Active SLED Opportunity · CALIFORNIA · PORT OF PORTLAND
AI Summary
Portland International Center Basin 8 Outfall Improvements involve stormwater system upgrades including pipe installation, manholes, grading, sidewalks, curbs, pavement, electrical conduits, trenching, and landscaping at Portland International Center.
Improvements to the existing Basin 8 outfall system at Portland International Center (PIC). The work includes providing large diameter stormwater pipe, temporary stormwater diversion, manholes, headwalls, grading, sidewalks, curbs, asphalt pavement, electrical conduits, trenching, and landscaping. Estimated Bid Value: The estimated value will be provided after the time bids are due and not before. Pre-Bid Meeting Information: Yes Online Q&A: Yes Location Information: Department: Engineering Address: 7200 NE Airport WayPortland, Oregon97218 County: Multnomah License Requirements: See the project manual Notes: Hard copies are not available for purchase through this site.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.