SLED Opportunity · MICHIGAN · MICHIGAN

    North Marina Redevelopment

    Issued by Huron-Clinton Metropolitan Authority
    localITBMichiganSol. 8059027112
    Closed
    STATUS
    Closed
    due Jan 29, 2026
    PUBLISHED
    Dec 18, 2025
    Posting date
    JURISDICTION
    Michigan
    local
    NAICS CODE
    237990
    AI-classified industry

    AI Summary

    Invitation to bid for comprehensive marine and site construction services including seawall replacement, floating dock construction, utility installation, landscaping, and parking improvements at Lake St. Clair Metropark, Michigan.

    Opportunity details

    Solicitation No.
    8059027112
    Type / RFx
    ITB
    Status
    Active
    Level
    local
    Published Date
    December 18, 2025
    Due Date
    January 29, 2026
    NAICS Code
    237990AI guide
    Jurisdiction
    Michigan
    Agency
    Huron-Clinton Metropolitan Authority

    Description

    The work includes furnishing all labor, equipment and materials necessary to complete the work including North Marina Redevelopment to include the Installation of a steel sheet pile wall replacement seawall, and associated tieback assembly. Fabrication and installation of fixed platforms. Construction of a floating dock system with installation of associated fendering, mooring cleats, signage, and safety ladders as designated. Installation of gangway ramps connecting the fixed platforms to the floating dock system. Placement of rip-rap support stone and woody debris habitat structures, Installation of all associated anchorage devices for both fixed and floating structures. Grading of the upland site in conjunction with new features and specified grades, slopes, swales etc. Furnishing and installation of a marina bathhouse building and adjacent concrete promenade and replacement sidewalks. Furnishing and installation of upland utilities to include sanitary, gas, electrical, and potable water systems as shown. Furnishing and installation of upland landscaping, native plantings, furnishings, and site lighting as shown. Furnishing and installation of marine utility pedestals and fire pedestals. Installation of marina utility lines and features, including water, electrical, and dry fire, with connections as necessary to existing site utilities. Existing asphalt parking lot improvements & access additions, and related work, and to provide all plant, labor, supplies, new and current materials, transportation, equipment, and incidental and related items necessary to complete this Work. The Contractor agrees to perform the entire Work in accordance with: the Drawings and Specifications entitled "North Marina Redevelopment”, Lake St. Clair Metropark, Macomb County, Michigan", Project No. 502-23-702; this Contract Form; and the Contract Documents. The work includes furnishing all labor, equipment and materials necessary to complete the work including North Marina Redevelopment to include the Installation of a steel sheet pile wall replacement seawall, and associated tieback assembly. Fabrication and installation of fixed platforms. Construction of a floating dock system with installation of associated fendering, mooring cleats, signage, and safety ladders as designated. Installation of gangway ramps connecting the fixed platforms to the floating dock system. Placement of rip-rap support stone and woody debris habitat structures, Installation of all associated anchorage devices for both fixed and floating structures. Grading of the upland site in conjunction with new features and specified grades, slopes, swales etc. Furnishing and installation of a marina bathhouse building and adjacent concrete promenade and replacement sidewalks. Furnishing and installation of upland utilities to include sanitary, gas, electrical, and potable water systems as shown. Furnishing and installation of upland landscaping, native plantings, furnishings, and site lighting as shown. Furnishing and installation of marine utility pedestals and fire pedestals. Installation of marina utility lines and features, including water, electrical, and dry fire, with connections as necessary to existing site utilities. Existing asphalt parking lot improvements & access additions, and related work, and to provide all plant, labor, supplies, new and current materials, transportation, equipment, and incidental and related items necessary to complete this Work. The Contractor agrees to perform the entire Work in accordance with: the Drawings and Specifications entitled "North Marina Redevelopment”, Lake St. Clair Metropark, Macomb County, Michigan", Project No. 502-23-702; this Contract Form; and the Contract Documents.

    Key dates

    1. December 18, 2025Published
    2. January 29, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.