SLED Opportunity · MICHIGAN · GLEESON CONSTRUCTORS

    Penske - New Facility - Plymouth, MI

    Issued by Gleeson Constructors
    localDefault Bid TypeGleeson ConstructorsSol. E26-117
    Closed
    STATUS
    Closed
    due Mar 3, 2026
    PUBLISHED
    Feb 13, 2026
    Posting date
    JURISDICTION
    Gleeson Constructors
    local
    NAICS CODE
    236220
    AI-classified industry

    AI Summary

    Construction bid opportunity for a new 31,821 SF facility in Plymouth, MI including site work, concrete, masonry, metals, HVAC, electrical, plumbing, fire protection, and more. Open shop project managed by Gleeson Constructors with a prebid meeting on Feb 19, 2026.

    Opportunity details

    Solicitation No.
    E26-117
    Type / RFx
    Default Bid Type
    Status
    active
    Level
    local
    Published Date
    February 13, 2026
    Due Date
    March 3, 2026
    NAICS Code
    236220AI guide
    Agency
    Gleeson Constructors

    Description

    Bidding Instructions: 1. Send all bids to estimating@gleesonconstructors.com. Uploading to buildingconnected.com is NOT necessary. 2. This project is Open Shop / Non-Prevailing Wage 3. Prebid meeting is set for Thursday, Feb. 19th at 10:30 AM. All whose work is impacted by existing conditions are highly encouraged to attend. New construction of a 31,821 SF facility that includes complete site work. SCOPE OF WORK CONSISTS OF: Division 01 General Requirements: Indoor Air Quality Management, Construction Waste Management and Disposal, Sustainable Design Requirements, General Commissioning Requirements, Commissioning of Enclosure System Division 2 Existing Conditions: Demolition Division 3 Concrete: Cast-In-Place Concrete, Polished Concrete Finishing (Alternate) Division 4 Masonry: Concrete Unit Masonry Division 5 Metals: Structural Steel, Steel Joist Framing, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Pan Stairs, Aluminum Ladders, Pipe and Tube Railings Division 6 Wood and Plastics: Rough Carpentry, Interior Architectural Woodwork Division 7 Thermal and Moisture Protection : Dampproofing, Thermal Insulation, Foamed-in-place Masonry Wall Insulation, Thermoplastic Polyolefin (TPO) Roofing, Sheet Metal Flashing and Trim, Roof Accessories, Penetration Firestopping, Joint Firestopping, Joint Sealants Division 8 Doors and Windows: Hollow Metal Doors and Frames, Flush Wood Doors, Fiberglass Reinforced Plastic (Frp) Doors and Frames, Sectional Doors, Aluminum-framed Entrances and Storefronts, Aluminum Sliding Service Windows, Door Hardware, Glazing Division 9 Finishes: Interior Materials & Finish Schedule, Exterior Materials & Finish Schedule, Gypsum Board Assemblies, Tiling, Ceramic Tile, Acoustical Panel Ceilings, Resilient Wall Base and Accessories, Resilient Flooring, Interface Carpet Order Form, Tile Carpeting, Painting Division 10 Specialties: Toilet Compartments, Impact-resistant Wall Protection, Toilet Accessories, Metal Lockers, Miscellaneous Specialties Division 11 Equipment: Compressed Air System, Lubrication System Equipment Division 12 Furnishings: Window Treatments Division 13 Special Construction: Metal Building Systems (By Owner) Division 21 Fire Protection: Fire Protection/Sprinkler System Division 22 Plumbing: Plumbing General Conditions, Plumbing Insulation, Commissioning of Plumbing Systems, Domestic Water Distribution, Domestic Water Booster Pump, Sanitary Distribution System, Storm Drainage Distribution, Domestic Water Softener, Domestic Water Heating System, Plumbing Fixtures Division 23 HVAC: Mechanical Materials And Methods, Testing, Adjusting And Balancing, Mechanical Insulation, Commissioning Of HVAC Systems, Natural Gas System Piping, Fuel Storage And Distribution System, HVAC Piping, HVAC Specialties, Refrigerant Piping And Accessories, Exhaust Fans And Accessories, High-volume, Low Speed Fans, Air Terminal Units, Packaged, Rooftop Air-conditioning Units, Packaged, Direct Fired, Outdoor, Heating-only Makeup Air Units, Mini Split System, Variable Refrigerant Flow HVAC Systems, Space Heating Equipment, High Efficiency Gas Condensing Boiler, Radiant-heating Hydronic Piping, Ductwork And Accessories Division 26 Electrical: Electrical Work General Conditions, Secondary Grounding, Supporting Devices, Raceways, Vibration and Seismic Controls for Electrical Systems, Wiring Devices, Electrical Identification, Commissioning of Electrical Systems, Wires and Cables, Panelboards, Disconnect Switches, Lighting Fixtures, Emergency Lighting Equipment Division 27 Communications: Service Entrance 600 Volts or Less, Telephone & Data Cabling, Telephone Service Entrance Division 28 Electronic Safety and Security: Surveillance and Access Control System, Toxic Gas Detection, Natural Gas Detection System Division 31 Earthwork: Site Clearing, Earth Moving Division 32 Exterior Improvements : Asphalt Paving, Concrete Paving, Chain Link Fences and Gates, Ornamental Steel Fence and Gate Systems Division 33 Utilities: Water Service Piping, Sanitary Sewer System, Storm Sewer System Division 41 Material Processing and Handling Equipment: Cranes and Hoist

    Key dates

    1. February 13, 2026Published
    2. March 3, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.