Active SLED Opportunity · GEORGIA · GEORGIA

    Peachtree Creek Greenway Doraville Extension - Phase 2a Construction

    Issued by Doraville, City Of
    stateITBgeorgiaSol. PE-64452-NONST-2026-000000034
    Open · 14d remaining
    DAYS TO CLOSE
    14
    due May 8, 2026
    PUBLISHED
    Apr 1, 2026
    Posting date
    JURISDICTION
    georgia
    state
    NAICS CODE
    237310
    AI-classified industry

    AI Summary

    The City of Doraville seeks bids for construction of the Peachtree Creek Greenway Phase 2A, including a concrete trail, sidewalk improvements, bridge, retaining walls, landscaping, and stormwater management. Coordination with school construction is required.

    Opportunity details

    Solicitation No.
    PE-64452-NONST-2026-000000034
    Type / RFx
    ITB
    Status
    Open
    Level
    state
    Published Date
    April 1, 2026
    Due Date
    May 8, 2026
    NAICS Code
    237310AI guide
    Jurisdiction
    georgia
    State
    georgia
    Agency
    Doraville, City Of

    Description

    The City of Doraville (hereafter, ¿City¿) has issued this Invitation to Bid (hereafter, ¿ITB¿) for the purpose of obtaining services to construct the Doraville Peachtree Creek Greenway Phase 2A. The Doraville Peachtree Creek Greenway Phase 2A connects Aztec Road to Stewart Road along the north side of the tributary of Peachtree Creek. This is the model project segment outlined in the adopted 2022 Peachtree Creek Greenway Feasibility Study. This trail is being built within public right-of-way and on city easement within DeKalb County Board of Education (Sequoyah Middle School). The project is approximately 2,551 linear feet (0.5 miles) and includes a 10¿ to 12¿ wide concrete trail. 630 linear feet of the project will include sidewalk improvements with new ADA accessible ramps along existing streets. The project scope also include one bridge crossing, retaining walls, landscape, and stormwater improvements. Additional work associated with the project includes minor demolition and clearing, erosion control, grading, trail amenities, and signage. The new middle school is expected to open in Fall 2027, and the high school in Fall 2029. Contractors shall coordinate with the general contractor, site superintendent, and others as needed to ensure that construction activities shall not interfere with the school construction. Contact information will be provided by the City.

    Key dates

    1. April 1, 2026Published
    2. May 8, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.