" Pipe Linear Foot/Feet 40 24 3" Sewer Drain Pipe Linear Foot/Feet 80 25 2" Water Line Connection Linear Foot/Feet 120 26 Gas Line Connection Linear Foot/Feet 40 27 Valves and Fittings Lump-Sum 1 28 Backwash Piping and Associated Piping (including, but not limited to: backwash standpipe, 10-inch DWV pipe, and fittings) (Sheets M2.1 and M4.1) Lump-Sum 1 29 Heater Intake and Exhaust Pipe (including, but not limited to: 10” PVC intake pipe, 14” Double-wall Type B Vent, Insulated Wall Fittings, and Vent Cap) Lump-Sum 1 30 Water Level Sensor Each 1 31 Flow Meter and Associated Transmitter (Sheet M4.2) Each 1 32 Storm Drain System (including, but not limited to: 4” floor drain, 4” DWV pipe and fittings, 12” HDPE storm drain, 12” perforated storm drain, gravel, and nonwoven geofabric) Lump-Sum 1 33 Pressure Gauges and Transducers (Detail F/Sheet M4.4) Each 1 34 Air Relief Valve (Detail D/Sheet M4.1) Each 2 35 Pipe Pressure Test – all water lines and drain lines Lump-Sum 1 36 Control / Electrical Panels – provide and install (Sheets E1.0, E3.0, E4.0, E4.1, E6.0) Lump-Sum 1 37 Electrical Component Installations (including, but not limited to: Conduits, cables, junction boxes, outlets, switches, linear lights, exit signs, outdoor wall packs, grounding system, and safety devices) Lump-Sum 1 38 550 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install Each 2 39 100 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install Each 5 40 Chemical Controller – provide and Install (Sheets M1.0 and M3.0) Each 1 41 Acid Fume Scrubber, including, but not limited to: acid fume scrubber, wall mount kit, tubing, and tank connection) Each 1 42 Wrought Iron Fence* (Around Pump Station, including, but not limited to: fence, posts, and post footings) [*– does not include Pool Perimeter Fencing] Linear Foot/Feet 176 43 Wrought Iron Gate - Single (including, but not limited to: gate, posts, and post footings) Each 2 44 Wrought Iron Gate - Double (including, but not limited to: gate, posts, and post footings) Each 2 45 Pool Equipment Start-up – Testing, Function adjustments, Calibration as needed Lump-Sum 1 46 Operations & Maintenance – Manual, 30-Day Break-in Period Lump-Sum 1 | 1 | Mobilization, Site prep (identify all components for ‘selective demolition’ – pool equipment, concrete, mechanical, electrical, underground utilities; Pool Deck Protection measures); Required Permit(s); Required insurances | Lump-Sum | 1 | 2 | Pool Plaster Protection Measures | Lump-Sum | 1 | 3 | Equipment Relocation Cost (remove, store, re-install saved equipment) | Lump-Sum | 1 | 4 | Demolition and hauling of existing landscaping | Lump-Sum | 1 | 5 | Demolition and hauling of vertical structures (including, but not limited to: existing pump station building and footing, chain-link fences, existing canopy above chemical tanks, storage shed, and gates) | Lump-Sum | 1 | 6 | Demolition and hauling of the concrete slab sections (per callout D1 and D9 on sheet D1.0 of the plan set) | Lump-Sum | 1 | 7 | Demolition and hauling of electrical materials (including, but not limited to: electrical panels, wires, conduits, lights, receptacles, and junction boxes) (Sheets E1.0D & E2.0D) | Lump-Sum | 1 | 8 | Demolition and hauling of mechanical materials/systems (including, but not limited to: pipes, valves, fittings, chemical tubing, backwash pit, and pipe supports) | Lump-Sum | 1 | 9 | Renovate Inside of Existing Wet Well [Interior Roof, Interior Walls, Interior Floor Slab] – includes repairing spalled concrete, crack repairs (Detail 12/Sheet S0.3), and the application of a waterproof coating on the interior floor and walls (Xypex or approved equal) | Square Foot/Feet | 875 | 10 | Site grading per plan (Including landscape grading and site preparation for concrete footings and flatwork) | Lump-Sum | 1 | 11 | Containment Wall (Retaining Wall and curb for grade change) | Linear Foot/Feet | 45 | 12 | Pump Station Floor Drains (per plans) | Each | 5 | 13 | Concrete Flat Work (including, but not limited to: concrete slab, housekeeping pads, walkway, concrete deck, chemical containment curbs) | Square Foot/Feet | 1020 | 14 | Wet well regrading (Sheet C2.0 and per Detail B sheet C3.2) | Square Foot/Feet | 280 | 15 | CMU Building (including, but not limited to: Concrete Foundation/Slab, Structural Walls, Fiberglass Doors, Roof, Roof Drains, Footing, Roll-up Door) | Square Foot/Feet | 1300 | 16 | Covered Canopy Structure (including, but not limited to: steel beams, steel columns, fiber-cement siding, shade structure, and cantilevered shade structure at front of pump station) | Lump-Sum | 1 | 17 | Access Hatch in Roof for Vertical Turbine Pump Removal | Each | 1 | 18 | Wet Well Access Hatch | Each | 1 | 19 | 10” Insulated Heater Pipe | Linear Foot/Feet | 45 | 20 | 14” Insulated Heater Pipe | Linear Foot/Feet | 15 | 21 | 8" Pipe | Linear Foot/Feet | 80 | 22 | 6" Pipe | Linear Foot/Feet | 20 | 23 | 4" Pipe | Linear Foot/Feet | 40 | 24 | 3" Sewer Drain Pipe | Linear Foot/Feet | 80 | 25 | 2" Water Line Connection | Linear Foot/Feet | 120 | 26 | Gas Line Connection | Linear Foot/Feet | 40 | 27 | Valves and Fittings | Lump-Sum | 1 | 28 | Backwash Piping and Associated Piping (including, but not limited to: backwash standpipe, 10-inch DWV pipe, and fittings) (Sheets M2.1 and M4.1) | Lump-Sum | 1 | 29 | Heater Intake and Exhaust Pipe (including, but not limited to: 10” PVC intake pipe, 14” Double-wall Type B Vent, Insulated Wall Fittings, and Vent Cap) | Lump-Sum | 1 | 30 | Water Level Sensor | Each | 1 | 31 | Flow Meter and Associated Transmitter (Sheet M4.2) | Each | 1 | 32 | Storm Drain System (including, but not limited to: 4” floor drain, 4” DWV pipe and fittings, 12” HDPE storm drain, 12” perforated storm drain, gravel, and nonwoven geofabric) | Lump-Sum | 1 | 33 | Pressure Gauges and Transducers (Detail F/Sheet M4.4) | Each | 1 | 34 | Air Relief Valve (Detail D/Sheet M4.1) | Each | 2 | 35 | Pipe Pressure Test – all water lines and drain lines | Lump-Sum | 1 | 36 | Control / Electrical Panels – provide and install (Sheets E1.0, E3.0, E4.0, E4.1, E6.0) | Lump-Sum | 1 | 37 | Electrical Component Installations (including, but not limited to: Conduits, cables, junction boxes, outlets, switches, linear lights, exit signs, outdoor wall packs, grounding system, and safety devices) | Lump-Sum | 1 | 38 | 550 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install | Each | 2 | 39 | 100 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install | Each | 5 | 40 | Chemical Controller – provide and Install (Sheets M1.0 and M3.0) | Each | 1 | 41 | Acid Fume Scrubber, including, but not limited to: acid fume scrubber, wall mount kit, tubing, and tank connection) | Each | 1 | 42 | Wrought Iron Fence* (Around Pump Station, including, but not limited to: fence, posts, and post footings) [*– does not include Pool Perimeter Fencing] | Linear Foot/Feet | 176 | 43 | Wrought Iron Gate - Single (including, but not limited to: gate, posts, and post footings) | Each | 2 | 44 | Wrought Iron Gate - Double (including, but not limited to: gate, posts, and post footings) | Each | 2 | 45 | Pool Equipment Start-up – Testing, Function adjustments, Calibration as needed | Lump-Sum | 1 | 46 | Operations & Maintenance – Manual, 30-Day Break-in Period | Lump-Sum | 1 | | | 1 | Mobilization, Site prep (identify all components for ‘selective demolition’ – pool equipment, concrete, mechanical, electrical, underground utilities; Pool Deck Protection measures); Required Permit(s); Required insurances | Lump-Sum | 1 | | 2 | Pool Plaster Protection Measures | Lump-Sum | 1 | | 3 | Equipment Relocation Cost (remove, store, re-install saved equipment) | Lump-Sum | 1 | | 4 | Demolition and hauling of existing landscaping | Lump-Sum | 1 | | 5 | Demolition and hauling of vertical structures (including, but not limited to: existing pump station building and footing, chain-link fences, existing canopy above chemical tanks, storage shed, and gates) | Lump-Sum | 1 | | 6 | Demolition and hauling of the concrete slab sections (per callout D1 and D9 on sheet D1.0 of the plan set) | Lump-Sum | 1 | | 7 | Demolition and hauling of electrical materials (including, but not limited to: electrical panels, wires, conduits, lights, receptacles, and junction boxes) (Sheets E1.0D & E2.0D) | Lump-Sum | 1 | | 8 | Demolition and hauling of mechanical materials/systems (including, but not limited to: pipes, valves, fittings, chemical tubing, backwash pit, and pipe supports) | Lump-Sum | 1 | | 9 | Renovate Inside of Existing Wet Well [Interior Roof, Interior Walls, Interior Floor Slab] – includes repairing spalled concrete, crack repairs (Detail 12/Sheet S0.3), and the application of a waterproof coating on the interior floor and walls (Xypex or approved equal) | Square Foot/Feet | 875 | | 10 | Site grading per plan (Including landscape grading and site preparation for concrete footings and flatwork) | Lump-Sum | 1 | | 11 | Containment Wall (Retaining Wall and curb for grade change) | Linear Foot/Feet | 45 | | 12 | Pump Station Floor Drains (per plans) | Each | 5 | | 13 | Concrete Flat Work (including, but not limited to: concrete slab, housekeeping pads, walkway, concrete deck, chemical containment curbs) | Square Foot/Feet | 1020 | | 14 | Wet well regrading (Sheet C2.0 and per Detail B sheet C3.2) | Square Foot/Feet | 280 | | 15 | CMU Building (including, but not limited to: Concrete Foundation/Slab, Structural Walls, Fiberglass Doors, Roof, Roof Drains, Footing, Roll-up Door) | Square Foot/Feet | 1300 | | 16 | Covered Canopy Structure (including, but not limited to: steel beams, steel columns, fiber-cement siding, shade structure, and cantilevered shade structure at front of pump station) | Lump-Sum | 1 | | 17 | Access Hatch in Roof for Vertical Turbine Pump Removal | Each | 1 | | 18 | Wet Well Access Hatch | Each | 1 | | 19 | 10” Insulated Heater Pipe | Linear Foot/Feet | 45 | | 20 | 14” Insulated Heater Pipe | Linear Foot/Feet | 15 | | 21 | 8" Pipe | Linear Foot/Feet | 80 | | 22 | 6" Pipe | Linear Foot/Feet | 20 | | 23 | 4" Pipe | Linear Foot/Feet | 40 | | 24 | 3" Sewer Drain Pipe | Linear Foot/Feet | 80 | | 25 | 2" Water Line Connection | Linear Foot/Feet | 120 | | 26 | Gas Line Connection | Linear Foot/Feet | 40 | | 27 | Valves and Fittings | Lump-Sum | 1 | | 28 | Backwash Piping and Associated Piping (including, but not limited to: backwash standpipe, 10-inch DWV pipe, and fittings) (Sheets M2.1 and M4.1) | Lump-Sum | 1 | | 29 | Heater Intake and Exhaust Pipe (including, but not limited to: 10” PVC intake pipe, 14” Double-wall Type B Vent, Insulated Wall Fittings, and Vent Cap) | Lump-Sum | 1 | | 30 | Water Level Sensor | Each | 1 | | 31 | Flow Meter and Associated Transmitter (Sheet M4.2) | Each | 1 | | 32 | Storm Drain System (including, but not limited to: 4” floor drain, 4” DWV pipe and fittings, 12” HDPE storm drain, 12” perforated storm drain, gravel, and nonwoven geofabric) | Lump-Sum | 1 | | 33 | Pressure Gauges and Transducers (Detail F/Sheet M4.4) | Each | 1 | | 34 | Air Relief Valve (Detail D/Sheet M4.1) | Each | 2 | | 35 | Pipe Pressure Test – all water lines and drain lines | Lump-Sum | 1 | | 36 | Control / Electrical Panels – provide and install (Sheets E1.0, E3.0, E4.0, E4.1, E6.0) | Lump-Sum | 1 | | 37 | Electrical Component Installations (including, but not limited to: Conduits, cables, junction boxes, outlets, switches, linear lights, exit signs, outdoor wall packs, grounding system, and safety devices) | Lump-Sum | 1 | | 38 | 550 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install | Each | 2 | | 39 | 100 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install | Each | 5 | | 40 | Chemical Controller – provide and Install (Sheets M1.0 and M3.0) | Each | 1 | | 41 | Acid Fume Scrubber, including, but not limited to: acid fume scrubber, wall mount kit, tubing, and tank connection) | Each | 1 | | 42 | Wrought Iron Fence* (Around Pump Station, including, but not limited to: fence, posts, and post footings) [*– does not include Pool Perimeter Fencing] | Linear Foot/Feet | 176 | | 43 | Wrought Iron Gate - Single (including, but not limited to: gate, posts, and post footings) | Each | 2 | | 44 | Wrought Iron Gate - Double (including, but not limited to: gate, posts, and post footings) | Each | 2 | | 45 | Pool Equipment Start-up – Testing, Function adjustments, Calibration as needed | Lump-Sum | 1 | | 46 | Operations & Maintenance – Manual, 30-Day Break-in Period | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Code Description UOM Qty | | 1 Mobilization, Site prep (identify all components for ‘selective demolition’ – pool equipment, concrete, mechanical, electrical, underground utilities; Pool Deck Protection measures); Required Permit(s); Required insurances Lump-Sum 1 2 Pool Plaster Protection Measures Lump-Sum 1 3 Equipment Relocation Cost (remove, store, re-install saved equipment) Lump-Sum 1 4 Demolition and hauling of existing landscaping Lump-Sum 1 5 Demolition and hauling of vertical structures (including, but not limited to: existing pump station building and footing, chain-link fences, existing canopy above chemical tanks, storage shed, and gates) Lump-Sum 1 6 Demolition and hauling of the concrete slab sections (per callout D1 and D9 on sheet D1.0 of the plan set) Lump-Sum 1 7 Demolition and hauling of electrical materials (including, but not limited to: electrical panels, wires, conduits, lights, receptacles, and junction boxes) (Sheets E1.0D & E2.0D) Lump-Sum 1 8 Demolition and hauling of mechanical materials/systems (including, but not limited to: pipes, valves, fittings, chemical tubing, backwash pit, and pipe supports) Lump-Sum 1 9 Renovate Inside of Existing Wet Well [Interior Roof, Interior Walls, Interior Floor Slab] – includes repairing spalled concrete, crack repairs (Detail 12/Sheet S0.3), and the application of a waterproof coating on the interior floor and walls (Xypex or approved equal) Square Foot/Feet 875 10 Site grading per plan (Including landscape grading and site preparation for concrete footings and flatwork) Lump-Sum 1 11 Containment Wall (Retaining Wall and curb for grade change) Linear Foot/Feet 45 12 Pump Station Floor Drains (per plans) Each 5 13 Concrete Flat Work (including, but not limited to: concrete slab, housekeeping pads, walkway, concrete deck, chemical containment curbs) Square Foot/Feet 1020 14 Wet well regrading (Sheet C2.0 and per Detail B sheet C3.2) Square Foot/Feet 280 15 CMU Building (including, but not limited to: Concrete Foundation/Slab, Structural Walls, Fiberglass Doors, Roof, Roof Drains, Footing, Roll-up Door) Square Foot/Feet 1300 16 Covered Canopy Structure (including, but not limited to: steel beams, steel columns, fiber-cement siding, shade structure, and cantilevered shade structure at front of pump station) Lump-Sum 1 17 Access Hatch in Roof for Vertical Turbine Pump Removal Each 1 18 Wet Well Access Hatch Each 1 19 10” Insulated Heater Pipe Linear Foot/Feet 45 20 14” Insulated Heater Pipe Linear Foot/Feet 15 21 8" Pipe Linear Foot/Feet 80 22 6" Pipe Linear Foot/Feet 20 23 4" Pipe Linear Foot/Feet 40 24 3" Sewer Drain Pipe Linear Foot/Feet 80 25 2" Water Line Connection Linear Foot/Feet 120 26 Gas Line Connection Linear Foot/Feet 40 27 Valves and Fittings Lump-Sum 1 28 Backwash Piping and Associated Piping (including, but not limited to: backwash standpipe, 10-inch DWV pipe, and fittings) (Sheets M2.1 and M4.1) Lump-Sum 1 29 Heater Intake and Exhaust Pipe (including, but not limited to: 10” PVC intake pipe, 14” Double-wall Type B Vent, Insulated Wall Fittings, and Vent Cap) Lump-Sum 1 30 Water Level Sensor Each 1 31 Flow Meter and Associated Transmitter (Sheet M4.2) Each 1 32 Storm Drain System (including, but not limited to: 4” floor drain, 4” DWV pipe and fittings, 12” HDPE storm drain, 12” perforated storm drain, gravel, and nonwoven geofabric) Lump-Sum 1 33 Pressure Gauges and Transducers (Detail F/Sheet M4.4) Each 1 34 Air Relief Valve (Detail D/Sheet M4.1) Each 2 35 Pipe Pressure Test – all water lines and drain lines Lump-Sum 1 36 Control / Electrical Panels – provide and install (Sheets E1.0, E3.0, E4.0, E4.1, E6.0) Lump-Sum 1 37 Electrical Component Installations (including, but not limited to: Conduits, cables, junction boxes, outlets, switches, linear lights, exit signs, outdoor wall packs, grounding system, and safety devices) Lump-Sum 1 38 550 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install Each 2 39 100 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install Each 5 40 Chemical Controller – provide and Install (Sheets M1.0 and M3.0) Each 1 41 Acid Fume Scrubber, including, but not limited to: acid fume scrubber, wall mount kit, tubing, and tank connection) Each 1 42 Wrought Iron Fence* (Around Pump Station, including, but not limited to: fence, posts, and post footings) [*– does not include Pool Perimeter Fencing] Linear Foot/Feet 176 43 Wrought Iron Gate - Single (including, but not limited to: gate, posts, and post footings) Each 2 44 Wrought Iron Gate - Double (including, but not limited to: gate, posts, and post footings) Each 2 45 Pool Equipment Start-up – Testing, Function adjustments, Calibration as needed Lump-Sum 1 46 Operations & Maintenance – Manual, 30-Day Break-in Period Lump-Sum 1 | 1 | Mobilization, Site prep (identify all components for ‘selective demolition’ – pool equipment, concrete, mechanical, electrical, underground utilities; Pool Deck Protection measures); Required Permit(s); Required insurances | Lump-Sum | 1 | 2 | Pool Plaster Protection Measures | Lump-Sum | 1 | 3 | Equipment Relocation Cost (remove, store, re-install saved equipment) | Lump-Sum | 1 | 4 | Demolition and hauling of existing landscaping | Lump-Sum | 1 | 5 | Demolition and hauling of vertical structures (including, but not limited to: existing pump station building and footing, chain-link fences, existing canopy above chemical tanks, storage shed, and gates) | Lump-Sum | 1 | 6 | Demolition and hauling of the concrete slab sections (per callout D1 and D9 on sheet D1.0 of the plan set) | Lump-Sum | 1 | 7 | Demolition and hauling of electrical materials (including, but not limited to: electrical panels, wires, conduits, lights, receptacles, and junction boxes) (Sheets E1.0D & E2.0D) | Lump-Sum | 1 | 8 | Demolition and hauling of mechanical materials/systems (including, but not limited to: pipes, valves, fittings, chemical tubing, backwash pit, and pipe supports) | Lump-Sum | 1 | 9 | Renovate Inside of Existing Wet Well [Interior Roof, Interior Walls, Interior Floor Slab] – includes repairing spalled concrete, crack repairs (Detail 12/Sheet S0.3), and the application of a waterproof coating on the interior floor and walls (Xypex or approved equal) | Square Foot/Feet | 875 | 10 | Site grading per plan (Including landscape grading and site preparation for concrete footings and flatwork) | Lump-Sum | 1 | 11 | Containment Wall (Retaining Wall and curb for grade change) | Linear Foot/Feet | 45 | 12 | Pump Station Floor Drains (per plans) | Each | 5 | 13 | Concrete Flat Work (including, but not limited to: concrete slab, housekeeping pads, walkway, concrete deck, chemical containment curbs) | Square Foot/Feet | 1020 | 14 | Wet well regrading (Sheet C2.0 and per Detail B sheet C3.2) | Square Foot/Feet | 280 | 15 | CMU Building (including, but not limited to: Concrete Foundation/Slab, Structural Walls, Fiberglass Doors, Roof, Roof Drains, Footing, Roll-up Door) | Square Foot/Feet | 1300 | 16 | Covered Canopy Structure (including, but not limited to: steel beams, steel columns, fiber-cement siding, shade structure, and cantilevered shade structure at front of pump station) | Lump-Sum | 1 | 17 | Access Hatch in Roof for Vertical Turbine Pump Removal | Each | 1 | 18 | Wet Well Access Hatch | Each | 1 | 19 | 10” Insulated Heater Pipe | Linear Foot/Feet | 45 | 20 | 14” Insulated Heater Pipe | Linear Foot/Feet | 15 | 21 | 8" Pipe | Linear Foot/Feet | 80 | 22 | 6" Pipe | Linear Foot/Feet | 20 | 23 | 4" Pipe | Linear Foot/Feet | 40 | 24 | 3" Sewer Drain Pipe | Linear Foot/Feet | 80 | 25 | 2" Water Line Connection | Linear Foot/Feet | 120 | 26 | Gas Line Connection | Linear Foot/Feet | 40 | 27 | Valves and Fittings | Lump-Sum | 1 | 28 | Backwash Piping and Associated Piping (including, but not limited to: backwash standpipe, 10-inch DWV pipe, and fittings) (Sheets M2.1 and M4.1) | Lump-Sum | 1 | 29 | Heater Intake and Exhaust Pipe (including, but not limited to: 10” PVC intake pipe, 14” Double-wall Type B Vent, Insulated Wall Fittings, and Vent Cap) | Lump-Sum | 1 | 30 | Water Level Sensor | Each | 1 | 31 | Flow Meter and Associated Transmitter (Sheet M4.2) | Each | 1 | 32 | Storm Drain System (including, but not limited to: 4” floor drain, 4” DWV pipe and fittings, 12” HDPE storm drain, 12” perforated storm drain, gravel, and nonwoven geofabric) | Lump-Sum | 1 | 33 | Pressure Gauges and Transducers (Detail F/Sheet M4.4) | Each | 1 | 34 | Air Relief Valve (Detail D/Sheet M4.1) | Each | 2 | 35 | Pipe Pressure Test – all water lines and drain lines | Lump-Sum | 1 | 36 | Control / Electrical Panels – provide and install (Sheets E1.0, E3.0, E4.0, E4.1, E6.0) | Lump-Sum | 1 | 37 | Electrical Component Installations (including, but not limited to: Conduits, cables, junction boxes, outlets, switches, linear lights, exit signs, outdoor wall packs, grounding system, and safety devices) | Lump-Sum | 1 | 38 | 550 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install | Each | 2 | 39 | 100 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install | Each | 5 | 40 | Chemical Controller – provide and Install (Sheets M1.0 and M3.0) | Each | 1 | 41 | Acid Fume Scrubber, including, but not limited to: acid fume scrubber, wall mount kit, tubing, and tank connection) | Each | 1 | 42 | Wrought Iron Fence* (Around Pump Station, including, but not limited to: fence, posts, and post footings) [*– does not include Pool Perimeter Fencing] | Linear Foot/Feet | 176 | 43 | Wrought Iron Gate - Single (including, but not limited to: gate, posts, and post footings) | Each | 2 | 44 | Wrought Iron Gate - Double (including, but not limited to: gate, posts, and post footings) | Each | 2 | 45 | Pool Equipment Start-up – Testing, Function adjustments, Calibration as needed | Lump-Sum | 1 | 46 | Operations & Maintenance – Manual, 30-Day Break-in Period | Lump-Sum | 1 | | | 1 | Mobilization, Site prep (identify all components for ‘selective demolition’ – pool equipment, concrete, mechanical, electrical, underground utilities; Pool Deck Protection measures); Required Permit(s); Required insurances | Lump-Sum | 1 | | 2 | Pool Plaster Protection Measures | Lump-Sum | 1 | | 3 | Equipment Relocation Cost (remove, store, re-install saved equipment) | Lump-Sum | 1 | | 4 | Demolition and hauling of existing landscaping | Lump-Sum | 1 | | 5 | Demolition and hauling of vertical structures (including, but not limited to: existing pump station building and footing, chain-link fences, existing canopy above chemical tanks, storage shed, and gates) | Lump-Sum | 1 | | 6 | Demolition and hauling of the concrete slab sections (per callout D1 and D9 on sheet D1.0 of the plan set) | Lump-Sum | 1 | | 7 | Demolition and hauling of electrical materials (including, but not limited to: electrical panels, wires, conduits, lights, receptacles, and junction boxes) (Sheets E1.0D & E2.0D) | Lump-Sum | 1 | | 8 | Demolition and hauling of mechanical materials/systems (including, but not limited to: pipes, valves, fittings, chemical tubing, backwash pit, and pipe supports) | Lump-Sum | 1 | | 9 | Renovate Inside of Existing Wet Well [Interior Roof, Interior Walls, Interior Floor Slab] – includes repairing spalled concrete, crack repairs (Detail 12/Sheet S0.3), and the application of a waterproof coating on the interior floor and walls (Xypex or approved equal) | Square Foot/Feet | 875 | | 10 | Site grading per plan (Including landscape grading and site preparation for concrete footings and flatwork) | Lump-Sum | 1 | | 11 | Containment Wall (Retaining Wall and curb for grade change) | Linear Foot/Feet | 45 | | 12 | Pump Station Floor Drains (per plans) | Each | 5 | | 13 | Concrete Flat Work (including, but not limited to: concrete slab, housekeeping pads, walkway, concrete deck, chemical containment curbs) | Square Foot/Feet | 1020 | | 14 | Wet well regrading (Sheet C2.0 and per Detail B sheet C3.2) | Square Foot/Feet | 280 | | 15 | CMU Building (including, but not limited to: Concrete Foundation/Slab, Structural Walls, Fiberglass Doors, Roof, Roof Drains, Footing, Roll-up Door) | Square Foot/Feet | 1300 | | 16 | Covered Canopy Structure (including, but not limited to: steel beams, steel columns, fiber-cement siding, shade structure, and cantilevered shade structure at front of pump station) | Lump-Sum | 1 | | 17 | Access Hatch in Roof for Vertical Turbine Pump Removal | Each | 1 | | 18 | Wet Well Access Hatch | Each | 1 | | 19 | 10” Insulated Heater Pipe | Linear Foot/Feet | 45 | | 20 | 14” Insulated Heater Pipe | Linear Foot/Feet | 15 | | 21 | 8" Pipe | Linear Foot/Feet | 80 | | 22 | 6" Pipe | Linear Foot/Feet | 20 | | 23 | 4" Pipe | Linear Foot/Feet | 40 | | 24 | 3" Sewer Drain Pipe | Linear Foot/Feet | 80 | | 25 | 2" Water Line Connection | Linear Foot/Feet | 120 | | 26 | Gas Line Connection | Linear Foot/Feet | 40 | | 27 | Valves and Fittings | Lump-Sum | 1 | | 28 | Backwash Piping and Associated Piping (including, but not limited to: backwash standpipe, 10-inch DWV pipe, and fittings) (Sheets M2.1 and M4.1) | Lump-Sum | 1 | | 29 | Heater Intake and Exhaust Pipe (including, but not limited to: 10” PVC intake pipe, 14” Double-wall Type B Vent, Insulated Wall Fittings, and Vent Cap) | Lump-Sum | 1 | | 30 | Water Level Sensor | Each | 1 | | 31 | Flow Meter and Associated Transmitter (Sheet M4.2) | Each | 1 | | 32 | Storm Drain System (including, but not limited to: 4” floor drain, 4” DWV pipe and fittings, 12” HDPE storm drain, 12” perforated storm drain, gravel, and nonwoven geofabric) | Lump-Sum | 1 | | 33 | Pressure Gauges and Transducers (Detail F/Sheet M4.4) | Each | 1 | | 34 | Air Relief Valve (Detail D/Sheet M4.1) | Each | 2 | | 35 | Pipe Pressure Test – all water lines and drain lines | Lump-Sum | 1 | | 36 | Control / Electrical Panels – provide and install (Sheets E1.0, E3.0, E4.0, E4.1, E6.0) | Lump-Sum | 1 | | 37 | Electrical Component Installations (including, but not limited to: Conduits, cables, junction boxes, outlets, switches, linear lights, exit signs, outdoor wall packs, grounding system, and safety devices) | Lump-Sum | 1 | | 38 | 550 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install | Each | 2 | | 39 | 100 CFM Exhaust Fan, Ducting, & Vent Piping – provide & install | Each | 5 | | 40 | Chemical Controller – provide and Install (Sheets M1.0 and M3.0) | Each | 1 | | 41 | Acid Fume Scrubber, including, but not limited to: acid fume scrubber, wall mount kit, tubing, and tank connection) | Each | 1 | | 42 | Wrought Iron Fence* (Around Pump Station, including, but not limited to: fence, posts, and post footings) [*– does not include Pool Perimeter Fencing] | Linear Foot/Feet | 176 | | 43 | Wrought Iron Gate - Single (including, but not limited to: gate, posts, and post footings) | Each | 2 | | 44 | Wrought Iron Gate - Double (including, but not limited to: gate, posts, and post footings) | Each | 2 | | 45 | Pool Equipment Start-up – Testing, Function adjustments, Calibration as needed | Lump-Sum | 1 | | 46 | Operations & Maintenance – Manual, 30-Day Break-in Period | Lump-Sum | 1 | **Questions and Answers**: - Q1 Arrow Right Question: Project Schedule Hello Can I please have the Project Schedule for Arrow Right Answer: Project can begin Tuesday, September 8, 2026, at the work site; the project must be ‘substantially complete’ by March 31, 2027. 03/24/2026 07:06 PM EDT 03/25/2026 07:57 PM EDT - Q2 Arrow Right Question: addendum must be acknowledged via BidNet How do i acknowledged this addendum via BidNet ? Arrow Right Answer: You will acknowledge the addendum in BidNet by signing it and including it with your bid submission. 04/02/2026 12:05 PM EDT 04/02/2026 05:24 PM EDT - Q3 Arrow Right Question: Temp Services Would the GC be able to use existing utilities (water/electrical) during the course of construction? Arrow Right Answer: Yes. ALL utilities are remaining ‘in service’ for the facility, and are available for the Contractor to use -- The Contractor will be disconnecting Electrical, Water, and Gas service lines serving the Pool Pump Room and protecting them in place (as an underground utility) during the entire construction process The Contractor would set up their temporary access connection for construction The Contractor will perform the reconnection to utilities when the new equipment is placed into service 04/03/2026 01:56 PM EDT 04/07/2026 06:46 PM EDT - Q4 Arrow Right Question: Alternate Scope of Work Can you please provide a plan sheet to specifically identify scope of work as it relates to alternate work. Arrow Right Answer: Please see Addendum No. 2. We created marked-up plan sheets to show the Alternate Bid Items - C1.0 – shows the Perimeter Fence [Alt Bid Item #2] and Concrete Flat Work [Alt. Bid Item #4] C2.0 – shows the extent of the NEW landscaping [Alt. Bid Item #7] 04/03/2026 01:58 PM EDT 04/07/2026 06:46 PM EDT - Q5 Arrow Right Question: Bid Schedule Can the bid schedule be submitted within 24 hours after the bid due date? This avoids any math errors as there are many line items to fill out. Arrow Right Answer: The completed bid schedule must be submitted at the time of bid closing and cannot be accepted after the deadline. Bidders are responsible for ensuring all required documents, including the bid schedule, are complete and accurate upon submission. 04/03/2026 01:59 PM EDT 04/07/2026 06:46 PM EDT

    Key dates

    1. March 17, 2026Published
    2. April 15, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.