Active SLED Opportunity · CALIFORNIA · LAS VIRGENES MUNICIPAL WATER

    On-Call/As-Needed Pipeline Repair and Pavement/Concrete Services

    Issued by Las Virgenes Municipal Water
    localRequest For BidsLas Virgenes Municipal WaterSol. 278273
    Open · 1d remaining
    DAYS TO CLOSE
    1
    due Jul 15, 2026
    PUBLISHED
    Jun 29, 2026
    Posting date
    JURISDICTION
    Las Virgenes
    local
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    Las Virgenes Municipal Water District seeks bids for on-call pipeline repair and pavement/concrete services. Contract term is one year with up to four renewals, max $2.1M per year. Bids due July 14, 2026, via Procurement Portal. Mandatory pre-bid inspection July 7, 2026.

    Opportunity details

    Solicitation No.
    278273
    Type / RFx
    Request For Bids
    Status
    open
    Level
    local
    Published Date
    June 29, 2026
    Due Date
    July 15, 2026
    NAICS Code
    237110AI guide
    Agency
    Las Virgenes Municipal Water

    Description

    The Las Virgenes Municipal Water District is seeking Bids for On-Call/As-Needed Pipeline Repair and Pavement/Concrete Services. Bids are to be submitted through the Procurement Portal at https://procurement.opengov.com/portal/lvmwd, no later than 5:00 pm on Tuesday, July 14, 2026.

     

     

    Background

    LVMWD (The District) provides drinking water, wastewater treatment, recycled water, and composting for approximately 70,000 residents that live in Calabasas, Agoura Hills, Westlake Village, Hidden Hills, and unincorporated areas of Los Angeles County, which includes areas in West Hills, Chatsworth, and the Santa Monica Mountains. There are approximately 22,000 residential and commercial customers with metered water service and sewer connections. Triunfo Sanitation District (TSD) within Ventura County is a joint venture partner with LVMWD for wastewater and recycled water services. The Triunfo Joint Powers Authority (JPA) was formed between LVMWD and TSD in 1964 to construct, operate and maintain a joint wastewater treatment system for their respective service areas, primarily within the Malibu Creek Watershed. The JPA facilities include the Tapia Water Reclamation Facility (Tapia), the Rancho Las Virgenes Composting facilities (Rancho), approximately 60 miles of trunk sewers, and a recycled water transmission and distribution system. The District also maintains a potable water distribution system that includes a number of pump stations, pressure reducing stations, and miles of pipeline of various material.

    This Contract will include the as-needed pipeline repair, installation, and relocation of various types of pipeline in the District's potable water distribution system, recycled water distribution system, trunk sewer/collections system, and at the District's Tapia, Rancho, and Westlake Facilities. This Contract will also include pavement restoration and concrete work. This contract will meet the public works contracting requirements of a formal bidding process.

    This contract does not guarantee any minimum of work to the selected bidder. The contract will be awarded for an intial term of one year with 4 one year renewals (up to 5-years). The maximum dollar amount of all task orders issued under this contract per contract year shall not exceed $2,100,000. The assignment of tasks under this agreement is at the sole discretion of the District and the District will not compensate the selected contractor for any costs related to proposing for the contract, or for gathering and furnishing required documentation, insurance certificates, bonds, and other documentation required to establish eligibility to perform the work. All work and compensation in connection with this agreement must be expressly authorized by the District through formal request or task order.

    Project Details

    • Department: Water Ops, Water System/Facilities
    • Department Head: - (-)

    Important Dates

    • Questions Due: 2026-07-11T00:00:00.000Z
    • Pre-Proposal Meeting: 2026-07-07T20:00:00.000Z — Las Virgenes Municipal Water District HQ - 4232 Las Virgenes Road, Calabasas, CA, 91302

    Evaluation Criteria

    • Introduction

      Each bidder and its bid shall comply with these instructions to bidders and the terms and conditions provided with the bid documents.

    • General Information

      The Las Virgenes Municipal Water District (District) serves the western edge of Los Angeles County including the cities of Agoura Hills, Calabasas, Hidden Hills and Westlake Village. The district occupies 122 square miles and services a population of approximately 70,000. The District provides potable water, recycled water, and sanitation (wastewater) services to its customers through three separate enterprise funds. The sanitation and recycled water services are provided through a Joint Powers Authority with the Triunfo Sanitation District.

      Las Virgenes Municipal Water District is organized under the Municipal Water District Act of 1911 (California Water Code 7100). A five-member board of directors, each elected by geographic divisions, provides governance. Directors serve overlapping four-year terms, and every two years - concurrent with installation of the newly elected board – they select board officers. The board also selects a local representative from LVMWD to serve on the Board of Directors of the Metropolitan Water District of Southern California.

      The District is requesting Bids from qualified Vendors for construction of the On-Call/As-Needed Pipeline Repair and Pavement/Concrete Services.

      To be considered, the Bid must be received electronically, through the Procurement Portal by 5:00 pm on Tuesday, July 14, 2026.

      Bids received after the above date and time will not be considered. Submitters will receive an email confirmation of receipt of the Bid. The District is not responsible for emails that fail to deliver regardless of the cause of the failure.

    • 1 - Agoura Glen Drive - 6-Inch AC Replacement

      Installation of 625-feet of new 6-inch C900, replacement of two existing 6-inch gate valves, and tap 19 new services/connect to existing service lines.

      Follow District Standards W-101 for Trench Details. Assume a 4-feet trench width.

      All spoils to be hauled off and disposal fees to be included in the pricing.

      Pricing to include traffic control and all permits from the City of Agoura Hills.

      4,000 square feet (pipe trench) of pavement to be restored back to City of Agoura Hills Standards.

      17,000 square feet of existing pavement (outside of pipe trench) to be grinded 2-inches and capped back to the City of Agoura Hills Standards.

    • General Information

      The Las Virgenes-Triunfo Joint Powers Authority (JPA) was formed between the Las Virgenes Municipal Water District (District) and the Triunfo Water and Sanitation District (TSD) in 1964 to construct, operate and maintain a joint wastewater treatment system for their respective service areas. The JPA facilities include the Tapia Water Reclamation Facility (Tapia), the Rancho Las Virgenes Composting facilities (Rancho), approximately 60 miles of trunk sewers, and an extensive recycled water transmission and distribution system.

      The Rancho Las Virgenes Composting Facility, located at 3700 Las Virgenes Rd., Calabasas, Ca., has been in service since 1994. The facility was constructed to treat and convert biosolids, from the Tapia Water Reclamation Facility (WRF), for beneficial reuse as a rich soil amendment. Tapia WRF currently treats on average 7.0 million gallons (MG) of wastewater per day and pumps approximately 80,000 gallons of combined primary and waste activated sludge to Rancho Las Virgenes. Rancho Las Virgenes produces upwards of 2,500 dry tons or 12,000 – 15,000 cubic yards of Class A compost annually.

      The District is requesting Bids from qualified Vendors for construction of theOn-Call/As-Needed Pipeline Repair and Pavement/Concrete Services.

      To be considered, the Bid must be received electronically, through the Procurement Portal by 5:00 pm on Tuesday, July 14, 2026.

      Bids received after the above date and time will not be considered. Submitters will receive an email confirmation of receipt of the Bid. The District is not responsible for emails that fail to deliver regardless of the cause of the failure. 

    • Questions and Notifications

      All questions regarding this bid must be directed through the Procurement Portal and received no later than Friday, July 10, 2026 at 5:00 pm. At the end of the Question period, a summary of all questions and responses will be posted through the Procurement Portal.

      Contact with anyone other than as directed above may be just cause for rejection of bid.

    • 2-Agoura Road 15-Inch Trunk Sewer - MH 5-C-1 to MH 4-C-1

      Replacement of 10-foot section of VCP on an existing 15-inch VCP trunk sewer between MH 5-C-1 and MH 4-C-1.

      Pricing to include all shoring and excavation equipment required to expose existing 15-inch VCP trunk sewer. All spoils to be hauled off and disposal fees to be included in the pricing.

      Bypass pumping required and sized for Q=100 gpm from MH 5-C-1 and MH 4-C-1.

      Pricing to include traffic control and all required permits from the City of Agoura Hills.

      Provide pricing for site restoration once job is completed.

    • General Information

      The Las Virgenes-Triunfo Joint Powers Authority (JPA) was formed between the Las Virgenes Municipal Water District (District) and the Triunfo Water and Sanitation District (TSD) in 1964 to construct, operate and maintain a joint wastewater treatment system for their respective service areas. The JPA facilities include the Tapia Water Reclamation Facility (Tapia), the Rancho Las Virgenes Composting facilities (Rancho), approximately 60 miles of trunk sewers, and an extensive recycled water transmission and distribution system.

      The Tapia WRF was originally constructed to treat 0.5 million gallons per day (MGD). Several expansions have increased the plant to a capacity of 12 MGD, treating wastewater to the tertiary level. Tapia currently treats on average 7.0 MGD, which is disposed of through three different means: recycled water use, discharge to the Los Angeles River, or discharge to Malibu Creek. Discharges to Malibu Creek and the Los Angeles River are regulated under a National Pollutant Elimination System (NPDES) permit issued by the Los Angeles Regional Water Quality Control Board (LARWQCB).

      The District is requesting Bids from qualified Vendors for the construction of theOn-Call/As-Needed Pipeline Repair and Pavement/Concrete Services.

      To be considered, the Bid must be received electronically, through the Procurement Portal by 5:00 pm on Tuesday, July 14, 2026.

      Bids received after the above date and time will not be considered. Submitters will receive an email confirmation of receipt of the Bid. The District is not responsible for emails that fail to deliver regardless of the cause of the failure.  Email confirmations will be sent when Bids are received.

    • Question Responses and Addendum(s)

      It is the bidder’s responsibility to ensure they access and review any question responses and resulting addendum(s) posted. The District is not responsible to notify individual potential bidders of the availability of question responses and/or resulting addendum(s) beyond this notice. The District is not responsible for lost or misdirected e-mail communications. Other than directing a bidder to a specific segment of the bid documents, questions received after the question period has ended will not be answered.

    • 3-Rancho Storm Drain Concrete and 6-Inch Pipeline Replacement

      Replacement of 200-square feet of existing concrete and 25-feet of existing curb. Dowel into existing catch basin per LACFCD Standard D-162. Slopes to match original design. Existing catch basin to remain.

      New shear gate to be installed in existing catch basin.

      Removal and replacement of existing 50-feet of 6-inch discharge line from catch basin to field. Pipeline to be replaced with schedule 80 PVC.

      Pricing to include excavation (in field and around existing catch basin) and grade restoration once 6-inch pipe replacement is completed.

      No permitting, traffic control, or disposal fees required.

    • General Information

      The Las Virgenes-Triunfo Joint Powers Authority (JPA) was formed between the Las Virgenes Municipal Water District (District) and the Triunfo Water and Sanitation District (TSD) in 1964 to construct, operate and maintain a joint wastewater treatment system for their respective service areas. The JPA facilities include the Tapia Water Reclamation Facility (Tapia), the Rancho Las Virgenes Composting facilities (Rancho), approximately 60 miles of trunk sewers, and an extensive recycled water transmission and distribution system.

      JPA is pursuing indirect potable reuse (IPR) through the Pure Water Project Las Virgenes-Triunfo (Project) to produce a new, local, drought resilient water supply through California surface water source augmentation project (SWSAP) (https://www.waterboards.ca.gov/drinking_water/certlic/drinkingwater/documents/swa/s wafinalregtext.pdf). The fundamental plan is to build an Advanced Water Purification Facility (AWPF) to treat tertiary effluent from the Tapia Water Reclamation Facility (WRF) for IPR, and convey the purified water to the Las Virgenes Reservoir, where it will be blended with the existing Metropolitan Water District of Southern California (Metropolitan) supply in the reservoir.

      The District is requesting Bids from qualified Vendors to provide On-Call/As-Needed Pipeline Repair and Pavement/Concrete Services.

      To be considered, the Bid must be received electronically, through the Procurement Portal by 5:00 pm on Tuesday, July 14, 2026.

      Bids received after the above date and time will not be considered. Submitters will receive an email confirmation of receipt of the Bid. The District is not responsible for emails that fail to deliver regardless of the cause of the failure.  Email confirmations will be sent when Bids are received.

    • Submission of Bids

      Bids are to be submitted only on the prescribed Las Virgenes Municipal Water District Bid Forms included as part of this bid package and described in the Request for Bids and must be submitted through the Procurement Portal. Bid submission deadline is Tuesday, July 14, 2026; 5:00 pmFAXED, E-MAILED, OR MAILED BIDS WILL NOT BE ACCEPTED UNDER ANY CIRCUMSTANCES. ALL BIDS MUST BE SUBMITTED THROUGH THE PROCUREMENT PORTAL. Bidders are required to submit the following information with their bid:

      1. Completed proposal including bid schedule, designated materials list, and designated subcontractor's list 
      2. Acknowledgement of addendum(s), as issued
      3. Completed noncollusion declaration
      4. DIR license #
      5. Contractor license #
      6. Minimum three references (with Contact information) for projects of similar scope
      7. Completed bid bond, performance bond, and payment bond
      8. Certificate of Insurance

      These documents are to be physically completed and scanned/uploaded to the portal by the bid submission deadline. The apparent lowest bidder may be required to supply the physical originals to the District within 3 days 

    • Background

      LVMWD (The District) provides drinking water, wastewater treatment, recycled water, and composting for approximately 70,000 residents that live in Calabasas, Agoura Hills, Westlake Village, Hidden Hills, and unincorporated areas of Los Angeles County, which includes areas in West Hills, Chatsworth, and the Santa Monica Mountains. There are approximately 22,000 residential and commercial customers with metered water service and sewer connections. Triunfo Sanitation District (TSD) within Ventura County is a joint venture partner with LVMWD for wastewater and recycled water services. The Triunfo Joint Powers Authority (JPA) was formed between LVMWD and TSD in 1964 to construct, operate and maintain a joint wastewater treatment system for their respective service areas, primarily within the Malibu Creek Watershed. The JPA facilities include the Tapia Water Reclamation Facility (Tapia), the Rancho Las Virgenes Composting facilities (Rancho), approximately 60 miles of trunk sewers, and a recycled water transmission and distribution system. The District also maintains a potable water distribution system that includes a number of pump stations, pressure reducing stations, and miles of pipeline of various material.

      This Contract will include the as-needed pipeline repair, installation, and relocation of various types of pipeline in the District's potable water distribution system, recycled water distribution system, trunk sewer/collections system, and at the District's Tapia, Rancho, and Westlake Facilities. This Contract will also include pavement restoration and concrete work. This contract will meet the public works contracting requirements of a formal bidding process.

      This contract does not guarantee any minimum of work to the selected bidder. The contract will be awarded for an intial term of one year with 4 one year renewals (up to 5-years). The maximum dollar amount of all task orders issued under this contract per contract year shall not exceed $2,100,000. The assignment of tasks under this agreement is at the sole discretion of the District and the District will not compensate the selected contractor for any costs related to proposing for the contract, or for gathering and furnishing required documentation, insurance certificates, bonds, and other documentation required to establish eligibility to perform the work. All work and compensation in connection with this agreement must be expressly authorized by the District through formal request or task order.

    • Modification of Bids

      A bidder may modify its bid through the Procurement Portal, any time prior to the Bid Submission Deadline.

    • Term of Engagement

      It is anticipated that the engagement will be for one-year and up to four annual renewal options for a total of 5 years. The following are Bid milestones.

      Release Project Date:June 29, 2026
      Site Walk (Mandatory):July 7, 2026, 1:00pm

      Las Virgenes Municipal Water District HQ - 4232 Las Virgenes Road, Calabasas, CA, 91302

      Question Submission Deadline:July 10, 2026, 5:00pm
      Proposal Due Date:July 14, 2026, 5:00pm
      Award of Contract:August 3, 2026
    • Withdrawal and Return of bids

      Bids may be withdrawn without prejudice, through the Procurement Portal. Any bid received after the bid submission deadline shall be returned to the bidder unopened.

    • Discrepancies

      In the case of discrepancy between unit prices and extended totals, unit prices will prevail. In the case of discrepancy between words and figures, words will prevail.

    • Pricing

      Both unit and extended pricing shall be shown in U.S. dollar amounts; three decimal places may be used for unit price while extended price shall round to the nearest cent.

    • Award of Bid
      1. The District reserves the right to accept or reject any and all bids during the time for awarding the contract, and to waive any informality or irregularity in any bid. The District may reject any bid that does not comply with these instructions or other bid documents.
      2. Award shall be made on a comprehensive basis based on total estimated annual cost. At the District’s discretion, Inflation indicator may be a consideration in final award.
      3. The award of the bid, if it is awarded, shall be to the lowest responsible responsive bidder whose bid complies with the requirements of the bid documents. Bidder responsibility is determined solely by the District.
      4. It is expected that bids will be considered by the District at the regularly scheduled Board Meeting on August 3, 2026. Notice of Award, if any will occur within seven business days following the meeting. Accompanying the District’s Notice of Award will be a purchase order or contract. The successful bidder will be required to send an order acceptance to the District within seven days following receipt of Notice of Award. Failure to do so shall be just cause for annulment of the award. In the event of failure of the lowest responsible responsive bidder to provide order confirmation to the District, the District may award to the next lowest responsible responsive bidder.
    • Insurance Requirements

      Bidder at its’ sole cost and expense shall procure and maintain for the duration of the project the following types and minimum limits of insurance: 

      TypeLimitsScope
      General Liability (GL)

      $1,000,000 per occurrence/ $2,000,000 aggregateAt least as broad as ISO
      occurrence from CG 0001
      Product Liability

      $1,000,000 per occurrence/ $2,000,000 aggregate 
      Automotive Liability

      $1,000,000 per accident 

      At least as broad as ISO CA 0001 (code 1, any auto)
      Workers CompensationCA Statutory limits 
      Employers’ Liability$1,000,000 per occurrence 
      1. The general and automobile liability policy(ies) shall be endorsed (consistent with Ins. Code 11580.04) to name District, its officers, employees, and agents as additional insured regarding liability arising out of the Work. Bidder’s coverage shall be primary and shall apply separately to each insurer subject to a claim or lawsuit, except with respect to the limits of the insurer’s liability. District’s insurance if any, shall be excess and shall not contribute with Bidder’s insurance.
      2. Prior to commencing the Work, Bidder shall provide to District the following proof of insurance: (a) certificate(s) of insurance on ACORD Form 25-S (or insurer’s equivalent) evidencing the required insurance coverages; and (b) endorsement(s) on ISO Form CG 2010 (or insurer’s equivalent), signed by a person authorized to bind coverage on behalf of the insurer(s), certifying the additional insured coverages.
    • Non Collusion

      The bidder certifies that its bid is made without any previous understanding, agreement or connection with any person, firm or corporation making a bid for the same product as is in all respects fair, without outside control, collusion, fraud or otherwise illegal action.

    • Bid Specifications

      The attached specifications are intended to be descriptive of the type and quality of product the District desires to purchase. Any exceptions or substitutions to the Bid Scope & Specification must be clearly noted on Bid-Form Schedule. District reserves the right to determine if products meet equal value. Bidders will not be allowed to make unauthorized substitutions after award is made.

    • Confidential Information

      Bids containing confidential proprietary technical information or trade secrets which if publicly disclosed may cause substantial injury to the Bidder’s competitive position must be clearly noted. It is the bidder’s responsibility to clearly note any confidential design information as such.

    • Pre-Bid Inspection

      There will be a Mandatory Pre-Bid Inspection at 1:00 pm on Tuesday, July 7, 2026 at Las Virgenes Municipal Water District HQ - 4232 Las Virgenes Road, Calabasas, CA, 91302

    • Subcontractors

      IRS regulations require all employees be issued a W-2 form. Any worker issued a 1099 in lieu of or in conjunction with a W-2 will be considered a subcontractor. At any time during the contract the District may request payroll records to verify workers are employees and not subcontractors.

    • Special Conditions
      1. Any and all related fees associated with this bid shall be included in Bid Form-Schedule and extended bid total submitted by bidder. The District is located in Los Angeles County which, as of the date of this invitation to bid, has a sales tax rate of 9.75%.
      2. Any exceptions or modifications to the Bid Scope & Specifications or District’s Standard Purchase Order Terms and Conditions (Exhibit A) proposed by bidder must be clearly noted in area provided on Bid-Form Schedule.
      3. District has 90 days from the bid due date to accept bid pricing.

    Submission Requirements

    • Bid Form (required)

      The Bidder states and declares as follows:  that the bidder has carefully read and examined to project documents for On-Call/As-Needed Pipeline Repair and Pavement/Concrete Services, TBD; and that the bidder will comply with the bid terms and conditions. The Bidder agrees to supply and deliver materials in strict conformity with the specifications and instructions enclosed with the Request for Bids for the prices set forth in the Bid Form

      It is understood that this bid shall remain open and shall not be withdrawn for a period of ninety  (90) days from the date prescribed for the opening of the bid.

      It is further agreed that the materials/services to be furnished under this bid shall be delivered at  such time and in such quantities as called for by the Las Virgenes Municipal Water District.  The District  may extend the term of this contract by written notice to the supplier at the end of the contract period. 

      CONTRACT TERM as follows:  Initial contract term shall be good for one (1) year from date of contract  execution.  Four (4) additional one (1) year renewals may be negotiated at the District’s option.   

      Materials to be furnished under this bid shall be delivered FOB Destination Freight Pre‐Paid and  Allowed to the District HQ - 4232 Las Virgenes Municipal Water District, Calabasas, CA, 91302, Tapia Water Reclamation Facility, 731 Malibu Canyon  Road, Calabasas, CA  91302, Rancho Composting Facility  - 3700 Las Virgenes Road, Calabasas, CA, 91302, Westlake Filtration Plant, 32601 Torchwood Place, Westlake Village, CA  91361, or at any facility within the District service area in the manner set forth in the Bid Scope and Specifications. 

      The Bidder hereby declares that the representations in this bid are true and correct and of my own personal knowledge, and that these representations are made  under penalty of perjury under the laws of the State of California, and that I am duly authorized to bind  this bidder to this bid. 

    • Proposal Upload (required)

      Upload the following documents:

      A. Completed proposal included bid schedule

      B. Acknoweldgement of Addendum(s) issued

      C. Completed non-collusion declaration

      D. Completed Bid Bond

      E. Certificate of Insurance

    • DIR # (required)

      Please enter your DIR License Number here:

    • References (required)

      Contact information for three public entities related to On-Call/As-Needed Pipeline Repair and Pavement/Concrete Services.

      Please include Name and Contact Information of all references provided.

    • Contractor License # (required)

      Please enter your Class A License Contractor Number here

    • Provide minimum response time to a job (potable, recycled, sewer, facility) within the District service area (required)

      Minimum (1) one hour

    • Inflation Indicator: Bidder must list a specific set inflation indicator for annual renewal periods or state none in area provided on the bid-form schedule. Inflation indicator may be a flat percentage or based on a specific nationally published indicator such as a Bureau of Labor Statistics Consumer Price Index or Producer Price Index. Renewals will be based on listed indicator. (required)
    • It is expected that bids will be considered by the District at the regularly scheduled Board Meeting on ____________________. (required)

      Example: October 17, 2023

    • Is this solicitation subject to a Prequalification of Bidders? (required)
    • Prequalification of Bidders (required)

      This will require you to set your bid to "Make Private Bid" and "Require Invitation To Access Bid"

      This will allow you to send the project to your prequalification list of bidders.

      If you need further instruction, please review the Attachments tab and view the "Make Bid Private" document located in the Internal Docs area. 

    • Will there be a Pre-Bid Inspection? (required)
    • Is this a formal bid for LVMWD or JPA? (required)
    • Please make the appropriate selection: (required)
    • It is anticipated that the engagement will be for ________________________. (required)

    Key dates

    1. June 29, 2026Published
    2. July 15, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.