SLED Opportunity · ARIZONA · CITY OF TUCSON
AI Summary
City of Tucson seeks up to 10 engineering consultants for on-call services to design and manage new and replacement water distribution and transmission mains projects, including construction plans, hydraulic analysis, and construction administration.
The City of Tucson Water Project Management Section of Planning and Engineering Division is conducting a competitive ONE-STEP process to retain up to TEN (10) CONSULTANTS for the professional services of engineering consultants/firms to provide contract documents for construction plans, specifications, and construction cost estimates for new and replacement of potable and non-potable water distribution and transmission mains. Contract documents will include pipe corridor route study; pipe alignment, profile, material type, and sizing; hydraulic analysis; short main replacement; meter relocation with private plumbing; permanent and temporary On-Call construction easements; design memorandum; utility conflicts; traffic control; utility trench pavement; survey; and post design construction administration and inspection services. Individual project limit not to exceed one million dollars ($1,000,000). However, each project limit will be based on the project scope of work and needs for Tucson Water. Individual project will determine scope of work; budget; and schedule to accommodate wide variety of needs as determined by Tucson Water.
Attachment B - 260167_Exhibit Map_Estimated Projects and costs deleted.
The On-Call shall be for future Tucson Water Department projects to be determined on an as-needed basis.
See What Changed link to view all the changes made by this addendum.
Addendum deleted the evaluation criteria listing a SBE Plan requirement for this solicitation.
Please use the See What Changed link to view all the changes made by this addendum.
a. Principals Involvement
b. Registered Professional Engineer
c. Project Manager, CAD Production staff, & Supporting staff
d. Key Sub-consultants
a. Identify the following internal policies and procedures that will be used to assure a quality product and completion of the project on schedule and within budget:
i. Management & Organization Capabilities
ii. Quality and Cost Control Internal Procedures & Polices
b. Identify and include qualifications of any critical sub-consultants or subcontractors, including any potential Small Business Enterprise (SBE) Firms. Focus on providing support to execute
delivery related to distribution and transmission mains projects.
c. Indicate whether or not your firm has been involved in any litigation or has filed bankruptcy.
a. Identify each team member’s role in the projects identified. Specify if work was completed while employed under submitting firm or another firm.
b. Identify type and location of similar work to illustrate the work quality.
c. Show how the experience relates to the Scope of Work outlined.
a. Include project title, address, construction cost and year completed.
b. Provide: Names of Project Owners; Addresses; Phone Numbers; & Email Address
c. If Applicable, provide firm’s Prior Experience with the City of Tucson:
i. City of Tucson Contracts – Work in Progress
ii. Provide the following information for a list of applicable contracts:
a. Dates of Award
b. Project Names and City of Tucson (COT) Contract Number
c. Name of Using Department & Project Manager
A. Describe familiarity of your firm with the following on similar projects:
a. Tucson Water Standard Specifications and Details, 2017 Edition, with latest updates, and Administrative Directives.
b. Tucson Water Design Standards Manual, 2005 Edition, with latest updates.
c. Arizona Administrative Code Title 18, R18-5-502, with other codes as applicable.
d. Pima Association of Governments (PAG) Standard Specifications for Public Improvements, 2015 Edition, with latest updates.
e. Pima Association of Governments (PAG), Standard Details for Public Improvements, 2015 Edition, with latest updates.
a. List Investigation & Data Management Approaches for projects of similar size and scope.
b. Describe Your Firm’s Planned Approach for projects of similar size and scope.
c. Describe Your Firm’s Planned Methodology for projects of similar size and scope.
d. Describe analytical tools commonly used by your firm applicable to this project.
a. Submit a typical Organizational Chart of personnel to be assigned to a project together with the specific aspects of the project to which the designated individual will be involved.
b. The chart should show the estimated time commitments of project manager and core project staff as a percentage of the unit total time for a project.
c. The chart should clearly show if team members are from local or other offices or from associated firms.
a. Description of the project
b. Project’s original contracted construction cost and final construction cost
c. Construction dates
d. Project Owner
e. Reference information (two current names with telephone numbers per project)
Please ensure that all required information is included with your response.
Please upload your Cover Letter.
Please upload your Statement of Qualifications in response to the Evaluation Criteria.
Please upload your signed Offer and Acceptance form. If selected, you agree to enter into negotiations with the City to provide the material or service in compliance with all terms, scope of work, conditions, specifications, and amendments in the solicitation.
Please note: The City of Tucson is a public agency subject to public records laws. Therefore, all requests to withhold information from the public record must be accompanied by justification. Pricing will not be held confidential.
If you answered yes, then you must use this field to identify the sections of your submittal that you are requesting be withheld from public record.
If sections are not identified as confidential in this field, your request to hold information confidential may not be accepted.
Please note: The City of Tucson is a public agency subject to public records laws. Therefore, all requests to withhold information from the public record must be accompanied by justification. Pricing will not be held confidential.
In accordance with Instructions to Offerors - Exceptions to Contract Provisions, any exceptions that an offeror wishes to submit for the City's consideration must be indicated here in order to be considered.
In accordance with Instructions to Offerors - Exceptions to Contract Provisions, any exceptions that an offeror wishes to submit for the City's consideration must be indicated here in order to be considered.
What are the two publication dates for "The Daily Territorial" for this project:
Use the following format: Wednesday, June 25, 2021 and Wednesday, July 2, 2021
Which type of project will you be doing?
What is the initial term for the contract resulting from this solicitation?
Please use the following format: one (1)
Even if you selected automatic renewal, you still need the initial term, i.e. one (1)
What are the renewal options for the contract resulting from this solicitation?
Please use the following format: two (2) additional two (2) year
If there are no renewal options or you selected automatic renewals, type "N/A".
Please select the type of process for this solicitation.
Is this project Federally Funded?
Will a pre-submittal conference be held for this project?
How many firms will be retained for this project?
Use the following format - approximately two (2)
Please provide the dollar amount of the estimated annual budget for this project.
Use the following format - two-hundred fifty thousand dollars ($250,000)
What is the dollar amount for typical projects?
Use the following format - two-hundred fifty thousand dollars ($250,000)
Please select the number of short-listed firms
Use the following: approximately three (3) firms
The individual project is not to exceed...
Please use the following format: one-hundred thousand dollars ($100,000)
Please select the required language that should be included under Special Terms and Conditions for this project. Please select all that apply.
Will this contract resulting from this solicitation have renewal options?
If regular renewals, select yes. If automatic renewals, select automatic.
Is this project for the Water Department?
Do you have any attachments?
Please select the additional insurance coverages required for this project. Please select all that apply.
Q (Subconsultants): For the subconsultants we include on our team Organizational Chart – are we limited to using only those, or can we add/use new subconsultants during the lifespan of this contract?
A: See the Special Terms and Conditions, Key Personnel, paragraph 7.11. With City review and acceptance to proposed changes the Subconsultants may be adjusted during the life of the contract.
Q (5A. Describe the resources commonly used by your firm applicable to this project.): When referring to resources, can you clarify if you are looking for staff, subcontractors, or tools commonly used?
A: Resources means staff, subcontractors, tools commonly used, etc.
Q (5F. Submit a proposed Subcontractor Selection Plan pursuant to ARS 34-603. The plan must describe procedures to be used in selecting subcontractors, and selection shall be based on a combination of qualifications and price.): Will a detailed description of our subcontractor selection process fulfill this requirement?
A: Yes a detailed description of the subcontractor selection process will fulfill this requirement.
Q (5G: The resultant contract is subject to the City of Tucson’s SBE requirements. The plan must describe how the Offeror intends to ensure that established goals will be met. In addition, the plan should include the firm’s prompt payment plan/policy.): Will a detailed description of our subcontractor selection process fulfill this requirement?
A: Yes a detailed description to the firms subcontractor selection process including the two descriptions required will fulfill this requirement.
Q (Exhibit Map): How many projects from the exhibit map do you plan on including for this on call?
A: An addendum deleting the exhibit map to be processed. The On-Call shall be for future Tucson Water Department projects to be determined on an as-needed basis.
Q (Exhibit Map): Are all of the projects shown on the exhibit map still active projects and are the dates on the exhibit map correct (e.g.FY22-24)?
A: See City response to Question 5.
Q (Subconsultants): Could you please clarify whether a subconsultant is required for each of the scope tasks outlined in the request?
A: Per the SBE Requirements an SBE goal and plan shall be established for projects at $100,000 or more. See attachments to review the - SBE Provisions...
Q (Subcontractor Selection Plan): Please confirm that a subcontractor selection plan is not required for this solicitation. On the previous solicitation for this on-call in 2020, the requirement to submit a subcontractor selection plan was removed as part of Amendment 1 to that RFQ. According to ARS 34-603.C.2.e., a subcontractor selection plan is for procurement of construction services. Since this current procurement is not for construction services, but for professional design services, a subcontractor selection plan should not be required. Instead, the project team should include appropriate subconsultants necessary to deliver the needs of the contract.
A: The Subcontractor selection plan is not required for this solicitation. An Addenda to follow deleting the Subcontractor selection plan listed within the evaluation criteria. Note to future contract award: An SBE Plan will be required for future projects to the awarded contract(s) with a value of $100,000 or more based on the Attachment titled "SBE Provisions" and the City Procurement Code, Sec. 28-151.1., titled SBE Plans for Eligible Design Projects.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.