Active SLED Opportunity · CALIFORNIA · DONNER SUMMIT PUD
AI Summary
Donner Summit PUD seeks engineering consulting services to prepare a Preliminary Design Report for a potable water system interconnection with Sierra Lakes County Water District. The design will support environmental review, permitting, funding, and final design advancement.
The Donner Summit Public Utility District (DSPUD) is soliciting Proposals from qualified consulting firms to provide engineering services to prepare a Preliminary Design Report (PDR) for a potable water system interconnection with Sierra Lakes County Water District (SLCWD). The purpose of this project is to develop and define the interconnection alternative at approximately the 10 percent design level sufficient to support environmental review, regulatory permitting, funding applications, and advancement to final design. **Solicitation Type**: RFP - Request for Proposal (Formal) **Source ID**: PU.AG.USA.2563617.C15914451 **Piggyback Contract**: No **Question Acceptance Deadline**: 05/02/2026 08:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: Donner Summit Public Utility District **Solicitation Number**: 2026-01 **Reference Number**: 0000421925 **Pricing**: Lump sum **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | No | No | **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | No | No |
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.