City of Murfreesboro seeks TDOT pre-qualified engineering firms for construction engineering inspection and project management services for the Cherry Lane Phase 3B Interchange Project involving bridge, roadway, and traffic control work over I-840. Submissions due August 18, 2026 via OpenGov portal.
The City of Murfreesboro (“City”) requests Letters of Interest for the project and services described herein to be submitted via the City’s e-Procurement Portal, OpenGov. Submittals will be received until Tuesday, August 18, 2026 at 2:00 pm Central Time.
Knowledge of and experience with maintenance of traffic, lane closure coordination, and complex traffic control operations
The City of Murfreesboro, an Equal Opportunity, Affirmative Action Employer, seeks to retain the services of a professional consultant engineering firm to provide services related to construction of the Cherry Lane Phase 3B Interchange Project, located at the Cherry
Lane/I-840 interchange in Murfreesboro, Tennessee. The project is expected to include a grade-separated interchange carrying Cherry Lane over I-840, associated ramps and approach roadway, bridge and retaining-wall construction, drainage and stormwater facilities, utility coordination, signing and pavement markings, traffic control, erosion
prevention and sediment control (EPSC), and related improvements. The project shall be accomplished in accordance with TDOT Local Programs guidelines. The professional engineering consulting firm must be on TDOT’s pre-approved list or have a completed pre- qualification form filed with TDOT by the deadline for the Letters of Interest. The prequalified firm must have unlimited status. Responsibilities of the professional consultant firm include, but are not limited to:
Required Scope of Services
• Provide overall CEI project management, construction administration, material testing, and a single point of contact for the City from preconstruction through final acceptance and closeout.
• Include a qualified materials-testing subconsultant as part of the CEI team. The material testing subconsultant shall perform all field and laboratory sampling and testing required by the contract documents, TDOT specifications, the project-specific materials requirements, and applicable federal requirements.
• Provide qualified roadway, bridge, traffic-control, EPSC, and other specialty inspection personnel to cover active work operations and maintain continuity throughout construction.
• Inspect and document construction of roadway, interchange ramps, bridge and structural components, retaining walls, drainage, utilities, pavement, signing, pavement markings, lighting/ITS elements, and all other work shown in the contract documents, as applicable.
• Monitor contractor compliance with plans, specifications, permits, approved traffic-control plans, safety requirements, and TDOT requirements; promptly identify, document, track, and verify correction of nonconforming work.
• Coordinate with the City, TDOT, contractor, utility owners, the CEI team’s material-testing subconsultant, emergency responders, and other stakeholders; lead or participate in preconstruction, progress, utility, field, and closeout meetings.
• Provide materials testing and quality assurance/quality control documentation; review certifications, test reports, shop drawings, submittals, RFIs, schedules, and contractor work plans, as required.
• Maintain complete project records, including daily reports, photographs, quantities, material and testing records, pay-item tracking, progress reports, meeting minutes, change-order support, and payment documentation.
• Monitor maintenance-of-traffic operations and coordinate planned lane closures, detours, traffic shifts, and work over or adjacent to I-840 with TDOT and affected parties, as required.
• Complete final inspections, prepare and track punch lists, verify final quantities and asbuilt information, assist with final acceptance, and compile records required for project closeout.
Estimated Schedule for Performance of Work
• Consultant selection and contract negotiation/approval - 60 Days
• CEI services to begin - 90 Days
• Anticipated construction duration - 30 months
• CEI services will continue through final acceptance, final documentation, and project closeout Firms may request consideration by submitting a letter of interest along with qualifications to
Cathy Smith, Purchasing Director, City of Murfreesboro. All letters of interest and qualifications must be uploaded to the City's online procurement portal, OpenGov, on the date and time required. Interested firms must have an online account and may register
with OpenGov at: https://procurement.opengov.com/portal/murfreesborotn. All letters of
interest must be received by the City of Murfreesboro on or before August 18, 2026 at 2:00p.m. local time. The letter of interest and qualifications shall indicate the scope of services to be completed by any sub-consultants. Payment will be made by direct cost plus net
fee not to exceed contract.
Phase I Evaluation
For Phase I evaluations firms shall submit letters of interest with firm contact information including name, address and e-mail of primary contact. The letters of interest shall also include:
• Relevant CEI experience on interchange, bridge, major roadway, and retaining-wall projects, particularly work over or adjacent to active interstate or controlled-access highway traffic.
• Experience administering projects under TDOT Local Programs and applicable federal requirements, including construction documentation, pay estimates, materials verification, change-order support, and project closeout.
• Qualifications, availability, roles, certifications, and relevant experience of the proposed project manager, bridge inspector(s), roadway inspector(s), traffic control/ MOT staff, EPSC staff, and other key personnel.
• Firm capacity and staffing depth to provide uninterrupted inspection coverage for changing construction operations, nighttime work, interstate-related operations, and concurrent work fronts.
• Specialized expertise in bridge construction inspection, TDOT lane-closure coordination, materials testing/quality assurance, utility coordination, EPSC/SWPPP compliance, and claims/change management, as applicable.
• Past performance on similar projects, including schedule management, quality of documentation, responsiveness, safety, and collaboration with public agencies ex. Size of project and unlimited prequalification status
• Disclosure of any actual or potential organizational conflict of interest arising from prior services on this project, including design, plan preparation, or other project involvement
• From the letters of interest, The City of Murfreesboro will select 3 qualified firms to submit Phase II qualifications. From this list the top ranked consultant will be selected.
Do you need the vendor cost proposal to be separated from their main response? (Choose Yes, when you want to keep costs hidden from evaluators until after reviewing technical responses).
Because this is an RFSCP, the answer will no most of the time.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.